This solicitation is for a pool of up to five Multiple Award Task Order Contracts (MATOCs) to support a wide range of civil engineering, construction, and related activities for the U.S. Army Corps of Engineers Tulsa District. Services include projects for new and relocated utilities, maintenance and repair of roads and structures, revetment, drainage, and other flood control and navigation infrastructure support. Disciplines involve civil, structural, and utility construction. The expected five-year MATOCs have a three-year base and two one-year options, with task orders awarded on a firm-fixed-price basis. The 100% small business set-aside has a response date of July 7, 2020 and supports an estimated $49.5 million in task order capacity across the pool.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912BV20R0025
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
(1) Extend proposal due date from 05 July 2020 to 07 July 2020.
(2) Update Sections 00 21 00, 01 30 00 and 01 45 00 in Attachment 1.
(3) Update Section 01 00 00 in Attachment 2.
(4) Update Sections 00 21 00 and 00 22 11 in the solicitation.
(5) Update 52.228-1 to reflect Bid Guarantee applies to the Task Order in the solicitation.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 29
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Jun-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912BV20R0025
X 9B. DATED (SEE ITEM 11)
05-Jun-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Jun-2020
CODE
CONTRACTING DIV
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
2488 E. 81ST STREET
TULSA OK 74137-4290
W912BV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION 00 11 00 - SF 1442 AND CLIN SCHEDULE
SUMMARY OF CHANGES
SECTION 00 01 10 - TABLE OF CONTENTS
The following have been modified:
ATTACHMENT TABLE OF CONTENTS
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 20-R-0025-0001 Attachment 1 – Civil Works MATOC Specs (Rev 1) 15JUN2020 190 14 APR 2020
Attachment 2 20-R-0025-0001 Attachment 2 – MATOC SEED TO
Specs_Plans Fry Creek Channel Repair (Rev 1)
15JUN2020 79 22 APR 2020
SECTION 00 11 00 - SF 1442 AND CLIN SCHEDULE
The required response date/time has changed from 05-Jul-2020 02:00 PM to 07-Jul-2020 02:00 PM.
SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS
1.0 GENERAL INFORMATION
1.1 GENERAL DESCRIPTION OF WORK
1.2 GOVERNMENT SECURITY REQUIREMENTS
1.3 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
1.4 OFFEROR'S QUESTIONS AND COMMENTS
1.5 SMALL BUSINESS SIZE STANDARD/NAICS CODE
1.6 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
1.7 SITE VISIT
1.8 ACCURACY IN PROPOSALS
1.9 PROPOSAL SUBMITTALS
1.10 PROPOSAL FORMAT
1.11 JOINT VENTURE PROPOSAL REQUIREMENTS
1.12 DEVIATIONS AND EXCEPTIONS
1.0 GENERAL INFORMATION
1.1. GENERAL DESCRIPTION OF WORK
This is a competitive solicitation set aside for 100% Small Business firms for a total of five (5) firm, fixed-price Indefinite-Delivery, Indefinite-Quantity (IDIQ), Multiple-Award Task Order Contracts (MATOC) that will have a 3-year base period and two 1-year options with a shared capacity of $49,000,000. The MATOCs will support a wide range of design-bid-build (DBB) construction projects to meet the requirements and time constraints for Civil Works (CW) projects within the Southwestern Division (SWD) Tulsa District boundaries which includes all of Oklahoma, and portions of Texas and Kansas.
1.2. GOVERNMENT SECURITY REQUIREMENTS
The offeror(s) must ensure that ALL mail sent to the Tulsa District, U.S. Army Corps of Engineers, either pre-contract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc.
ANY MAIL addressed to the U.S. Army Corps of Engineers, including but not limited to bids, modifications to bids, proposals, revised proposals, bonds, correspondence, etc., will be REJECTED by the U.S. Army Corps of Engineers mail room facility located at 2488 E. 81st Street, Tulsa, OK 74137-4290, if it does not contain a return mailing address. There will be no exceptions.
USACE Tulsa District Point of Contact is Mr Brian Welch:
Phone: 405-869-2617 Email: Brian.Welch@usace.army.mil
1.3. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
Copies of the solicitation and any amendments will be provided electronically. All solicitation documents will be posted thought the Beta Sam Contract Opportunities (formerly FedBizOpps/FBO) website at:
https://www.beta.sam.gov
It shall be the offeror’s responsibility to check the beta.sam.gov website for any amendments. The offeror shall read the solicitation and all amendments in their entirety and submit all requested information specified in this solicitation and all amendments. There will be no public opening of the proposals received as a result of this solicitation.
Any information given to an Offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.
1.4. OFFEROR'S QUESTIONS AND COMMENTS
All contractual matters, questions and or comments relative to these documents should be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=HomePagePublic no later than 7 calendar days prior to the proposal due date, in order that they may be given consideration or actions taken prior to receipt of offers.
The bidder inquiry key for this project is XFZYPT-UGMJGD.
Instructions for registering in the ProjNet Bidder Inquiry system are available on the above website.
1.5. SMALL BUSINESS SIZE STANDARD/NAICS CODE
The NAICS Code selected for this project is 237990, Other Heavy and Civil Engineering Construction, and the size standard is $39,500,000.00. Also see FAR 52.204-8.
1.6. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
This request for proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.
1.7. SITE VISIT
All site visits will be held at the Task Order Level.
1.8. ACCURACY IN PROPOSALS
Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments). The penalty for making false statements is prescribed in 18 U.S.C. 1001.
1.9. PROPOSAL SUBMITTAL
1.9.1. The submittal method for proposals is electronic via DoD SAFE or email ONLY (no mailed proposals).
DoD SAFE web site: https://safe.app.mil/
The following email addresses must be entered for notification of proposal receipt and download availability:
Brian.Welch@usace.army.mil Rudolfo.Morales@usace.army.mil
1.9.2. Proposals will be received until the date and time and specified in this Request for Proposal. Mail all bonds to:
U.S. Army Corps of Engineers, Tulsa District ATTN: CESWT-CT-E (Mr. Welch) 2488 E. 81st Street Tulsa, OK 74137-4290
1.9.3. The packaging shall be marked Solicitation Number: W912BV-20-R-0025.
1.10. PROPOSALS
See Section 00 22 00 for proposal requirements and formats.
Offer Closing Date: 07 July 2020 Offer Closing Time: 2:00 pm Central Standard Time (CST)
1.11. JOINT VENTURE PROPOSAL REQUIREMENTS
When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a) or HubZone joint venture, the Offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively.
1.12. DEVIATIONS AND EXCEPTIONS
Deviations and exceptions to the terms and conditions of the solicitation are neither encouraged nor desired.
Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined “unacceptable” and thus ineligible for the award. Should the offeror have any questions related to specific terms and conditions, these must be resolved prior to submission of the offer.
Notwithstanding the above, if deviations and exceptions are included with the offer, the offeror shall list and describe in detail the deviations and/or exceptions. All deviations and exceptions shall be fully supported with the
Offeror’s rationale and shall fully explain the impact, if any, on the performance and/or specific requirement of the
RFP.
SECTION 00 22 11 - PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA, BASIS OF
AWARD ONE-STEP-BEST VALUE, DESIGN-BUILD (SINGLE AWARD)
1.0 OVERVIEW
2.0 BASIS OF AWARD
3.0 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
4.0 PROPOSAL CONTENTS AND RELATED EVALUATION FACTORS AND SUBFACTORS
5.0 VOLUME 1 – FACTOR 1 – PERFORMANCE CAPABILITY FOR MATOC
1.1. VOLUME 1 – TAB B: SUBFACTOR 1 – SPECIALIZED EXPERIENCE
1.2. VOLUME 1 – TAB C: SUBFACTOR 2 – KEY PERSONNEL
1.3. VOLUME 1 – TAB D: SUBFACTOR 3 – MANAGEMENT APPROACH
6.0 VOLUME 1 – TAB E: FACTOR 2 – PAST PERFORMANCE
7.0 VOLUME 1 – FACTOR 3 – PERFORMANCE CAPABILITY – SEED TASK ORDER
1.4. VOLUME 1 – TAB F: SUBFACTOR 1 – TECHNICAL APPROACH – SEED TASK ORDER
1.5. VOLUME 1 – TAB G: SUBFACTOR 2 – KEY PERSONNEL – SEED TASK ORDER
1.6. VOLUME 1 – TAB H: SUBFACTOR 3 – PROPOSED CONTRACT DURATION / SUMMARY
SCHEDULE
8.0 VOLUME 2 – FACTOR 4 - PRICE PROPOSAL
1.7. GENERAL
9.0 EVALUATION PROCEDURES
1.8. SOURCE SELECTION EVALUATION BOARD (SSEB)
1.9. EVALUATION
1.10. DEFINITIONS
1.11. EVALUATION RATING SYSTEM
1.12. PAST PERFORMANCE EVALUATION SYSTEM
SECTION 00 22 11 ATTACHMENTS
1 – COMPANY SPECIALIZED EXPERIENCE CONSTRUCTION
2 – NAVFAC / USACE PAST PERFORMANCE QUESTIONNAIRE (FORM PPQ-0)
3 – KEY PERSONNEL RESUME
4 – LETTER OF COMMITMENT FOR KEY PERSONNEL
5 – LETTER OF COMMITMENT FOR KEY SUBCONTRACTORS
1.0 OVERVIEW
1.1. A pool of up to five (5) MATOCs will be awarded through FAR Part 15, One-Step Best Value “Trade-Off” Source Selection. When combined all non-cost factors are significantly more important than price. The Government is concerned with achieving the most advantageous balance between technical merit (quality) and price.
The degree of importance of price could become greater depending upon the equality of the technical proposals. If competing technical proposals are determined to be essentially equal, price could become the controlling factor.
1.2. The MATOCs are Indefinite Delivery Indefinite Quantity contracts as defined in FAR 16.504. Services will be provided by Firm-Fixed-Price (FFP) Task Orders (TOs). Only the Tulsa District shall issue Task Orders against this contract unless specifically authorized by a Tulsa District Contracting Officer.
1.3. Each MATOC will be a five (5) year contract (three (3) year base plus two (2) one year options). The Government is under no obligation to issue any Task Orders in excess of the minimum contract obligation of $3,000.00. The shared sum of all Task Orders among the MATOCs (total contract capacity) shall not exceed the estimated amount of $49,500,000.00.
1.4. General Description of Work: This MATOC will support a wide range of design-bid-build (DBB) requirements to include but not necessarily limited to projects for new utilities, relocation of existing utilities, maintenance, repair, and rehabilitation of roads and other paved surfaces, small inhabitable structures, revetment and shoreline protection, small concrete outlet work and control structures, foundation drainage systems, and other ancillary features that support flood control and navigation infrastructure. Disciplines and related work requirements may include, but not limited to: (1) Civil Construction and Related Activities. Construction surveying, grading and earthwork, dredging, surface and subsurface storm drainage and drainage control structures, storm water management, erosion and sediment control, shoreline protection, clearing and grubbing, paving and surfacing for roads, parking areas, and sidewalks, parking layout, pavement markings, traffic control and signage, gates and fencing, curbs and gutters, railroads, dewatering, landscaping, seeding, sprigging, and sodding, riprap and stone protection, retaining walls, buried structures, slope stabilization, foundations, borings, trenching, berms and utility relocation; (2) Structural Construction and Related Activities. Rehabilitation or replacement of concrete structures associated with flood control or navigation infrastructures; and (3) Utilities. Sanitary sewers, lighting, and installation or relocation of other utilities as required for road repair and rebuilding or other site work.
1.5. Location of Work: Projects may be located anywhere within the USACE Tulsa District Boundaries, which for Civil Works includes all of Oklahoma, and portions of Texas and Kansas.
1.6. Upon receipt of a task order, the Contractor shall provide all labor, materials, supplies, parts (to include system components), plant, supervision, equipment, and related services (except when specified as Government furnished), to perform the work as specified. Contractor’s work and responsibility shall include all Contractor planning, programming, administration, and management necessary to provide all work as specified. The Contractor shall conduct all work in strict compliance with the contract and all applicable Federal, State, and local laws, regulations, codes, and directives. The Contractor shall provide related services such as preparing and submitting required reports, performing administrative, and submitting necessary information as specified under this contract and within each task order. The Contractor shall ensure that all work provided meets the requirements of the base contract and the individual task orders scope of work to include any drawings, specifications, or other applicable document issued with the task orders.
2.0 BASIS OF AWARD
2.1. The Contracting Officer intends to award a pool of no less than three (3) but no more than five Indefinite Delivery Indefinite Quantity MATOCs from this FAR Part 15 One-Step Best Value “Trade Off” Source Selection.
When combined all non-cost factors are significantly more important than price. The Government is concerned with achieving the most advantageous balance between technical merit (quality) and price. The degree of importance of price could become greater depending upon the equality of the technical proposals. If competing technical proposals are determined to be essentially equal, price could become the controlling factor.
2.2. The intent of the solicitation is to obtain the best proposal for the work within the solicitation to not only include the specific seed task order, but also for anticipated work identified in paragraph 1.4 “General Description of Work”.
2.3. The Government reserves the right to accept other than the lowest price offer, or to reject all offers.
2.4. The Government will not award a contract to a Firm whose proposal contains a deficiency, as defined in
FAR 15.001.
2.5. After the Source Selection Evaluation Board’s evaluation of the Offeror’s Technical Proposals is complete, a matrix will be prepared listing the following for all Offerors:
a) Overall Rating for Factors 1, 2, and 3, including proposal risk rating
b) Overall Consensus Rating for the Technical Proposal
c) Overall Proposal Risk for the Technical Proposal
2.6. After Price Analysis has been performed on each Offeror’s Price Proposal for the Seed Task Order, the price will be added to the Matrix.
2.7. Award of the MATOCs will be made through comparative analysis of the evaluated ratings for Factors 1, 2, 3, and 4. The Source Selection Authority (SSA) will determine which Offerors best conform to the a firm fixed-price contract to the responsible Offeror whose proposal the Source Selection Authority determines conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, considering all non-price factors described herein, and price. All evaluation factors, other than price, when combined, are considered significantly more important than the price.
2.8. After award of the MATOCs, the Seed Task Order will be awarded to one of the MATOCs through a comparative analysis between the evaluation of Factor 3 and the price proposed in Factor 4 for all of the MATOCs (i.e. trade off). The SSA will determine which MATOC best conforms to the solicitation (Factors 3 and 4), is fair and reasonable, and offers the best overall value to the Government.
2.9. The remaining MATOCs will be awarded the minimum guarantee.
3.0 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
3.1. PARTICIPATION INFORMATION
3.1.1. Firms formally organized as construction contractors that have associated specifically for this project, consortia of firms, or any other interested parties may submit proposals. Associations may be as Joint Ventures (JVs) or “team” arrangements.
3.2. PROPOSAL SUBMISSION REQUIREMENTS:
3.2.1. Each Offeror must submit a Technical Proposal that includes the following:
3.2.1.1. Performance Capability for the MATOC – demonstrating their experience and capability to successfully execute the type of projects described in Paragraph 1.4. The Government will evaluate in accordance with the criteria described herein.
3.2.1.2. Past Performance information required in paragraph 6.1.
3.2.1.3. Performance Capability for the Seed Task Order (described below) – The Government will evaluate the Proposal in accordance with the criteria described herein.
3.2.1.3.1. Seed Task Order Description – Fry Creek – Make required flood damage repairs to Fry Creek channel south of 121 St. Existing riprap identified to be replaced shall be removed and hauled off site. Riprap protection shall be placed and graded in accordance with the drawings and specifications. Chanel repair will extend to approximately ten (10) feet past the emergency access ramp. Riprap shall be placed underneath the cantilevered portion of the ramp for support. Contractor shall not disturb any ground outside the Right of Way (ROW) shown in the project drawings. Ample space for staging and parking is available within the ROW. Any remaining disturbed areas shall be covered with sod.
3.2.2. Each Offeror must submit a Seed Task Order Price Proposal for the Seed Task Order described above. The Government will evaluate the Seed Task Order Price Proposal in accordance with the criteria described herein. Seed Task Order is provided as Attachment 2 of the solicitation.
3.3. GENERAL INSTRUCTIONS:
3.3.1. The Technical Proposal and Seed Task Order Price Proposal must be submitted as separate files. Ensure that each file is clearly marked to indicate its contents; and identify the Offeror.
3.3.2. Both the Price Proposal and the Technical Proposal must be received by the closing date and time set for receipt of proposals.
3.3.3. No dollar amounts or inference to dollar amounts from the Price Proposal are to be included in the Technical Proposal.
3.3.4. All information intended to be evaluated as part of the Technical Proposal must be submitted as part of the Technical Proposal (Volume 1). Do not merely cross-reference similar material in the Price Proposal, or vice versa.
Also, do not include links to websites in lieu of incorporating information into your proposal.
3.3.5. Proposal materials shall be submitted via via DoD SAFE website https://safe.app.mil/, containing the proposal in PDF file format using Adobe Acrobat software. Proposals shall be tabbed and labeled in a manner to afford easy identification from a Table of Contents. Each page shall be identified with the appropriate page number centered at the bottom of the page. Sheet size of the proposal contents shall be 8-1/2 inches x 11 inches where sheets are prepared specifically for this proposal, unless another paper size is specifically authorized elsewhere in this section for a particular submission. Do not use alternative paper sizes (e.g., 11” x 14” or 11” x 17” sheets) unless specifically authorized in this section for a particular submission. Do not use a font size smaller than 10, an unusual font style such as script, or condensed print for any submission. All page margins must be at least 1 inch wide, but may include headers and footers. A page is defined as text or information on one side of the paper. Factor 2 – Past Performance will not be counted towards this page limitation, nor will the resumes submitted for key personnel, nor the letters of commitment for individuals or teaming subcontractors. The Government will not evaluate any information beyond the total page limitation noted above and in the individual Factor limitations noted in the paragraphs below. The Government will not review any information submitted in an appendix or attachment to the proposal. The Offeror shall not submit verbatim sections of this solicitation as part of their proposal. Offers that do not meet these requirements may be subject to rejection.
3.3.6. Provide read-only PDF file format using Adobe Acrobat software containing the technical volume as well as a read-only PDF format using Adobe Acrobat software containing the price volume.
3.3.7. “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can be provided to the Government as part of the Offeror’s technical proposal.
Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must be clearly marked in accordance with the instructions at FAR 52.215-1, “Instructions to Offerors—Competitive Acquisition”, paragraph (e), “Restriction on disclosure and use of data”.
3.3.8. For submissions with page limitations: Where authorized, (11" x 14" or 11" x 17") will count as one page.
Tables of content, proposal cover letters, and tabs between proposal information do not count toward any page limitations in the proposal.
3.3.9. Proposal revisions shall be submitted as page replacements with revised text readily identifiable, e.g., bold face print or underlining. The source of the revision, e.g., Error, Omission, or Clarification, or amendment shall be included and be annotated for each revision. Proposal replacement pages shall be numbered, shall be clearly marked “REVISED”, and shall show the date of revision,. A revised copy of the entire proposal in .pdf format shall be provided via DoD SAFE website https://safe.app.mil/.
3.3.10. TAB A – Deviations, Exceptions, and Assumptions
3.3.10.1. Deviations and exceptions to the terms and conditions of the solicitation in either the technical or price proposal are neither encouraged nor desired. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined “unacceptable” and, thus, ineligible for award. Should the Offeror have any questions related to specific terms and conditions, these must be resolved prior to submission of the offer. Notwithstanding the above, if deviations and exceptions are included with the offer, the Offeror shall list and describe in detail the deviations and/or exceptions under Tab A. All deviations and exceptions shall be fully supported with the Offeror’s rationale and shall fully explain the impact, if any, on the performance and/or specific requirement of the RFP. Deviations from the minimum standard of quality required by the RFP shall not be accepted unless identified by the offeror’s proposal in TAB A, and specifically approved by the Contracting Officer in writing. If unapproved, the Contractor must provide the RFP requirements without additional cost to the Government. If approved, the accepted deviation will take precedence as a provision of the solicitation. The Offeror shall also clearly describe on the Tab B submitted with the Price Proposal any exception to the contractual and/or technical terms and include the monetary impact on the solicitation with the price proposal. This information will not be evaluated separately but may impact the evaluation of other factors.
3.3.11. Additional corporate information not specifically requested herein is not desired, and will not be considered in the evaluation of the Offeror’s proposal.
3.4. DISCUSSIONS
3.4.1. The Government does not intend to enter into discussions with offerors prior to making an award. Offerors are encouraged to present their best technical proposal and prices in their initial proposal submission. However, in accordance with FAR Part 15.306, should discussions become necessary, the Government reserves the right to hold them. If this occurs, a competitive range will be determined and offerors notified. The competitive range may be limited for purposes of efficiency in accordance with (IAW) FAR Part 15.306(c)(2).
3.5. SPECIFIC INSTRUCTIONS FOR THE TECHNICAL PROPOSAL (VOLUME 1)
3.5.1. Technical Proposal. Proposals shall contain the entire proposal in .pdf format using Adobe Acrobat software to print to a .pdf file; do NOT scan the document(s) into a .pdf file. The text portion of the complete proposal shall be contained as a single searchable .pdf file. Sections of the proposal shall be bookmarked (linked to the index) in logical order.
3.5.2. Format and Contents of the Technical Proposal and List of Tabs. The technical proposal will be appropriately organized using the tabs specified in the chart below. The proposals shall contain a detailed table of contents. A cover sheet identifying the Offeror (name, address, point of contact), project description and solicitation number shall be provided. The second sheet shall be a Table of Contents. Offerors that violate these rules unnecessarily delay the evaluation process and may be rejected by the Government after the initial evaluation without receiving any further consideration. The Government will not evaluate any information beyond the page limitation noted.
3.5.3. Page Limitations. The following page limitations are established for each Factor / Subfactor:
3.6. SPECIFIC INSTRUCTIONS FOR THE PRICE PROPOSAL (VOLUME 2)
3.6.1. Price Proposal. Submit the Price Proposal in read only .pdf files.
3.6.2. Size Restrictions and Page Limits. Proposal materials shall be submitted in .pdf format. Do not use font size smaller than 10 point, an unusual font style such as script, or condensed print for any submission. Each page shall be identified with the appropriate page number centered at the bottom of the page. Sheet size of the proposal contents shall be 8-1/2 inches by 11 inches. The summary schedule may be submitted on 11 inches by 17 inches.
There ere are no page limits for the Price Proposal. However, limit your response to information required by this solicitation. Excess information will not be considered in the Government’s evaluation.
3.6.3. Format and Contents of the Price Proposal and List of Tabs. The Price Proposal shall be tabbed and labeled in a manner to afford easy identification from a Table of Contents, as indicated in the following chart. Note:
If the Offeror is not required to submit any information under a listed Tab (such as a JV Agreement) in accordance with the instructions below, that tab can be omitted. However, do not renumber the subsequent tabs.
FACTOR 1
Subfactor 1 Specialized Experience Specialized Experience Forms 16 pages (2 per project, maximum of 8 projects)
Supplemental Narrative 2 pages
Letters of Commitment for Key Subcontractors
1 page per subcontractor, no limit.
Subfactor 2 Key Personnel Resume 2 pages per resume
Subfactor 3 Management Approach Narrative 8 pages
FACTOR 2 No page limits
FACTOR 3
Subfactor 1 Technical Approach - Seed Task Order Narrative 5 pages
Subfactor 2 Key Personnel - Seed Task Order Resume 2 pages per resume
Subfactor 3 Proposed Contract Duration / Summary Schedule Narrative 2 pages
Chart No page limit
PAST PERFORMANCE
PERFORMANCE CAPABILITY - SEED TASK ORDER
PERFORMANCE CAPABILTIY FOR MATOC
4.0 PROPOSAL CONTENTS AND RELATED EVALUATION FACTORS AND SUBFACTORS
VOLUME 1 - TECHNICAL PROPOSAL
FACTOR /
SUBFACTOR LOATION DESCRIPTION RELATIVE IMPORTANCE
N/A VOL 1 TAB A
Deviations, Exceptions, and Assumptions
Not rated, but may impact the evaluation of factors
FACTOR 1
PERFORMANCE
CAPABILITY FOR
MATOC
MOST IMPORTANT FACTOR
Subfactor 1 VOL 1 TAB B Specialized Experience Most important Subfactor
Subfactor 2 VOL 1 TAB C Key Personnel 2nd Most Important Subfactor
Subfactor 3 VOL 1 TAB D Management Approach 3rd Most Important Subfactor
FACTOR 2 VOL 1 TAB E PAST PERFORMANCE
MOST IMPORTANT FACTOR
(EQUALLY IMPORTANT TO
FACTOR 1)
FACTOR 3
PERFORMANCE
CAPABILITY FOR SEED
TASK ORDER
2ND MOST IMPORTANT
FACTOR (LESS IMPORTANT
THAN FACTORS 1 AND 2)
Subfactor 1 VOL 1 TAB F Technical Approach - Seed Task Order
Most Important Subfactor
Subfactor 2 VOL 1 TAB G Key Personnel - Seed Task Order
2nd Most Important Subfactor
Subfactor 3 VOL 1 TAB H Proposed Contract Duration and Summary Schedule - Seed Task Order
3rd Most Important Subfactor
VOLUME 2 - PRICE PROPOSAL
FACTOR /
SUBFACTOR LOATION DESCRIPTION RELATIVE IMPORTANCE
N/A
VOL 2 TAB
A Proposal Cover Sheet Not Rated
N/A
VOL 2 TAB
B
Signed Letter Responding to RFP, SF 1442, and Acknowledgement of Amendments Not Rated
FACTOR 4
VOL 2 TAB
C
SECTION 00 11 00
PRICING SCHEDULE
4th Most important factor (less important than Factors 1, 2, and 3 combined
N/A
VOL 2 TAB
D Bid Guarantee (Bid Bond) Not Rated
N/A
VOL 2 TAB
E
Representations & Certifications Not Rated
N/A
VOL 2 TAB
F
JV Agreement (if applicable) Not Rated
5.0 VOLUME 1 – FACTOR 1 – PERFORMANCE CAPABILITY FOR MATOC
5.1. VOLUME 1 – TAB B: SUBFACTOR 1 – SPECIALIED EXPERIENCE
5.1.1. Submission Requirements:
5.1.1.1. The Offeror shall demonstrate recent, relevant experience on similar projects using the Company – Specialized Experience Form – Attachment 1 at the end of this section. Offerors may identify state and local government as well as private contracts that are similar to the Government’s requirements as outlined in paragraph
1.4 of this section. If the Offeror is a joint venture or teaming arrangement, each firm shall provide information, demonstrating experience relevant to their role on this project. Offeror shall provide a copy of the joint venture agreement or letters of commitment from all teaming contractors and / or subcontractors (agreements and letters of commitment will not count towards the page limitation). Contractors other than the prime to include key subcontractor’s experience will not be considered without the required agreements or letters of commitment.
Offeror shall submit projects that are currently underway and at least 50% complete or completed and turned over no longer than five (5) years preceding the date of this solicitation. If any firm has multiple functions or division, limit the project examples to those performed by the division or unit submitting the offer or by the team member.
5.1.1.2. Prime contractor must submit at least one relevant project involving civil works construction as described in the General Description of Work for this MATOC (paragraph 1.4), with a value of $3,000,000.00 or greater; the remainder of the projects submitted to demonstrate the experience of the prime shall be at least $500,000.00 in value. The prime contractor must submit a minimum of three (3) projects.
5.1.1.3. The Offeror may at their discretion submit up to eight (8) total projects (inclusive of the 3 mandatory projects identified in paragraph 5.1.1.2) either completed by the prime contractor or key team members / subcontractors. Key team members and subcontractors shall also utilize the Company – Specialized Experience Form – Attachment 1 at the end of this section. Letters of Commitment from key team members / subcontractors must be provided for their specialized experience to be considered in the evaluation for this subfactor.
5.1.1.4. The Offeror may provide supplemental narrative (not project lists), not to exceed two (2) pages, explaining how any corporate experience that is not directly related to specific projects above is applicable to this MATOC, and how the Government will benefit.
5.1.1.5. The Offeror should include in the supplemental narrative any previous experience between current team members, if not described in the submitted Company – Specialized Experience Forms. The above information is limited to projects that are well underway or that have been completed and turned over no longer than the past five
(5) years preceding the date of this solicitation.
5.1.2. Evaluation Criteria:
5.1.2.1. The Government will evaluate the extent of recent experience of the prime contractor as relevant to their role on this project. Experience on the similar projects identified in the project lists will receive more consideration than experience provided in the supplemental narrative. The Government will place greater importance on projects performed as a prime contractor than as a subcontractor, depending upon overall role and relevancy considerations.
5.1.2.2. The Government will evaluate the extent of recent experience of the proposed key team members as relevant to their role on this project. Experience on the similar projects identified in the project lists will receive more consideration than experience provided in the supplemental narrative.
To determine strengths and weaknesses, the agency will give more consideration to the following:
a. Projects constructed for the Corps of Engineers.
b. Projects with a value of $3 million or greater.
c. Fully completed projects rather than substantially complete projects.
e. Projects completed after 2017.
f. Projects that demonstrate experience of the team members commensurate with their proposed role on this project.
5.1.2.3. The Offeror shall submit the requested information to demonstrate a record of recent, related experience, for the project types (which may include similar state or local government or private counterparts) included in this contract, as described in this section. Recent experience includes projects well underway (see above criteria) or those completed and turned over within five (5) years of the proposal issue date for this RFP. Joint Venture partners or teaming partners should each demonstrate experience commensurate with their role on this project or explain in the supplemental narrative how their experience qualifies them for their role on this project. If any of the information required is not included in the forms (Attachment 1), then the Contractor will be considered non-responsive and evaluated as unacceptable.
5.1.2.4. The Government reserves the right to verify the experience record of cited projects or other recent projects by reviewing Past Performance Information Retrieval System (PPIRS), Construction Contractor Appraisal Support System (CCASS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), other databases; or interviews with Program Managers, Contracting Officers, and Fee Determining Officials; and the Defense Contract Management Agency or to interview owners or references.
The Government may check any or all cited references to verify supplied information.
5.1.2.5. To receive credit for extent (amount) of experience, the Offeror shall demonstrate a history of recent, relevant experience. A firm will not receive credit under this subfactor for the relevant experience of key personnel proposed for this project. If Offeror represents the combining of two or more companies for the purpose of this RFP, the proposal shall clearly identify the contractual responsibilities of each firm and the work to be performed by each; describe the nature of the association; indicate whether the firms have experience working together in construction ventures, including how long and how many projects. In addition, each company, including joint ventures, shall list their Government contract experience. Provide a copy of the commitment letter of the firms (see Attachment 5) or the Joint Venture Agreement.
5.1.2.6. The Government will consider extent of recent experience, degree of relationship of such experience to this project, demonstrated familiarity with applicable codes and local conditions. Some examples of relevancy to this project may include, but not be limited to:
1) Number, size, type work, complexity, location
2) Dates (well under way or completed no more than five (5) years preceding date of Solicitation)
3) Firm's role and extent of work self-performed (brokering out all work and simply “placing the sidewalks” on a cited project are examples of less relevant experience)
5.1.2.7. The Government will consider the breadth of experience of the Offeror. Offerors that are able to demonstrate specialized experience in multiple project types referenced in paragraph 1.4 above will receive more consideration than offerors that only demonstrate experience in one of the referenced project types.
5.1.2.8. The Government may consider previous recent teaming experience among the team members, JV partners or key teaming subcontractors, as value added, even if on different construction projects than this project. The more relevant the experience, the more credit will be given.
5.1.2.9. If because of reasons beyond the control of the Offeror, the proposed team members to include subcontractors named in this proposal are not able to participate as identified, replacement team members or subcontractors for this project shall be required to have qualifications and experience meeting or exceeding those identified in the proposal. Replacements shall be presented for acceptance and approval by the Contracting Officer.
5.2. VOLUME 1 – TAB C: SUBFACTOR 2 – KEY PERSONNEL
5.2.1. Submission Requirements:
5.2.1.1. Offeror shall provide resumes for key personnel involved in the overall management of the Civil Works MATOC; including team members, which demonstrate the qualifications necessary for this project, which includes proposed role, relevant education and training; and previous relevant experience in similar type work, to manage, control and perform construction. Resumes shall include detailed experience in proposed role, relevant education & training, total relevant experience. Clearly indicate whether each individual has had a significant role in any of the cited project examples from Sub-Factor 1. If re-assignment of personnel is considered possible, provide alternate professionals in each assignment. For each person provide a brief resume, using the Key Personnel Resume forms (Attachment 3) at the end of this section, minimum years of experience must be verifiable, with example projects from the present back the minimum number of years, to include dates of work performed. Limit each resume to not more than two (2) pages. Key personnel shall at a minimum include the Program and / or Project Manager responsible for management of the Civil Works MATOC. Additional key personnel specific to the individual seed task order will be required under Factor 3. Provide unequivocal letters of commitment from all proposed key personnel not currently employed by the prime contractor. Use the form letter (Attachment 4) at the end of this section.
5.2.2. Evaluation Criteria:
5.2.2.1. The Government will evaluate the required information to determine how well the Offeror identifies and demonstrates that the proposed key personnel meet or exceed the minimum qualifications necessary to perform any work awarded through task orders on this MATOC.
5.2.2.2. The Government will give additional consideration to key personnel that have demonstrated experience on projects same / similar to those contemplated with the General Description of Work in paragraph 1.4 of this section.
5.2.2.3. Minimum Qualifications of Key Personnel Include:
a. Program / Project Manager – Bachelor’s degree and 5 years construction experience
5.2.2.4. To determine strengths and weaknesses, the Government will take the following into consideration with respect to key personnel. This list is not necessarily all-inclusive:
a. Proposed Key Personnel who exceed the qualifications described above.
b. Key Personnel that worked on projects used to demonstrate specialized experience under Subfactor 1.
c. Key Personnel that demonstrate experience in the same role proposed for this MATOC on projects same / similar to those described in the Description of Work in paragraph 1.4 of this section.
5.2.2.5. If alternates are proposed for key positions, the evaluation rating will consider the lesser qualified or experience individual, if there is a difference.
5.2.2.6. If because of reasons beyond the control of the Offeror, the key personnel named in this proposal are not able to participate as identified, replacement personnel for this MATOC shall be required to have qualifications and experience meeting or exceeding those identified in the proposal. Proposed substitutions of key personnel shall be presented for acceptance and approval by the Contracting Officer.
5.3. VOLUME 1 – TAB D: SUBFACTOR 3 – MANAGEMENT APPROACH
5.3.1. Submission Requirements
5.3.1.1. The offeror shall in narrative format describe its quality control approach and capabilities to maintain quality control of the awarded task orders. Describe the proposed quality control organization to include the organizational structure, authorities, responsibilities, etc… There is no need to submit a detailed quality control plan at this stage.
5.3.1.2. The offeror shall in narrative format describe its plan and capabilities to respond to the Government’s Request for Proposal for a task order.
5.3.1.3. The offeror shall in narrative format describe its plan for managing subcontractor performance.
5.3.1.4. The offeror shall in narrative format describe its plan for managing the construction schedule, and regaining lost time when schedule delays occur.
5.3.1.5. The offeror shall in narrative format describe the type of work and the extent that it intends to self-perform on this MATOC, as well as the available resources for self-performance.
5.3.1.6. The Offeror shall in narrative format describe its available resources and capabilities to support this MATOC concurrently with other projected on-going and new work, to include execution of multiple, simultaneous task orders on this MATOC.
5.3.1.7. Offeror shall provide a brief summary stating why it is especially qualified to undertake these MATOCs.
5.3.2. Evaluation Criteria
5.3.2.1. The Government will evaluate the strengths, weaknesses, and any deficiencies in the Offeror’s response to the above submission requirements.
5.3.2.2. The Government will evaluate the Offeror’s understanding of the requirement for the MATOCs and its capability to execute the projects.
5.3.2.3. The Government will evaluate the Offeror’s overall plan to control the construction schedule to include their ability to manage the schedule, identify risks, and properly mitigate those risks to minimize delays. The Government will also evaluate the Offeror’s plan to regain lost time when delays occur.
5.3.2.4. The Government will evaluate the clarity and strength of the overall organization and how well it is organized, structured, and staffed to execute this MATOC.
5.3.2.5. If Offeror is a Joint-Venture, the Government will evaluate if the Joint-Venture members’ contribution to the organization is commensurate with their skills and background.
6.0 VOLUME 1 – TAB E: FACTOR 2 – PAST PERFORMANCE
6.1. Submission Requirements:
6.1.1. General Submission Requirements
6.1.1.1. There is no page limit for this factor. For each of the projects submitted under Factor 1, to ensure the agency has all relevant past performance information, the offeror shall submit copies of Federal/DoD/Navy/Army performance reviews that are likely already in the agency’s databases or likely within the agency’s arm’s reach, i.e.
Contractor’s copy of CCASS or CPARS evaluations.
6.1.1.2. For each project under Factor 1 that does not have a CPARS evaluation, offerors shall provide a Past Performance Questionnaire form PPQ-0 (Attachment 2) to a representative of the owner that can provide the owner’ s opinion of the offeror’ s past performance for the project. The Past Performance Questionnaire (Form PPQ-0) included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 1. Ensure correct phone numbers and email addresses are provided for the client point of contact. Offerors should organize all Past Performance Information based on the Factor 1 Projects, which normally have project titles and are numbered 1-8, so that reviewers can match the owner’ s opinion with the corresponding Subfactor 1 Project. If a PPQ currently exists, it must have been completed within the last year.
6.1.1.3. Form PPQ-0 at Attachment 2 shall be utilized and offerors shall submit the PPQ with their proposal submission to the Contracting Office designated proposal submission location. The contract specialist or Contracting Officer will not require the PPQ to be sent directly from the client. The offeror may submit the completed PPQ-0.
Completed Past Performance Questionnaires should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires.
If the client requests, questionnaires may be submitted directly to the Government’ s point of contact, Rudolpho Morales via email Rudolfo.Morales@usace.army.mil prior to proposal closing date. If you have questions regarding the attached questionnaire, or require assistance, please contact the Contract Specialist at (405) 869-2617.
6.1.1.4. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the offeror.
6.1.1.5. The offeror is responsible for ensuring that the completed questionnaires are submitted by the closing date.
6.1.1.6. The Government will evaluate the responses from the customers from which Past Performance Questionnaires have been received. The Government may contact and interview points of contact on the Past Performance Questionnaires. The Government reserves the right to interview other individuals acting for the listed references, if the listed reference is not available. In addition to the above, the Government may review any other sources of information for evaluating past performance.
6.1.1.7. Past performance information may be obtained from any other sources available to the Government, to include, but not limited to, the Past Performance Information Retrieval System (PPIRS), Construction Contractor Appraisal Support System (CCASS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; interviews with Program Managers, Contracting Officers, and Fee Determining Officials; and the Defense Contract Management Agency.
6.1.1.8. To improve accuracy of database searches, the offeror will also provide the CAGE Codes for the prime contractor and all teaming partners, i.e. key subcontractors, Joint Venture Partners, whose experience is being relied on in Factor 1.
6.1.1.9. The Government may contact references provided as part of Factor 1 – Experience, for information regarding the Offeror’s past performance on the project and for the purposes of assessing and verifying the scope of the work performed. Offerors should provide accurate, current, and complete contact information for references provided in the project descriptions.
6.1.1.10. No additional past performance information shall be submitted under this Factor. Offers that violate this rule unnecessarily delay the evaluation process and will be evaluated as unacceptable and may result in the contractor being removed from further consideration.
6.1.2. Joint Venture Submission Requirements:
6.1.3. Offerors…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .