Civil Works (Horizontal) MATOC - Tulsa District Amendment 0004
Closed Solicitation Posted
This opportunity was awarded. See its 5 award notices in the notice history.
- Solicitation number
- W912BV-20-R-0025
- Agency
-
ENDIST Tulsa
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Tulsa Ok Usa
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks proposals for multiple award task order contracts (MATOCs) to provide civil engineering, construction, and related services to support infrastructure maintenance and repair projects for the Tulsa District of the U.S. Army Corps of Engineers. The scope of work includes a wide range of design-build and design-bid-build services for roads, structures, utilities, drainage systems, and shoreline protection. The Corps intends to award up to five MATOC contracts for a base period of three years plus two optional one-year extensions using a one-step best value evaluation of technical merit, past performance, and price. Proposals are due by July 7, 2020.
The solicitation is set aside for small businesses and uses NAICS code 237990 with a $39.5 million size standard. The potential MATOC awards have a total shared capacity of $49.5 million to be issued across multiple task orders over the five-year contract period, with work to be performed in Oklahoma, Kansas, and northern Texas. Site visits were conducted in June 2020 for a seed task order involving repairs to a creek channel in Bixby, Oklahoma.
Notice text
7 versions
Update #7 · Latest ·
The scope of this acquisition includes a wide range of design-bid-build (DBB) requirements to include but not necessarily limited to projects for new utilities, relocation of existing utilities, maintenance, repair, and rehabilitation of roads and other pave surfaces, small inhabitable structures, revetment and shoreline protection, small concrete outlet work and control structures, foundation drainage systems, and other ancillary features that support flood control and navigation infrastructure.
Disciplines and related work requirements may include, but are not limited to:
(1) Civil Engineering, Construction, and Related Activities – Construction surveying, grading and earthwork, dredging, toe drains, surface and subsurface storm drainage and control structures, storm water management, erosion and sediment control, shoreline protection, clearing and grubbing, paving and surfacing for roads, parking areas, and sidewalks, parking layout, pavement markings, traffic control and signage, gates and fencing, curbs and gutters, railroads, dewatering, landscaping, seeding, sprigging, and sodding, riprap and stone protection, retaining walls, buried structures, slope stabilization, foundations, borings, trenching, berms and utility relocation;
(2) Structural Engineering, Construction, and Related Activities - Rehabilitation or replacement of concrete structures associated with flood control or navigation infrastructures; and
(3) Utilities - Sanitary sewers, lighting, and installation or relocation of other utilities as required for road repair and rebuilding or other site work.
The expected contract duration will be for a pool of up to five (5) MATOCs for a five (5) year contract (three (3) year base plus two (2) one year options.
Site Visit Date/Time/Location/POC listed on 20-R-0025-0001 Attachment 2 - MATOC SEED TO Specs_Plans Fry Creek Channel Repair (Rev 1) 15JUN2020.pdf.
SITE VISIT INFORMATION:
DATE: 19 June 2020
TIME: 09:00a.m. CST
LOCATION: Life Church South Tulsa parking lot off East 121st St S in Bixby, Oklahoma. All personnel will park
and walk over to the Fry Creek project location.
Amendment 0002:
(1) Update Section 00 22 11 paragraphs 5.2.2.3, 7.2.2.3 and Attachment 3.
(2) Update 52.216-1
Amendment 0003:
(1) Update 7.2 under Section 00 22 11 to reflect Volume 1.
(2) Update 7.3.1.1 under Section 00 22 11 to reflect Tab H.
(3) Update 8.1.1.4 under Section 00 22 11.
(4) Update 9.39.5 under Section 01 10 00.
(5) Update Attachment 2 to reflect updated Pricing Schedule and Draw ings.
Amendment 0004:
(1) Remove "2. Stabilization of existing concrete ramp by placement of 600 psi ODOT Controlled Low -Strength Material (CLSM) and form work;" from Section 00 21 00 paragraph 1.1, Section 00 22 11 paragraph 1.0 and Section 01 00 00 paragraph 3.1 from Attachement 2.
Update #6 ·
The scope of this acquisition includes a wide range of design-bid-build (DBB) requirements to include but not necessarily limited to projects for new utilities, relocation of existing utilities, maintenance, repair, and rehabilitation of roads and other pave surfaces, small inhabitable structures, revetment and shoreline protection, small concrete outlet work and control structures, foundation drainage systems, and other ancillary features that support flood control and navigation infrastructure.
Disciplines and related work requirements may include, but are not limited to:
(1) Civil Engineering, Construction, and Related Activities – Construction surveying, grading and earthwork, dredging, toe drains, surface and subsurface storm drainage and control structures, storm water management, erosion and sediment control, shoreline protection, clearing and grubbing, paving and surfacing for roads, parking areas, and sidewalks, parking layout, pavement markings, traffic control and signage, gates and fencing, curbs and gutters, railroads, dewatering, landscaping, seeding, sprigging, and sodding, riprap and stone protection, retaining walls, buried structures, slope stabilization, foundations, borings, trenching, berms and utility relocation;
(2) Structural Engineering, Construction, and Related Activities - Rehabilitation or replacement of concrete structures associated with flood control or navigation infrastructures; and
(3) Utilities - Sanitary sewers, lighting, and installation or relocation of other utilities as required for road repair and rebuilding or other site work.
The expected contract duration will be for a pool of up to five (5) MATOCs for a five (5) year contract (three (3) year base plus two (2) one year options.
Site Visit Date/Time/Location/POC listed on 20-R-0025-0001 Attachment 2 - MATOC SEED TO Specs_Plans Fry Creek Channel Repair (Rev 1) 15JUN2020.pdf.
SITE VISIT INFORMATION:
DATE: 19 June 2020
TIME: 09:00a.m. CST
LOCATION: Life Church South Tulsa parking lot off East 121st St S in Bixby, Oklahoma. All personnel will park
and walk over to the Fry Creek project location.
Amendment 0002:
(1) Update Section 00 22 11 paragraphs 5.2.2.3, 7.2.2.3 and Attachment 3.
(2) Update 52.216-1
Amendment 0003:
(1) Update 7.2 under Section 00 22 11 to reflect Volume 1.
(2) Update 7.3.1.1 under Section 00 22 11 to reflect Tab H.
(3) Update 8.1.1.4 under Section 00 22 11.
(4) Update 9.39.5 under Section 01 10 00.
(5) Update Attachment 2 to reflect updated Pricing Schedule and Draw ings.
Update #5 ·
The scope of this acquisition includes a wide range of design-bid-build (DBB) requirements to include but not necessarily limited to projects for new utilities, relocation of existing utilities, maintenance, repair, and rehabilitation of roads and other pave surfaces, small inhabitable structures, revetment and shoreline protection, small concrete outlet work and control structures, foundation drainage systems, and other ancillary features that support flood control and navigation infrastructure.
Disciplines and related work requirements may include, but are not limited to:
(1) Civil Engineering, Construction, and Related Activities – Construction surveying, grading and earthwork, dredging, toe drains, surface and subsurface storm drainage and control structures, storm water management, erosion and sediment control, shoreline protection, clearing and grubbing, paving and surfacing for roads, parking areas, and sidewalks, parking layout, pavement markings, traffic control and signage, gates and fencing, curbs and gutters, railroads, dewatering, landscaping, seeding, sprigging, and sodding, riprap and stone protection, retaining walls, buried structures, slope stabilization, foundations, borings, trenching, berms and utility relocation;
(2) Structural Engineering, Construction, and Related Activities - Rehabilitation or replacement of concrete structures associated with flood control or navigation infrastructures; and
(3) Utilities - Sanitary sewers, lighting, and installation or relocation of other utilities as required for road repair and rebuilding or other site work.
The expected contract duration will be for a pool of up to five (5) MATOCs for a five (5) year contract (three (3) year base plus two (2) one year options.
Site Visit Date/Time/Location/POC listed on 20-R-0025-0001 Attachment 2 - MATOC SEED TO Specs_Plans Fry Creek Channel Repair (Rev 1) 15JUN2020.pdf.
SITE VISIT INFORMATION:
DATE: 19 June 2020
TIME: 09:00a.m. CST
LOCATION: Life Church South Tulsa parking lot off East 121st St S in Bixby, Oklahoma. All personnel will park
and walk over to the Fry Creek project location.
Amendment 0002:
(1) Update Section 00 22 11 paragraphs 5.2.2.3, 7.2.2.3 and Attachment 3.
(2) Update 52.216-1
Update #4 ·
The scope of this acquisition includes a wide range of design-bid-build (DBB) requirements to include but not necessarily limited to projects for new utilities, relocation of existing utilities, maintenance, repair, and rehabilitation of roads and other pave surfaces, small inhabitable structures, revetment and shoreline protection, small concrete outlet work and control structures, foundation drainage systems, and other ancillary features that support flood control and navigation infrastructure.
Disciplines and related work requirements may include, but are not limited to:
(1) Civil Engineering, Construction, and Related Activities – Construction surveying, grading and earthwork, dredging, toe drains, surface and subsurface storm drainage and control structures, storm water management, erosion and sediment control, shoreline protection, clearing and grubbing, paving and surfacing for roads, parking areas, and sidewalks, parking layout, pavement markings, traffic control and signage, gates and fencing, curbs and gutters, railroads, dewatering, landscaping, seeding, sprigging, and sodding, riprap and stone protection, retaining walls, buried structures, slope stabilization, foundations, borings, trenching, berms and utility relocation;
(2) Structural Engineering, Construction, and Related Activities - Rehabilitation or replacement of concrete structures associated with flood control or navigation infrastructures; and
(3) Utilities - Sanitary sewers, lighting, and installation or relocation of other utilities as required for road repair and rebuilding or other site work.
The expected contract duration will be for a pool of up to five (5) MATOCs for a five (5) year contract (three (3) year base plus two (2) one year options.
Site Visit Date/Time/Location/POC listed on 20-R-0025-0001 Attachment 2 - MATOC SEED TO Specs_Plans Fry Creek Channel Repair (Rev 1) 15JUN2020.pdf.
SITE VISIT INFORMATION:
DATE: 19 June 2020
TIME: 09:00a.m. CST
LOCATION: Life Church South Tulsa parking lot off East 121st St S in Bixby, Oklahoma. All personnel will park
and walk over to the Fry Creek project location.
Update #3 ·
The scope of this acquisition includes a wide range of design-bid-build (DBB) requirements to include but not necessarily limited to projects for new utilities, relocation of existing utilities, maintenance, repair, and rehabilitation of roads and other pave surfaces, small inhabitable structures, revetment and shoreline protection, small concrete outlet work and control structures, foundation drainage systems, and other ancillary features that support flood control and navigation infrastructure.
Disciplines and related work requirements may include, but are not limited to:
(1) Civil Engineering, Construction, and Related Activities – Construction surveying, grading and earthwork, dredging, toe drains, surface and subsurface storm drainage and control structures, storm water management, erosion and sediment control, shoreline protection, clearing and grubbing, paving and surfacing for roads, parking areas, and sidewalks, parking layout, pavement markings, traffic control and signage, gates and fencing, curbs and gutters, railroads, dewatering, landscaping, seeding, sprigging, and sodding, riprap and stone protection, retaining walls, buried structures, slope stabilization, foundations, borings, trenching, berms and utility relocation;
(2) Structural Engineering, Construction, and Related Activities - Rehabilitation or replacement of concrete structures associated with flood control or navigation infrastructures; and
(3) Utilities - Sanitary sewers, lighting, and installation or relocation of other utilities as required for road repair and rebuilding or other site work.
The expected contract duration will be for a pool of up to five (5) MATOCs for a five (5) year contract (three (3) year base plus two (2) one year options.
Site Visit Date/Time/Location/POC listed on 20-R-0025-0001 Attachment 2 - MATOC SEED TO Specs_Plans Fry Creek Channel Repair (Rev 1) 15JUN2020.pdf.
Update #2 ·
The scope of this acquisition includes a wide range of design-bid-build (DBB) requirements to include but not necessarily limited to projects for new utilities, relocation of existing utilities, maintenance, repair, and rehabilitation of roads and other pave surfaces, small inhabitable structures, revetment and shoreline protection, small concrete outlet work and control structures, foundation drainage systems, and other ancillary features that support flood control and navigation infrastructure.
Disciplines and related work requirements may include, but are not limited to:
(1) Civil Engineering, Construction, and Related Activities – Construction surveying, grading and earthwork, dredging, toe drains, surface and subsurface storm drainage and control structures, storm water management, erosion and sediment control, shoreline protection, clearing and grubbing, paving and surfacing for roads, parking areas, and sidewalks, parking layout, pavement markings, traffic control and signage, gates and fencing, curbs and gutters, railroads, dewatering, landscaping, seeding, sprigging, and sodding, riprap and stone protection, retaining walls, buried structures, slope stabilization, foundations, borings, trenching, berms and utility relocation;
(2) Structural Engineering, Construction, and Related Activities - Rehabilitation or replacement of concrete structures associated with flood control or navigation infrastructures; and
(3) Utilities - Sanitary sewers, lighting, and installation or relocation of other utilities as required for road repair and rebuilding or other site work.
The expected contract duration will be for a pool of up to five (5) MATOCs for a five (5) year contract (three (3) year base plus two (2) one year options.
An Amendment will come out later with the date, time and location for the site visit pertaining to the seed task order.
Update #1 ·
The scope of this acquisition includes a wide range of Design-Build (DB) or Design-Bid-Build (DBB) civil engineering, structural engineering, new utilities and relocation of existing utilities, and heavy construction activities. The MATOC contracts are intended for maintenance, repair, and rehabilitation of roads and other paved surfaces, small inhabitable structures, revetment and shoreline protection, small concrete outlet works and control structures, foundation drainage systems, and other ancillary features that support flood control and navigation infrastructures.
Disciplines and related work requirements may include, but are not limited to:
(1) Civil Engineering, Construction, and Related Activities – Construction surveying, grading and earthwork, dredging, toe drains, surface and subsurface storm drainage and control structures, storm water management, erosion and sediment control, shoreline protection, clearing and grubbing, paving and surfacing for roads, parking areas, and sidewalks, parking layout, pavement markings, traffic control and signage, gates and fencing, curbs and gutters, railroads, dewatering, landscaping, seeding, sprigging, and sodding, riprap and stone protection, retaining walls, buried structures, slope stabilization, foundations, borings, trenching, berms and utility relocation;
(2) Structural Engineering, Construction, and Related Activities - Rehabilitation or replacement of concrete structures associated with flood control or navigation infrastructures; and
(3) Utilities - Sanitary sewers, lighting, and installation or relocation of other utilities as required for road repair and rebuilding or other site work.
The expected contract duration will be for a pool of up to five (5) MATOCs for a five (5) year contract (three (3) year base plus two (2) one year options.
An Amendment will come out later with the date, time and location for the site visit pertaining to the seed task order.
Files
Show all 21
Notice history
| Notice | Type | Posted |
|---|---|---|
| Civil Works (Horizontal) MATOC - Tulsa District Award | Award Notice | |
| Civil Works (Horizontal) MATOC - Tulsa District Award | Award Notice | |
| Civil Works (Horizontal) MATOC - Tulsa District Award | Award Notice | |
| This notice | Solicitation | |
| Civil Works (Horizontal) MATOC - Tulsa District | Pre-Solicitation | |
| Civil Works (Horizontal) MATOC - Tulsa District | Pre-Solicitation |
6 of 8 notices listed here. See the rest on GovTribe.
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Small Business D/B Military Construction MATOC | ENDIST Louisville | Total Small Business | |
| USACE Omaha District - $249M Unrestricted Sentinel Construction Management Services (CMS) MATOC | ENDIST Omaha | No set-aside | |
| Vertical Construction MATOC | ENDIST Mobile | Total Small Business | |
| Water Resources Analytical and Professional Support Services - Multiple Award Task Order Contract (MATOC) | Humphreys Engineer Center Support Activity | No set-aside | |
| SB ERS MATOC, USACE Northwestern Division and EPA Region 2 | ENDIST Kansas City | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity