The U.S. Army Corps of Engineers Engineering District Tulsa seeks to award multiple indefinite-delivery indefinite-quantity contracts for civil engineering, construction, and related services in support of its Civil Works projects. Work requirements may include grading, paving, utilities, drainage, dredging, fencing and more. Proposals will be evaluated using a best value tradeoff process. The anticipated solicitation date is May 29th, 2020 with a proposal deadline of June 26th, 2020.

This is a total small business set-aside. The total contract capacity across all awardees shall not exceed $49.5 million over five years (three year base plus two option years). Each contract will have a minimum $2,000 obligation. Fifteen percent of the cost must be self-performed for general construction by small businesses. Up to five MATOC contracts may be awarded under various NAICS and PSC codes to support horizontal construction projects.

Notice text

The U.S. Army Corps of Engineers – Tulsa has been tasked to solicit for and award a Multiple Award Task Order Contract (MATOC) for Civil Works (Horizontal Construction) Projects. The proposed project will be a competitive, firm-fixed price, indefinite-delivery indefinite-quantity contract procured in accordance with FAR 15, Negotiated Procurement using the Trade-off Process.

1.1   SCOPE OF WORK

The scope of this acquisition includes a wide range of Design-Build (DB) or

Design-Bid-Build (DBB) civil engineering, structural engineering, new utilities and relocation of existing utilities, and heavy construction activities. The MATOC contracts are intended for maintenance, repair, and rehabilitation of roads and other paved surfaces, small inhabitable structures, revetment and shoreline protection, small concrete outlet works and control structures, foundation drainage systems, and other ancillary features that support flood control and navigation infrastructures.

Disciplines and related work requirements may include, but are not limited to:

(1) Civil Engineering, Construction, and Related Activities – Construction surveying, grading and earthwork, dredging, toe drains, surface and subsurface storm drainage and control structures, storm water management, erosion and sediment control, shoreline protection, clearing and grubbing, paving and surfacing for roads, parking areas, and sidewalks, parking layout, pavement markings, traffic control and signage, gates and fencing, curbs and gutters, railroads, dewatering, landscaping, seeding, sprigging, and sodding, riprap and stone protection, retaining walls, buried structures, slope stabilization, foundations, borings, trenching, berms and utility relocation;

(2) Structural Engineering, Construction, and Related Activities - Rehabilitation or replacement of concrete structures associated with flood control or navigation infrastructures; and

(3) Utilities - Sanitary sewers, lighting, and installation or relocation of other utilities as required for road repair and rebuilding or other site work.

This requirement will be for a pool of up to five (5) MATOCs for a five (5) year contract (three (3) year base plus two (2) option years).  The Government is under no obligation to issue any Task Orders in excess of the minimum contract obligation of $2,000.00.  The shared sum of all Task Orders among the MATOCs (total contract capacity) shall not exceed the estimated amount of $49,500,000.00.

The contracts are not only intended to execute new construction, but may require a timely response for remediation, repairs, or alteration to existing assets as described above.

Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting, that they must perform at least 15% of the cost of the contract, not including the cost of materials, with their own employees for general construction-type procurement.

Anticipated solicitation issuance date is on or about 29 May 2020, and the estimated proposal due date will be on or about 26 June 2020.

Notice history

Notice Type Posted
Civil Works (Horizontal) MATOC - Tulsa District Award Latest Award Notice
Civil Works (Horizontal) MATOC - Tulsa District Award Award Notice
Civil Works (Horizontal) MATOC - Tulsa District Award Award Notice
Civil Works (Horizontal) MATOC - Tulsa District Amendment 0004 Latest solicitation Solicitation
This notice Pre-Solicitation
Civil Works (Horizontal) MATOC - Tulsa District Original Pre-Solicitation

6 of 8 notices listed here. See the rest on GovTribe.

Similar open opportunities

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors