Chief Joseph Dam Debris Boom Replacement

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912DW23B0010
Agency
ENDIST Seattle US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Y1PZ Construction Of Other Non-Building Facilities
Place of performance
Bridgeport, Washington 98813, United States
More information

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, Seattle District seeks to replace the debris boom at Chief Joseph Dam near Bridgeport, Washington. The solicitation requires installation of a new 2,500 foot steel cable debris boom with composite buoys and steel boat gate, demolition and removal of the existing boom and 234 buoys, abandonment of in-water structures, and utilization of underwater remotely operated vehicles. Offerors must submit proposals electronically through the Procurement Integrated Enterprise Environment by May 5, 2023. Award will be made to the responsible bidder offering the most advantageous price.

This is a 100% small business set-aside solicitation under NAICS 238910 with a place of performance in Bridgeport, WA. The estimated value is between $1-5 million to be completed within one year of award. Ten small businesses submitted offers by the deadline ranging from $2.47 million to $4.28 million, with KRCI LLC providing the lowest offer. The independent government cost estimate was $3.95 million.

Notice text

10 versions

Update #10 · Latest ·

Abstract added, see attachment C.04 W912DW23B0010 ABSTRACT - CJD Debris Boom Signed

Amendment 0007 - Issued 4/28/2023 -Update the Liquidated Damages to $1,865.00.

Amendment 0006 - Issued 4/21/2023 - TOC revised to add requirements to submit price schedule, reps/certs, and Pre-Award Info, POC changed to Scott Houts, extension of bid date.

Amendment 0005 - Issued 4/18/2023 - Spec revisions and extension of bid due date -

Amendment 0004 - Issued 4/11/2023 - Revision to specs/plans.

Amendment 0003 - Issued 4/3/2023 - Posting of Site Visit Attendance List.

Amendment 0002 - Issued 3/22/2023 - Revises the point of contact and the virtual bid opening details.

Amendment 0001 - Issued 3/15/2023 - Revises the Request for Visitation Authority (RVA) document. The hour and date specified for receipt of Offer is not extended. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect. Chief Joseph Dam Debris Boom Replacement OVERVIEW: The U.S. Army Corps of Engineers (USACE), Seattle District, requires the replacement of the debris boom at the Chief Joseph Dam. The Chief Joseph Dam is located near Bridgeport, WA and is on the Columbia River 51 miles downstream of the Grand Coulee Dam. The general scope includes, but is not limited to, the following: a. A new north shore anchor (right bank) will be installed using rock anchors or an equivalent horizontal sub-surface soil anchor system capable of resisting the maximum expected boom tension. This anchor will be similar to the existing north shore (right bank) anchor system. b. A new 2,500 foot total length steel cable will be installed to anew north shore (right bank) anchor. This cable will have manufactured composite buoys or a similar debris diversion barrier installed to contain and move debris to the south shore stilling basin. c. A steel boat gate, as part of the debris boom requirements, will be fabricated using structural steel and connect the cable spans. This boat gate will have an above water access arm that is remote controlled. d. The south shore (left bank) anchor will remain in-use, while the north shore (right bank) anchor will be abandoned in-place. Connection of the new boom cable will occur concurrently when the existing debris boom cable is disconnected. The south shore anchor shall only have one connected boom at a time. e. The existing debris boom cables for all spans will be demolished. The cables connecting the debris boom to the in-water concrete cofferdams will be disconnected or cut above the two existing coffer dams in-water below. In-water cables will be disconnected or cut after the cable is pulled or positioned vertically above the in-water anchor and slack is removed to minimize the amount to be abandoned. f. The existing debris boom and all cables will be removed and disposed of by the contractor. g. Removal of the 234-buoy system and associated cables and attachments. h. The existing in-water concrete coffer dams will be abandoned in-place. i. Utilize of underwater ROV for cutting underwater cable/chain and taking video of existing underwater anchor and foundation being abandoned. j. Removal of approximately 180 linear feet surface conduit and wires from north shore to the junction box in the existing cathodic protection system. The magnitude of construction is estimated to be between $1 million and $5 million.

Update #9 ·

Amendment 0007 - Issued 4/28/2023 -Update the Liquidated Damages to $1,865.00.

