Chief Joseph Dam ISO-Phase Powerbus (1-16)

Cancelled Solicitation Posted

Solicitation number
W912DW24R0021
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation is for the replacement and refurbishment of the isolated phase bus for generating units 1 through 16 at the Chief Joseph Dam, issued by the U.S. Army Corps of Engineers Seattle District. The scope of work includes replacing sections of the 7,000 ampere bus for units 1 through 4 and the 4,000 ampere outdoor sections for units 1 through 16, as well as refurbishing the remaining isolated phase bus sections not replaced. The contractor will also be required to provide field engineering services and submit as-constructed drawings. Proposals are due by 2:00 PM Pacific Time on March 28, 2024, and the work must be completed within 1,100 calendar days of the notice to proceed, with careful coordination with dam operations.

There is no set-aside designation for this procurement. The total value of the contract is not provided, but the work is to be performed at the Chief Joseph Dam in Bridgeport, Washington. Amendment R0002 has been issued, revising the bid schedule, updating the Davis-Bacon wage determination, and extending the proposal submission deadline.

Notice text

3 versions

Update #3 · Latest ·

Chief Joseph Dam ISO-Phase Powerbus Units 1-16. Please refer to the attached solicitation document, specifications, and drawings for all details.

Amendments 0001 and 0002 have been issued and uploaded to PIEE and SAM.gov.

Update #2 ·

Chief Joseph Dam ISO-Phase Powerbus Units 1-16. Please refer to the attached solicitation document, specifications, and drawings for all details.

Update #1 ·

Chief Joseph Dam ISO-Phase Powerbus Units 1-16. Please refer to the attached solicitation document, specifications, and drawings for all details.

Amendment R0001 has been posted to both PIEE and SAM.gov.

Files

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Chief Joseph Dam Isophase Powerbus Units 1-16 Pre-Solicitation
Chief Joseph Dam Powerbus Units 1-16 Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
John day DAM unit 10 packing box replacement John Day Dam, Sherman County, Oregonthe John Day Dam On The Columbia River Between Sherman County, Oregon, And Klickitat County, Washington. Rufus, Oregon 97050, United States · NAICS 237990 ENDIST Portland No set-aside
TDA Isolated Phase Bus and Duct Inspection The Dalles Dam in The Dalles, Oregon. Access to The Dalles Dam is from I-84 Exit 88 97058 · NAICS 541380 ENDIST Portland No set-aside
John day DAM navigation lock tainter valve (TV) repairs TV3 and TV4 Location and Access Details. Oregon Side Physical Access, Near Rufus, OR 97050 accessible via I-84, Exit 109. Washington Side (Closest Town), Goldendale, WA 98620 approximately 20 miles north across the river. River Location, Mile 216.6 on the Columbia River, joining Sherman County, Oregon, and Klickitat County, Washington. 98628 · NAICS 237990 ENDIST Portland No set-aside
Albeni Falls Dam Breakroom Upgrade Albeni Falls Dam Powerhouse 2376 E. Highway 2, Oldtown, ID 83822 83822 · NAICS 237990 ENDIST Seattle No set-aside
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement Cascade Locks, Oregon 97014, United States · NAICS 237310 ENDIST Portland Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity