W912DW24R0021R0002 CJD Units 1-16 Isolated Phase Bus.pdf

PDF 1 MB Posted

Attached to
Chief Joseph Dam ISO-Phase Powerbus (1-16)
Solicitation number
W912DW24R0021
Issued by

About this file

This document is Amendment R0002 to Solicitation W912DW24R0021 for the Chief Joseph Dam ISO-Phase Powerbus Units 1-16 project. The amendment revises the bid schedule, updates the Davis-Bacon wage determination, and extends the proposal submission deadline to March 28, 2024 at 2:00 PM Pacific Time. Key changes include removal of unit price and amount columns from several line items, addition of subCLIN details, and updates to the wage determination. The solicitation is for the removal of existing 7,000 amp and 4,000 amp isolated phase bus sections and furnishing and installing new 8,000 amp and 4,500 amp sections, as well as refurbishing remaining sections, for all 16 units at the Chief Joseph Dam. The work is to be performed at the Chief Joseph Dam in Bridgeport, Washington.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to issue a revised bid schedule, an updated w age determination, and an updated proposal submission deadline. See the Summary of Changes for details.

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Mar-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DW24R0021

X 9B. DATED (SEE ITEM 11)

25-Jan-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or

(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED

AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Mar-2024

CODE

USA ENGINEER DISTRICT, SEATTLE

ATTN: CENWS-CT

4735 EAST MARGINAL WAY SOUTH, BLDG. 1202

SEATTLE WA 98134-2388

W912DW 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912DW24R0021

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

R0002

Summary of changes in Amendment R0002

1. 00 41 00 BID SCHEDULE

Changes: Removed “Unit Price” and “Amount” and added subCLIN information text to entries on CLIN 0003, CLIN 0004, CLIN 0005, CLIN 0006, CLIN 0007, CLIN 0008, CLIN 0009, CLIN 0010, CLIN 0011 and CLIN 0012. Revised text is underlined in Amendment document.

2. Revised Davis Bacon Wage Determination - WA20240068 dated 03/08/2024

3. Proposal submittal time and date are revised to 28 March 2024 2:00 p.m. Pacific Time.

4. NOTICE TO OFFERORS: Offerors must acknowledge receipt of this amendment by number and date on offer.

SUMMARY OF CHANGES

(End of Summary of Changes)

CJD Units 1-16 Isolated Phase Bus Chief Joseph Dam, Bridgeport, WA

22016

DOCUMENT 00 41 00 Page 2

SECTION 00 41 00

BID SCHEDULE

Chief Joseph Isolated Phase Bus Units 1-16

Item Description Estimated Quantity

Unit Unit Price Amount

BASE ITEMS:

0001 Mobilization 1 JOB xxxxx $

0002 Demobilization 1 JOB xxxxx $

0003 Remove Existing 7000 amps 4 EA xxxxx $ ections of the Iso-phase

Bus for Units 1-4

This CLIN includes subCLINs 000301, 000302, 000303, and 000304, which may be funded at any time after award for the contractor to proceed with work as detailed in the individual subCLIN descriptions.

TOTAL CLIN 0003 PRICE (All SubCLINs under CLIN 0003)

000301 Remove Existing 7000 amp 1 EA xxxxx $

Sections of Iso-phase Bus for Unit 1

000302 Remove Existing 7000 amp 1 EA xxxxx $ for Unit 2

000303 Remove Existing 7000 amp 1 EA xxxxx $ for Unit 3

000304 Remove Existing 7000 amp 1 EA xxxxx $ for Unit 4

0004 Furnish and Install New

4 EA xxxxx $ 8000 amps Sections of

Iso-Phase Bus for Units 1-4

22016

DOCUMENT 00 41 00 Page 3

000401

This CLIN includes subCLINs 000401, 000402, 000403, and 000404, which may be funded at any time after award for the contractor to proceed with work as detailed in the individual subCLIN descriptions.

TOTAL CLIN 0004 PRICE (All SubCLINs under CLIN 0004)

Furnish and Install New

EA

xxxxx $

8000 amp Sections of Iso-Phase Bus for Unit 1

000402 Furnish and Install New 1 EA Xxxxx $

Iso-Phase Bus for Unit 2

000403

000404

Furnish and Install New Sections of Iso-phase Bus 8000 amp Sections of Iso-Phase Bus for Unit 3

Furnish and Install New Sections of Iso-phase Bus

Iso-Phase Bus for Unit 4

Remove Existing 4000 amps Outdoor Sections and Furnish and Install New 4500 amp Outdoor Sections of the Iso-phase Bus for Units 1-4

This CLIN includes subCLINs 000501, 000502, 000503, and 000504, which may be funded at any time after award for the contractor to proceed with work as detailed in the individual subCLIN descriptions.

TOTAL CLIN 0005 PRICE (All SubCLINs under CLIN 0005)

22016

DOCUMENT 00 41 00 Page 4

000501 Remove Existing 4000 amp 1 EA xxxxx $

Outdoor Sections and Furnish and Install New 4500 amp Outdoor Section of the Iso-phase Bus for Unit 1

000502 Remove Existing 4000 amp 1 EA xxxxx $ Outdoor Sections and Furnish and Install New 4500 amp Outdoor Section of the Iso-phase Bus for Unit 2

000503 Remove Existing 4000 amp 1 EA xxxxx $ Outdoor Sections and Furnish and Install New 4500 amp Outdoor Section of the Iso-phase Bus for Unit 3

000504 Remove Existing 4000 amp 1 EA xxxxx $ Outdoor Sections and Furnish and Install New 4500 amp Outdoor Section of the Iso-phase Bus for Unit 4

0006 Remove Existing 4000 amps 4 EA xxxxx $ Outdoor Sections and Furnish and Install New 4500 amp Outdoor Sections of the Iso-phase Bus for Units 5-8

This CLIN includes subCLINs 000601, 000602, 000603, and 000604, which may be funded at any time after award for the contractor to proceed with work as detailed in the individual subCLIN descriptions.

TOTAL CLIN 0006 PRICE (All SubCLINs under CLIN 0006)

000601 Remove Existing 4000 amp 1 EA xxxxx $ Outdoor Sections and Furnish and Install New 4500 amp Outdoor Section of the Iso-phase Bus for Unit 5

000602 Remove Existing 4000 amp 1 EA xxxxx $ Outdoor Sections and Furnish and Install New 4500 amp Outdoor Section of the Iso-phase Bus for Unit 6

000603 Remove Existing 4000 amp 1 EA xxxxx $ Outdoor Sections and Furnish and Install New 4500 amp

22016

DOCUMENT 00 41 00 Page 5

Outdoor Section of the Iso-phase Bus for Unit 7

000604 Remove Existing 4000 amp Outdoor Sections and Furnish and Install New 4500 amp Outdoor Section of the Iso-phase Bus for Unit 8

1 EA xxxxx $______

0007 Remove Existing 4000 amps Outdoor Sections and Furnish and Install New 4500 amp Outdoor Sections of the

Iso-phase Bus for Units 9-12

This CLIN includes subCLINs 000701, 000702, 000703, and 000704, which may be funded at any time after award for the contractor to proceed with work as detailed in the individual subCLIN descriptions.

TOTAL CLIN 0007 PRICE (All SubCLINs under CLIN 0007)

000701 Remove Existing 4000 amp 1 EA xxxxx $ and Install New 4500 amp Outdoor Section of the Iso-phase Bus for Unit 9

000702 Remove Existing 4000 amp 1 EA xxxxx $ Outdoor Sections and Furnish and Install New 4500 amp Outdoor Section of the Iso-phase Bus for Unit 10

000703 Remove Existing 4000 amp 1 EA xxxxx $ Outdoor Sections and Furnish and Install New 4500 amp Outdoor Section of the Iso-phase Bus for Unit 11

000704 Remove Existing 4000 amp 1 EA xxxxx $ Outdoor Sections and Furnish and Install New 4500 amp Outdoor Section of the Iso-phase Bus for Unit 12

0008 Remove Existing 4000 amps and Install New 4500 amp Outdoor Sections of the Iso-phase Bus for Units 13-16

22016

W912DW24R0021

DOCUMENT 00 41 00 Page 6

000801

This CLIN includes subCLINs 000801, 000802, 000803, and 000804, which may be funded at any time after award for the contractor to proceed with work as detailed in the individual subCLIN descriptions.

TOTAL CLIN 0008 PRICE (All SubCLINs under CLIN 0008)

Remove Existing 4000 amp Outdoor Sections and Furnish and Install New 4500 amp Outdoor Section of the Iso-phase Bus for Unit 13

1 EA xxxxx $

000802 Remove Existing 4000 amp Outdoor Sections and Furnish and Install New 4500 amp Outdoor Section of the Iso-phase Bus for Unit 14

1 EA xxxxx $

000803 Remove Existing 4000 amp Outdoor Sections and Furnish and Install New 4500 amp Outdoor Section of the Iso-phase Bus for Unit 15

1 EA xxxxx $

22016

W912DW24R0021

DOCUMENT 00 41 00 Page 7

000804 Remove Existing 4000 amp Outdoor Sections and Furnish and Install New 4500 amp Outdoor Section of the Iso-phase Bus for Unit 16

1 EA xxxxx $

0009 Refurbish the Remaining Sections of Iso-phase Bus

4 EA xxxxx $ for Units 1-4

This CLIN includes subCLINs 0009001, 000902, 000903, and 000904, which may be funded at any time after award for the contractor to proceed with work as detailed in the individual subCLIN descriptions.

TOTAL CLIN 0009 PRICE (All SubCLINs under CLIN 0009)

000901 Refurbish the Remaining 1 EA xxxxx $ Sections of Iso-phase Bus for Units 1

000902 Refurbish the Remaining 1 EA xxxxx $ Sections of Iso-phase Bus for Units 2

000903 Refurbish the Remaining 1 EA xxxxx $ Sections of Iso-phase Bus for Units 3

000904 Refurbish the Remaining 1 EA xxxxx $ Sections of Iso-phase Bus for Units 4

0010 Refurbish the Remaining 4 EA xxxxx $ Sections of Iso-phase Bus for Units 5-8

22016

W912DW24R0021

DOCUMENT 00 41 00 Page 8

This CLIN includes subCLINs 001001, 001002, 001003, and 001004, which may be funded at any time after award for the contractor to proceed with work as detailed in the individual subCLIN descriptions.

TOTAL CLIN 0010 PRICE (All SubCLINs under CLIN 0010)

001001 Refurbish the Remaining 1 EA xxxxx $ Sections of Iso-phase Bus for Units 5

001002 Refurbish the Remaining 1 EA xxxxx $ Sections of Iso-phase Bus for Units 6

001003 Refurbish the Remaining 1 EA xxxxx $ Sections of Iso-phase Bus for Units 7

001004 Refurbish the Remaining 1 EA xxxxx $ Sections of Iso-phase Bus for Units 8

0011 Refurbish the Remaining 4 EA xxxxx $ Sections of Iso-phase Bus for Units 9-12

This CLIN includes subCLINs 001101, 001102, 001103 and 001104, which may be funded at any time after award for the contractor to proceed with work as detailed in the individual subCLIN descriptions.

TOTAL CLIN 0011 PRICE (All SubCLINs under CLIN 0011)

001101 Refurbish the Remaining 1 EA xxxxx $ Sections of Iso-phase Bus for Units 9

001102 Refurbish the Remaining Sections of Iso-phase Bus for Units 10

1 EA xxxxx $

001103 Refurbish the Remaining Sections of Iso-phase Bus for Units 11

1 EA xxxxx $

22016

W912DW24R0021

DOCUMENT 00 41 00 Page 9

001104 Refurbish the Remaining Sections of Iso-phase Bus for Units 12

1 EA xxxxx $

0012 Refurbish the Remaining 4 EA xxxxx $ Sections of Iso-phase Bus for Units 13-16

This CLIN includes subCLINs 001201, 001202, 001203 and 001204, which may be funded at any time after award for the contractor to proceed with work as detailed in the individual subCLIN descriptions.

TOTAL CLIN 0012 PRICE (All SubCLINs under CLIN 0012)

001201 Refurbish the Remaining 1 EA xxxxx $ Sections of Iso-phase Bus for Units 13

001202 Refurbish the Remaining 1 EA xxxxx $ Sections of Iso-phase Bus for Units 14

001203 Refurbish the Remaining 1 EA xxxxx $ Sections of Iso-phase Bus for Units 15

001204 Refurbish the Remaining 1 EA xxxxx $ Sections of Iso-phase Bus for Units 16

0013 Furnish the Services of the 1 JOB xxxxx $ Iso-Phase Bus manufacturer's Field Services Engineer

0014 Provide Operations and 1 JOB xxxxx $ Maintenance manual

0015 As-built Drawings 1 JOB xxxxx $

Total Contract Price $

-- End of Document --

General Decision Number: WA20240068 03/08/2024

Superseded General Decision Number: WA20230068

State: Washington

Construction Type: Heavy including water and sewer line construction

County: Douglas County in Washington.

HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2024. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.90 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2024. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2024 1 02/02/2024 2 03/08/2024

CARP0059-011 06/01/2021

Rates Fringes

CARPENTER (Including Formwork)

EAST OF 120TH MERIDIAN......$ 38.87 17.84

MILLWRIGHT

EAST OF 120TH MERIDIAN......$ 50.68 20.14

(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - ALL

CLASSIFICATIONS EXCEPT MILLWRIGHTS AND PILEDRIVERS

Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities:

Seattle Olympia Bellingham Auburn Bremerton Anacortes Renton Shelton Yakima Aberdeen-Hoquiam Tacoma Wenatchee Ellensburg Everett Port Angeles Centralia Mount Vernon Sunnyside Chelan Pt. Townsend

Zone Pay:

0 -25 radius miles Free 26-35 radius miles $1.00/hour 36-45 radius miles $1.15/hour 46-55 radius miles $1.35/hour Over 55 radius miles $1.55/hour

(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - MILLWRIGHT

AND PILEDRIVER ONLY)

Hourly Zone Pay shall be computed from Seattle Union Hall, Tacoma City center, and Everett City center

Zone Pay:

0 -25 radius miles Free 26-45 radius miles $ .70/hour Over 45 radius miles $1.50/hour

CARP0770-002 06/01/2020

Rates Fringes

CARPENTER (Including Formwork)

WEST OF 120TH MERIDIAN......$ 46.92 18.02

MILLWRIGHT

WEST OF 12OTH MERIDIAN......$ 48.42 18.02

(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - ALL

CLASSIFICATIONS EXCEPT MILLWRIGHTS AND PILEDRIVERS

Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities:

Seattle Olympia Bellingham Auburn Bremerton Anacortes Renton Shelton Yakima Aberdeen-Hoquiam Tacoma Wenatchee Ellensburg Everett Port Angeles Centralia Mount Vernon Sunnyside Chelan Pt. Townsend

Zone Pay:

0 -25 radius miles Free 26-35 radius miles $1.00/hour 36-45 radius miles $1.15/hour 46-55 radius miles $1.35/hour Over 55 radius miles $1.55/hour

(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - MILLWRIGHT

AND PILEDRIVER ONLY)

Hourly Zone Pay shall be computed from Seattle Union Hall, Tacoma City center, and Everett City center

Zone Pay:

0 -25 radius miles Free 26-45 radius miles $ .70/hour Over 45 radius miles $1.50/hour

ELEC0191-013 06/01/2022

Rates Fringes

ELECTRICIAN

DOUGLAS, CHELAN, and OKANOGAN Counties...........$ 46.15 26.10

ISLAND, SAN JUAN, SKAGIT,

SNOHOMISH and WHATCOM Counties....................$ 53.20 27.51

ENGI0302-025 06/01/2023

WEST OF THE 120TH MERIDIAN

Power equipment operators:

Group 1A...................$ 54.93 25.57 Group 1AA..................$ 55.75 25.57 Group 1AAA.................$ 56.54 25.57 Group 1.....................$ 54.13 25.57 Group 2.....................$ 53.42 25.57 Group 3.....................$ 52.83 25.57 Group 4.....................$ 49.40 25.57

Zone Differential (Add to Zone 1 rates):

Zone 2 (26-45 radius miles) - $1.00 Zone 3 (Over 45 radius miles) - $1.30

BASEPOINTS: Aberdeen, Bellingham, Bremerton, Everett, Kent, Mount Vernon, Port Angeles, Port Townsend, Seattle, Shelton, Wenatchee, Yakima

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1AAA - Cranes-over 300 tons, or 300 ft of boom (including jib with attachments)

GROUP 1AA - Cranes 200 to 300 tons, or 250 ft of boom (including jib with attachments); Tower crane over 175 ft in height, base to boom; Excavator/Trackhoe: Over 90 metric tons

GROUP 1A - Cranes, 100 tons thru 199 tons, or 150 ft of boom (including jib with attachments); Crane-overhead, bridge type, 100 tons and over; Tower crane up to 175 ft in height base to boom; Excavator/Trackhoe: over 50 metric tons to 90 metric tons

GROUP 1 - Cranes 45 tons thru 99 tons, under 150 ft of boom (including jib with attachments); Crane-overhead, bridge type, 45 tons thru 99 tons; Derricks on building work;;

Excavator/Trackhoe: over 30 metric tons to 50 metric tons;

Dozer D-10; Paver; Scraper-self propelled 45 yards and over

GROUP 2 - Cranes, 20 tons thru 44 tons with attachments;

Crane-overhead, bridge type-20 tons through 44 tons;;

Excavator/Trackhoe: 15 to 30 metric tons; Drilling Machine;

Screed; Piledriver; Scraper-self propelled under 45 yards;

Boring Machine

GROUP 3 - Cranes-thru 19 tons with attachments; A-frame crane over 10 tons;; Dozers-D-9 and under; Excavator/Trackhoe:

under 15 metric tons; Forklift: 3000 lbs and over with attachments; Oiler; Drill Assistant; Boom Truck over 10 tons

GROUP 4 - Cranes-A frame-10 tons and under; Forklift: under 3000 lbs with attachments; Boom Truck 10 tons and under

ENGI0370-024 07/01/2019

EAST OF THE 120TH MERIDIAN

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 28.46 17.25

GROUP 2.....................$ 28.78 17.25

GROUP 3.....................$ 29.38 17.25

GROUP 4.....................$ 29.55 17.25

GROUP 5.....................$ 29.71 17.25

GROUP 6.....................$ 29.99 17.25

GROUP 7.....................$ 30.26 17.25

GROUP 8.....................$ 31.36 17.25

ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00

Zone 1: Within 45 mile radius of Spokane, Pasco, Washington;

Lewiston, Idaho

Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Drill Assistant

GROUP 2: Fork Lift

GROUP 3: Boring Machine

GROUP 4: Oiler; Drill (churn, core, calyx or diamond)

GROUP 5: Trackhoe/Excavator (under 3/4 yd.); Drilling equipment (8 unch bit and over) (robbins, reverse circulation and similar); Piledriver; Cranes (25 tons & under); Boom Truck (Under 25 tons)

GROUP 6: Trackhoe/Excavator (3/4 yd. to 3 yd.), Bulldozer, 834 R/T & similar; Paver; Scraper; Screed; Cranes (over 25 tons, to and including 45 tons)

GROUP 7: Trackhoe/Excavator (3 yds & over); Cranes (over 45 tons to but not including 85 tons)

GROUP 8: Cranes (85 tons and over, and all climbing, overhead,rail and tower)

BOOM PAY: (All Cranes, Including Tower) 180 ft to 250 ft $ .50 over scale Over 250 ft $ .80 over scale

NOTE:

In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom.

HAZMAT:

Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification.

IRON0014-013 01/02/2023

Rates Fringes

IRONWORKER (Ornamental, Reinforcing and Structural)......$ 37.11 31.57

* LABO0238-010 06/01/2023

EAST OF THE 120TH MERIDIAN

Rates Fringes

LABORER

GROUP 1.....................$ 33.88 15.70

GROUP 2.....................$ 36.72 15.70

GROUP 3.....................$ 37.03 15.70

GROUP 4.....................$ 37.33 15.70

Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00

BASE POINTS: Pasco

Zone 1: 0-45 radius miles from the main post office.

Zone 2: 45 radius miles and over from the main post office

LABORERS CLASSIFICATIONS

GROUP 1: Flagger

GROUP 2: Common or General Laborer; Form-Stripping

GROUP 3: Mason Tender-Cement/Concrete; Handheld Drill

GROUP 4: Grade Checker; High Scaler; Pipelayer

* LABO0238-014 06/01/2023

Rates Fringes

LABORER: Mason Tender - Brick...$ 34.97 15.70

LABO0348-009 06/01/2022

WEST OF THE 120TH MERIDIAN

Rates Fringes

LABORER

GROUP 2.....................$ 29.16 13.80

GROUP 3.....................$ 31.94 13.80

GROUP 4.....................$ 32.72 13.80

GROUP 5.....................$ 33.30 13.80

ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES):

ZONE 2 - $1.00

ZONE 3 - $1.30

BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT,

TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT.

TOWNSEND, PT. ANGELES, AND BREMERTON

ZONE 1 - Projects within 25 radius miles of the respective city hall ZONE 2 - More than 25 but less than 45 radius miles from the respective city hall ZONE 3 - More than 45 radius miles from the respective city hall

LABORERS CLASSIFICATIONS

GROUP 2: Flagger

GROUP 3: General or Common Laborer; Form-Stripping

GROUP 4: Pipelayer; Handheld Drill

GROUP 5: Mason Tender-Brick; Mason Tender-Cement/Concrete;

Grade Checker; High Scaler

PAIN0005-003 07/01/2022

Rates Fringes

PAINTER (Brush, Roller, and Spray.)..........................$ 28.41 14.50

TEAM0690-006 06/01/2022

Rates Fringes

Truck drivers: (ANYONE

WORKING ON HAZMAT JOBS SEE

FOOTNOTE A BELOW)

ZONE 1:SPOKANE ZONE CENTER

GROUP 5....................$ 37.37 20.03

Zone Differential (Add to Zone 1 rate: Zone 1 + $2.00)

BASE POINTS: Spokane, Moses Lake, Pasco, Lewiston

Zone 1: 0-45 radius miles from the main post office Zone 2: Outside a 45 mile radius from the main post office

TRUCK DRIVERS CLASSIFICATIONS

GROUP 5: Semi-Trailer Truck

FOOTNOTE A - Anyone working on a HAZMAT job, where HAZMAT cerfification is required, shall be compensated as a premium, in addition to the classification working in as follows:

LEVEL C-D: - $.50 PER HOUR - This level may use an air purifying respirator or additional protective clothing.

LEVEL A-B: - $1.00 PER HOUR - Uses supplied air in conjunction with a chemical splash suit or fully encapsulated suit with a self-contained breathing apparatus.

Employees shall be paid Hazmat pay in increments of four(4) and eight(8) hours.

* SUWA2009-059 08/07/2009

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 24.50 6.30

LABORER: Common or General (Water and Sewer Lines)..........$ 20.79 4.63

LABORER: Landscape & Irrigation.......................$ 12.27 ** 2.73

OPERATOR: Asphalt Plant.........$ 34.14 0.68

OPERATOR: Backhoe...............$ 28.46 6.04

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 10.63 ** 0.00

OPERATOR: Broom/Sweeper.........$ 27.03 4.67

OPERATOR: Grader/Blade..........$ 27.56 5.53

OPERATOR: Loader................$ 26.90 7.65

OPERATOR: Mechanic..............$ 27.09 7.30

OPERATOR: Power Shovel..........$ 25.12 7.83

OPERATOR: Roller................$ 29.18 4.14

TRUCK DRIVER, Includes Dump Truck............................$ 13.00 ** 0.26

TRUCK DRIVER: Flatbed Truck.....$ 22.74 6.29

TRUCK DRIVER: Lowboy Truck......$ 22.89 5.72

TRUCK DRIVER: Water Truck.......$ 23.46 6.06

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.20) or 13658 ($12.90). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

W912DW24R0021R0002
Amendment R0002
00 41 00 R0002
General Decision Number

File details come from the government source that posted it. Updated .