Amendment 0006 - Issued 4/21/2023 - TOC revised to add requirements to submit price schedule, reps/certs, and Pre-Award Info, POC changed to Scott Houts, extension of bid date.

Amendment 0005 - Issued 4/18/2023 - Spec revisions and extension of bid due date -

Amendment 0004 - Issued 4/11/2023 - Revision to specs/plans.

Amendment 0003 - Issued 4/3/2023 - Posting of Site Visit Attendance List.

Amendment 0002 - Issued 3/22/2023 - Revises the point of contact and the virtual bid opening details.

Amendment 0001 - Issued 3/15/2023 - Revises the Request for Visitation Authority (RVA) document. The hour and date specified for receipt of Offer is not extended. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect. Chief Joseph Dam Debris Boom Replacement OVERVIEW: The U.S. Army Corps of Engineers (USACE), Seattle District, requires the replacement of the debris boom at the Chief Joseph Dam. The Chief Joseph Dam is located near Bridgeport, WA and is on the Columbia River 51 miles downstream of the Grand Coulee Dam. The general scope includes, but is not limited to, the following: a. A new north shore anchor (right bank) will be installed using rock anchors or an equivalent horizontal sub-surface soil anchor system capable of resisting the maximum expected boom tension. This anchor will be similar to the existing north shore (right bank) anchor system. b. A new 2,500 foot total length steel cable will be installed to anew north shore (right bank) anchor. This cable will have manufactured composite buoys or a similar debris diversion barrier installed to contain and move debris to the south shore stilling basin. c. A steel boat gate, as part of the debris boom requirements, will be fabricated using structural steel and connect the cable spans. This boat gate will have an above water access arm that is remote controlled. d. The south shore (left bank) anchor will remain in-use, while the north shore (right bank) anchor will be abandoned in-place. Connection of the new boom cable will occur concurrently when the existing debris boom cable is disconnected. The south shore anchor shall only have one connected boom at a time. e. The existing debris boom cables for all spans will be demolished. The cables connecting the debris boom to the in-water concrete cofferdams will be disconnected or cut above the two existing coffer dams in-water below. In-water cables will be disconnected or cut after the cable is pulled or positioned vertically above the in-water anchor and slack is removed to minimize the amount to be abandoned. f. The existing debris boom and all cables will be removed and disposed of by the contractor. g. Removal of the 234-buoy system and associated cables and attachments. h. The existing in-water concrete coffer dams will be abandoned in-place. i. Utilize of underwater ROV for cutting underwater cable/chain and taking video of existing underwater anchor and foundation being abandoned. j. Removal of approximately 180 linear feet surface conduit and wires from north shore to the junction box in the existing cathodic protection system. The magnitude of construction is estimated to be between $1 million and $5 million.

Update #8 ·

Amendment 0006 - Issued 4/21/2023 - TOC revised to add requirements to submit price schedule, reps/certs, and Pre-Award Info, POC changed to Scott Houts, extension of bid date. Amendment 0005 - Issued 4/18/2023 - Spec revisions and extension of bid due date - Amendment 0004 - Issued 4/11/2023 - Revision to specs/plans. Amendment 0003 - Issued 4/3/2023 - Posting of Site Visit Attendance List. Amendment 0002 - Issued 3/22/2023 - Revises the point of contact and the virtual bid opening details. Amendment 0001 - Issued 3/15/2023 - Revises the Request for Visitation Authority (RVA) document. The hour and date specified for receipt of Offer is not extended. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect. Chief Joseph Dam Debris Boom Replacement OVERVIEW: The U.S. Army Corps of Engineers (USACE), Seattle District, requires the replacement of the debris boom at the Chief Joseph Dam. The Chief Joseph Dam is located near Bridgeport, WA and is on the Columbia River 51 miles downstream of the Grand Coulee Dam. The general scope includes, but is not limited to, the following: a. A new north shore anchor (right bank) will be installed using rock anchors or an equivalent horizontal sub-surface soil anchor system capable of resisting the maximum expected boom tension. This anchor will be similar to the existing north shore (right bank) anchor system. b. A new 2,500 foot total length steel cable will be installed to anew north shore (right bank) anchor. This cable will have manufactured composite buoys or a similar debris diversion barrier installed to contain and move debris to the south shore stilling basin. c. A steel boat gate, as part of the debris boom requirements, will be fabricated using structural steel and connect the cable spans. This boat gate will have an above water access arm that is remote controlled. d. The south shore (left bank) anchor will remain in-use, while the north shore (right bank) anchor will be abandoned in-place. Connection of the new boom cable will occur concurrently when the existing debris boom cable is disconnected. The south shore anchor shall only have one connected boom at a time. e. The existing debris boom cables for all spans will be demolished. The cables connecting the debris boom to the in-water concrete cofferdams will be disconnected or cut above the two existing coffer dams in-water below. In-water cables will be disconnected or cut after the cable is pulled or positioned vertically above the in-water anchor and slack is removed to minimize the amount to be abandoned. f. The existing debris boom and all cables will be removed and disposed of by the contractor. g. Removal of the 234-buoy system and associated cables and attachments. h. The existing in-water concrete coffer dams will be abandoned in-place. i. Utilize of underwater ROV for cutting underwater cable/chain and taking video of existing underwater anchor and foundation being abandoned. j. Removal of approximately 180 linear feet surface conduit and wires from north shore to the junction box in the existing cathodic protection system. The magnitude of construction is estimated to be between $1 million and $5 million.

Update #7 ·

Amendment 0005 - Issued 4/18/2023 - Spec revisions and extension of bid due date - Amendment 0004 - Issued 4/11/2023 - Revision to specs/plans. Amendment 0003 - Issued 4/3/2023 - Posting of Site Visit Attendance List. Amendment 0002 - Issued 3/22/2023 - Revises the point of contact and the virtual bid opening details. Amendment 0001 - Issued 3/15/2023 - Revises the Request for Visitation Authority (RVA) document. The hour and date specified for receipt of Offer is not extended. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect. Chief Joseph Dam Debris Boom Replacement OVERVIEW: The U.S. Army Corps of Engineers (USACE), Seattle District, requires the replacement of the debris boom at the Chief Joseph Dam. The Chief Joseph Dam is located near Bridgeport, WA and is on the Columbia River 51 miles downstream of the Grand Coulee Dam. The general scope includes, but is not limited to, the following: a. A new north shore anchor (right bank) will be installed using rock anchors or an equivalent horizontal sub-surface soil anchor system capable of resisting the maximum expected boom tension. This anchor will be similar to the existing north shore (right bank) anchor system. b. A new 2,500 foot total length steel cable will be installed to anew north shore (right bank) anchor. This cable will have manufactured composite buoys or a similar debris diversion barrier installed to contain and move debris to the south shore stilling basin. c. A steel boat gate, as part of the debris boom requirements, will be fabricated using structural steel and connect the cable spans. This boat gate will have an above water access arm that is remote controlled. d. The south shore (left bank) anchor will remain in-use, while the north shore (right bank) anchor will be abandoned in-place. Connection of the new boom cable will occur concurrently when the existing debris boom cable is disconnected. The south shore anchor shall only have one connected boom at a time. e. The existing debris boom cables for all spans will be demolished. The cables connecting the debris boom to the in-water concrete cofferdams will be disconnected or cut above the two existing coffer dams in-water below. In-water cables will be disconnected or cut after the cable is pulled or positioned vertically above the in-water anchor and slack is removed to minimize the amount to be abandoned. f. The existing debris boom and all cables will be removed and disposed of by the contractor. g. Removal of the 234-buoy system and associated cables and attachments. h. The existing in-water concrete coffer dams will be abandoned in-place. i. Utilize of underwater ROV for cutting underwater cable/chain and taking video of existing underwater anchor and foundation being abandoned. j. Removal of approximately 180 linear feet surface conduit and wires from north shore to the junction box in the existing cathodic protection system. The magnitude of construction is estimated to be between $1 million and $5 million.

Update #6 ·

Amendment 0004 - Issued 4/11/2023 - Revision to specs/plans. Amendment 0003 - Issued 4/3/2023 - Posting of Site Visit Attendance List. Amendment 0002 - Issued 3/22/2023 - Revises the point of contact and the virtual bid opening details. Amendment 0001 - Issued 3/15/2023 - Revises the Request for Visitation Authority (RVA) document. The hour and date specified for receipt of Offer is not extended. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect. Chief Joseph Dam Debris Boom Replacement OVERVIEW: The U.S. Army Corps of Engineers (USACE), Seattle District, requires the replacement of the debris boom at the Chief Joseph Dam. The Chief Joseph Dam is located near Bridgeport, WA and is on the Columbia River 51 miles downstream of the Grand Coulee Dam. The general scope includes, but is not limited to, the following: a. A new north shore anchor (right bank) will be installed using rock anchors or an equivalent horizontal sub-surface soil anchor system capable of resisting the maximum expected boom tension. This anchor will be similar to the existing north shore (right bank) anchor system. b. A new 2,500 foot total length steel cable will be installed to anew north shore (right bank) anchor. This cable will have manufactured composite buoys or a similar debris diversion barrier installed to contain and move debris to the south shore stilling basin. c. A steel boat gate, as part of the debris boom requirements, will be fabricated using structural steel and connect the cable spans. This boat gate will have an above water access arm that is remote controlled. d. The south shore (left bank) anchor will remain in-use, while the north shore (right bank) anchor will be abandoned in-place. Connection of the new boom cable will occur concurrently when the existing debris boom cable is disconnected. The south shore anchor shall only have one connected boom at a time. e. The existing debris boom cables for all spans will be demolished. The cables connecting the debris boom to the in-water concrete cofferdams will be disconnected or cut above the two existing coffer dams in-water below. In-water cables will be disconnected or cut after the cable is pulled or positioned vertically above the in-water anchor and slack is removed to minimize the amount to be abandoned. f. The existing debris boom and all cables will be removed and disposed of by the contractor. g. Removal of the 234-buoy system and associated cables and attachments. h. The existing in-water concrete coffer dams will be abandoned in-place. i. Utilize of underwater ROV for cutting underwater cable/chain and taking video of existing underwater anchor and foundation being abandoned. j. Removal of approximately 180 linear feet surface conduit and wires from north shore to the junction box in the existing cathodic protection system. The magnitude of construction is estimated to be between $1 million and $5 million.

Update #5 ·

Amendment 0003 - Issued 4/3/2023 - Posting of Site Visit Attendance List. Amendment 0002 - Issued 3/22/2023 - Revises the point of contact and the virtual bid opening details. Amendment 0001 - Issued 3/15/2023 - Revises the Request for Visitation Authority (RVA) document. The hour and date specified for receipt of Offer is not extended. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect. Chief Joseph Dam Debris Boom Replacement OVERVIEW: The U.S. Army Corps of Engineers (USACE), Seattle District, requires the replacement of the debris boom at the Chief Joseph Dam. The Chief Joseph Dam is located near Bridgeport, WA and is on the Columbia River 51 miles downstream of the Grand Coulee Dam. The general scope includes, but is not limited to, the following: a. A new north shore anchor (right bank) will be installed using rock anchors or an equivalent horizontal sub-surface soil anchor system capable of resisting the maximum expected boom tension. This anchor will be similar to the existing north shore (right bank) anchor system. b. A new 2,500 foot total length steel cable will be installed to anew north shore (right bank) anchor. This cable will have manufactured composite buoys or a similar debris diversion barrier installed to contain and move debris to the south shore stilling basin. c. A steel boat gate, as part of the debris boom requirements, will be fabricated using structural steel and connect the cable spans. This boat gate will have an above water access arm that is remote controlled. d. The south shore (left bank) anchor will remain in-use, while the north shore (right bank) anchor will be abandoned in-place. Connection of the new boom cable will occur concurrently when the existing debris boom cable is disconnected. The south shore anchor shall only have one connected boom at a time. e. The existing debris boom cables for all spans will be demolished. The cables connecting the debris boom to the in-water concrete cofferdams will be disconnected or cut above the two existing coffer dams in-water below. In-water cables will be disconnected or cut after the cable is pulled or positioned vertically above the in-water anchor and slack is removed to minimize the amount to be abandoned. f. The existing debris boom and all cables will be removed and disposed of by the contractor. g. Removal of the 234-buoy system and associated cables and attachments. h. The existing in-water concrete coffer dams will be abandoned in-place. i. Utilize of underwater ROV for cutting underwater cable/chain and taking video of existing underwater anchor and foundation being abandoned. j. Removal of approximately 180 linear feet surface conduit and wires from north shore to the junction box in the existing cathodic protection system. The magnitude of construction is estimated to be between $1 million and $5 million.

Update #4 ·

Amendment 0003 - Issued 4/3/2023 - Posting of Site Visit Attendance List.  Amendment 0002 - Issued 3/22/2023 - Revises the point of contact and the virtual bid opening details. Amendment 0001 - Issued 3/15/2023 - Revises the Request for Visitation Authority (RVA) document. The hour and date specified for receipt of Offer is not extended. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect. Chief Joseph Dam Debris Boom Replacement OVERVIEW: The U.S. Army Corps of Engineers (USACE), Seattle District, requires the replacement of the debris boom at the Chief Joseph Dam. The Chief Joseph Dam is located near Bridgeport, WA and is on the Columbia River 51 miles downstream of the Grand Coulee Dam. The general scope includes, but is not limited to, the following: a. A new north shore anchor (right bank) will be installed using rock anchors or an equivalent horizontal sub-surface soil anchor system capable of resisting the maximum expected boom tension. This anchor will be similar to the existing north shore (right bank) anchor system. b. A new 2,500 foot total length steel cable will be installed to anew north shore (right bank) anchor. This cable will have manufactured composite buoys or a similar debris diversion barrier installed to contain and move debris to the south shore stilling basin. c. A steel boat gate, as part of the debris boom requirements, will be fabricated using structural steel and connect the cable spans. This boat gate will have an above water access arm that is remote controlled. d. The south shore (left bank) anchor will remain in-use, while the north shore (right bank) anchor will be abandoned in-place. Connection of the new boom cable will occur concurrently when the existing debris boom cable is disconnected. The south shore anchor shall only have one connected boom at a time. e. The existing debris boom cables for all spans will be demolished. The cables connecting the debris boom to the in-water concrete cofferdams will be disconnected or cut above the two existing coffer dams in-water below. In-water cables will be disconnected or cut after the cable is pulled or positioned vertically above the in-water anchor and slack is removed to minimize the amount to be abandoned. f. The existing debris boom and all cables will be removed and disposed of by the contractor. g. Removal of the 234-buoy system and associated cables and attachments. h. The existing in-water concrete coffer dams will be abandoned in-place. i. Utilize of underwater ROV for cutting underwater cable/chain and taking video of existing underwater anchor and foundation being abandoned. j. Removal of approximately 180 linear feet surface conduit and wires from north shore to the junction box in the existing cathodic protection system. The magnitude of construction is estimated to be between $1 million and $5 million.

Update #3 ·

Amendment 0002 - Issued 3/22/2023 - Revises the point of contact and the virtual bid opening details. 

Amendment 0001 - Issued 3/15/2023 - Revises the Request for Visitation Authority (RVA) document.  The hour and date specified for receipt of Offer is not extended.  Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

OVERVIEW

The U.S. Army Corps of Engineers (USACE), Seattle District, requires the replacement of the debris boom at the Chief Joseph Dam. The Chief Joseph Dam is located near Bridgeport, WA and is on the  Columbia River 51 miles downstream of the Grand Coulee Dam. The general scope includes, but is not  limited to, the following:

a. A new north shore anchor (right bank) will be installed using rock anchors or an equivalent  horizontal sub-surface soil anchor system capable of resisting the maximum expected boom tension. This anchor will be similar to the existing north shore (right bank) anchor system.

b. A new 2,500 foot total length steel cable will be installed to anew north shore (right bank) anchor. This cable will have manufactured composite buoys or a similar debris diversion barrier installed to contain and move debris to the south shore stilling basin.

c. A steel boat gate, as part of the debris boom requirements, will be fabricated using structural steel and connect the cable spans. This boat gate will have an above water access arm that is remote controlled.

d. The south shore (left bank) anchor will remain in-use, while the north shore (right bank) anchor will be abandoned in-place. Connection of the new boom cable will occur concurrently when the existing debris boom cable is disconnected. The south shore anchor shall only have one connected boom at atime.

e. The existing debris boom cables for all spans will be demolished. The cables connecting the debris boom to the in-water concrete cofferdams will be disconnected or cut above the two existing cofferdams in-water below. In-water cables will be disconnected or cut after the cable is pulled or positioned vertically above the in-water anchor and slack is removed to minimize the amount to be abandoned.

f. The existing debris boom and all cables will be removed and disposed of by the contractor.

g. Removal of the 234-buoy system and associated cables and attachments.

h. The existing in-water concrete coffer dams will be abandoned in-place.

i. Utilize of underwater ROV for cutting underwater cable/chain and taking video of existing underwater anchor and foundation being abandoned.

j. Removal of approximately 180 linear feet surface conduit and wires from north shore to the junction box in the existing cathodic protection system.

Offer Submission Instructions:

The Offeror shall submit its offer electronically through the PIEE Solicitation Module. When posting an offer, ensure electronic files are clearly identified with the solicitation number, company name, volume, section, and or/item. The minimum required naming format for files is as follows:

  W912DW23B0010 - Company Name_Item

Offers will not be accepted if submitted by mail or hand carried and will not be evaluated. Offers sent through proprietary or third party File Transfer Protocol (FTP) sites or DoD SAFE will not be accepted. The Offeror is responsible to confirm the offer has been received. All offers received after the exact time specified for receipt shall be treated as late submissions and will not be considered except under facts and circumstances allowed by the Federal Acquisition Regulation (FAR) and this solicitation.

For PIEE registration, training, and instructions for posting an offer, refer to the following links:

PIEE Registration:  https://piee.eb.mil/

Note: There are two vendor roles (Proposal Manager, Proposal View Only) for PIEE Solicitation Module. The Proposal Manager role is required to submit an offer to a solicitation. Please be advised that when using the PIEE Solicitation Module, the user’s email address in PIEE must match the email address on file in SAM.gov.

PIEE Solicitation Module

Training and instructions are accessible through PIEE – Web Based Training (WBT) at https://pieetraining.eb.mil/wbt/ 

For Frequently Asked Questions (FAQs) and additional training, go to the DoD Procurement Toolbox – eBusiness -- Solicitation Module at https://dodprocurementtoolbox.com/site-pages/solicitation-module

In the unlikely event the PIEE system and/or Solicitation Module is not operational, and the Offeror is unable to access or use the system, the Offeror shall immediately notify the Contracting Officer and Contracting Specialist. Notification must occur prior to the submission deadline and shall be in writing through authorized email identified in the solicitation. If an alternate method for offer submission is authorized via email due to system outages, the Offeror must obtain prior approval from the Contracting Officer to use the alternate submission method.

Ensure all documentation submitted meets supported file extensions identified in PIEE FAQs. Narrative portions of the offer shall be in Adobe Acrobat Portable Document Format (PDF) searchable text format. Embedded sound or video (e.g., MPEG) files are not authorized and shall not be included.

Update #2 ·

Amendment 0001 - Issued 3/15/2023 - Revises the Request for Visitation Authority (RVA) document.  The hour and date specified for receipt of Offer is not extended.  Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

OVERVIEW

The U.S. Army Corps of Engineers (USACE), Seattle District, requires the replacement of the debris boom at the Chief Joseph Dam. The Chief Joseph Dam is located near Bridgeport, WA and is on the  Columbia River 51 miles downstream of the Grand Coulee Dam. The general scope includes, but is not  limited to, the following:

a. A new north shore anchor (right bank) will be installed using rock anchors or an equivalent  horizontal sub-surface soil anchor system capable of resisting the maximum expected boom tension. This anchor will be similar to the existing north shore (right bank) anchor system.

b. A new 2,500 foot total length steel cable will be installed to anew north shore (right bank) anchor. This cable will have manufactured composite buoys or a similar debris diversion barrier installed to contain and move debris to the south shore stilling basin.

c. A steel boat gate, as part of the debris boom requirements, will be fabricated using structural steel and connect the cable spans. This boat gate will have an above water access arm that is remote controlled.

d. The south shore (left bank) anchor will remain in-use, while the north shore (right bank) anchor will be abandoned in-place. Connection of the new boom cable will occur concurrently when the existing debris boom cable is disconnected. The south shore anchor shall only have one connected boom at atime.

e. The existing debris boom cables for all spans will be demolished. The cables connecting the debris boom to the in-water concrete cofferdams will be disconnected or cut above the two existing cofferdams in-water below. In-water cables will be disconnected or cut after the cable is pulled or positioned vertically above the in-water anchor and slack is removed to minimize the amount to be abandoned.

f. The existing debris boom and all cables will be removed and disposed of by the contractor.

g. Removal of the 234-buoy system and associated cables and attachments.

h. The existing in-water concrete coffer dams will be abandoned in-place.

i. Utilize of underwater ROV for cutting underwater cable/chain and taking video of existing underwater anchor and foundation being abandoned.

j. Removal of approximately 180 linear feet surface conduit and wires from north shore to the junction box in the existing cathodic protection system.

Offer Submission Instructions:

The Offeror shall submit its offer electronically through the PIEE Solicitation Module. When posting an offer, ensure electronic files are clearly identified with the solicitation number, company name, volume, section, and or/item. The minimum required naming format for files is as follows:

  W912DW23B0010 - Company Name_Item

Offers will not be accepted if submitted by mail or hand carried and will not be evaluated. Offers sent through proprietary or third party File Transfer Protocol (FTP) sites or DoD SAFE will not be accepted. The Offeror is responsible to confirm the offer has been received. All offers received after the exact time specified for receipt shall be treated as late submissions and will not be considered except under facts and circumstances allowed by the Federal Acquisition Regulation (FAR) and this solicitation.

For PIEE registration, training, and instructions for posting an offer, refer to the following links:

PIEE Registration:  https://piee.eb.mil/

Note: There are two vendor roles (Proposal Manager, Proposal View Only) for PIEE Solicitation Module. The Proposal Manager role is required to submit an offer to a solicitation. Please be advised that when using the PIEE Solicitation Module, the user’s email address in PIEE must match the email address on file in SAM.gov.

PIEE Solicitation Module

Training and instructions are accessible through PIEE – Web Based Training (WBT) at https://pieetraining.eb.mil/wbt/ 

For Frequently Asked Questions (FAQs) and additional training, go to the DoD Procurement Toolbox – eBusiness -- Solicitation Module at https://dodprocurementtoolbox.com/site-pages/solicitation-module

In the unlikely event the PIEE system and/or Solicitation Module is not operational, and the Offeror is unable to access or use the system, the Offeror shall immediately notify the Contracting Officer and Contracting Specialist. Notification must occur prior to the submission deadline and shall be in writing through authorized email identified in the solicitation. If an alternate method for offer submission is authorized via email due to system outages, the Offeror must obtain prior approval from the Contracting Officer to use the alternate submission method.

Ensure all documentation submitted meets supported file extensions identified in PIEE FAQs. Narrative portions of the offer shall be in Adobe Acrobat Portable Document Format (PDF) searchable text format. Embedded sound or video (e.g., MPEG) files are not authorized and shall not be included.

Update #1 ·

OVERVIEW

The U.S. Army Corps of Engineers (USACE), Seattle District, requires the replacement of the debris boom at the Chief Joseph Dam.  The Chief Joseph Dam is located near Bridgeport, WA and is on the Columbia River 51 miles downstream of the Grand Coulee Dam.  The general scope includes, but is not limited to, the following:

a. A new north shore anchor (right bank) will be installed using rock anchors or an equivalent horizontal sub-surface soil anchor system capable of resisting the maximum expected boom tension. This anchor will be similar to the existing north shore (right bank) anchor system.

b. A new 2,500 foot total length steel cable will be installed to anew north shore (right bank) anchor. This cable will have manufactured composite buoys or a similar debris diversion barrier installed to contain and move debris to the south shore stilling basin.

c. A steel boat gate, as part of the debris boom requirements, will be fabricated using structural steel and connect the cable spans. This boat gate will have an above water access arm that is remote controlled.

d. The south shore (left bank) anchor will remain in-use, while the north shore (right bank) anchor will be abandoned in-place. Connection of the new boom cable will occur concurrently when the existing debris boom cable is disconnected. The south shore anchor shall only have one connected boom at a time.

e. The existing debris boom cables for all spans will be demolished.  The cables connecting the debris boom to the in-water concrete cofferdams will be disconnected or cut above the two existing coffer dams in-water below. In-water cables will be disconnected or cut after the cable is pulled or positioned vertically above the in-water anchor and slack is removed to minimize the amount to be abandoned.

f. The existing debris boom and all cables will be removed and disposed of by the contractor.

g. Removal of the 234-buoy system and associated cables and attachments.

h. The existing in-water concrete coffer dams will be abandoned in-place.

i. Utilize of underwater ROV for cutting underwater cable/chain and taking video of existing underwater anchor and foundation being abandoned.

j. Removal of approximately 180 linear feet surface conduit and wires from north shore to the junction box in the existing cathodic protection system.

Offer Submission Instructions:

The Offeror shall submit its offer electronically through the PIEE Solicitation Module. When posting an offer, ensure electronic files are clearly identified with the solicitation number, company name, volume, section, and or/item. The minimum required naming format for files is as follows:

 W912DW23B0010 - Company Name_Item

Offers will not be accepted if submitted by mail or hand carried and will not be evaluated. Offers sent through proprietary or third party File Transfer Protocol (FTP) sites or DoD SAFE will not be accepted. The Offeror is responsible to confirm the offer has been received. All offers received after the exact time specified for receipt shall be treated as late submissions and will not be considered except under facts and circumstances allowed by the Federal Acquisition Regulation (FAR) and this solicitation.

For PIEE registration, training, and instructions for posting an offer, refer to the following links:

PIEE Registration:  https://piee.eb.mil/

Note: There are two vendor roles (Proposal Manager, Proposal View Only) for PIEE Solicitation Module. The Proposal Manager role is required to submit an offer to a solicitation. Please be advised that when using the PIEE Solicitation Module, the user’s email address in PIEE must match the email address on file in SAM.gov.

PIEE Solicitation Module

Training and instructions are accessible through PIEE – Web Based Training (WBT) at https://pieetraining.eb.mil/wbt/ 

For Frequently Asked Questions (FAQs) and additional training, go to the DoD Procurement Toolbox – eBusiness -- Solicitation Module at https://dodprocurementtoolbox.com/site-pages/solicitation-module

In the unlikely event the PIEE system and/or Solicitation Module is not operational, and the Offeror is unable to access or use the system, the Offeror shall immediately notify the Contracting Officer and Contracting Specialist. Notification must occur prior to the submission deadline and shall be in writing through authorized email identified in the solicitation. If an alternate method for offer submission is authorized via email due to system outages, the Offeror must obtain prior approval from the Contracting Officer to use the alternate submission method.

Ensure all documentation submitted meets supported file extensions identified in PIEE FAQs. Narrative portions of the offer shall be in Adobe Acrobat Portable Document Format (PDF) searchable text format. Embedded sound or video (e.g., MPEG) files are not authorized and shall not be included.

Attachments

Files attached to this notice, newest first
File Type Posted
C.04 W912DW23B0010 ABSTRACT - CJD Debris Boom Signed.pdf PDF
W912DW23B0010-R00007CJD Debris Boom.pdf PDF
W912DW23B0010-R0006 CJD Debris Boom.pdf PDF
W912DW23B0010 R0005 CJD DEBRIS BOOM.pdf PDF
W912DW23B0010R0004 CJD DEBRIS BOOM.pdf PDF
W912DW23B0010R0003 CJD Debris Boom.pdf PDF
W912DW23B0010 0002.pdf PDF
W912DW23B0010 0001.pdf PDF
W912DW23B0010 IFB.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Chief Joseph Dam Debris Boom Award Award Notice
Chief Joseph Dam Debris Boom Replacement This notice · Latest solicitation Solicitation
Chief Joseph Dam Debris Boom Pre-Solicitation
Chief Joseph Dam Debris Boom Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity