Cheatham Dam Tainter Gate Repair and Painting

Award Notice Posted

Solicitation number
W912P5-15-R-0006
Agency
Awarded
to Royal Bridge, Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
W912P515C0007 Federal contract award
PSC
Not on record
Place of performance
Usace District, Nashville P.O. Box 1070, 801 Broad Street Nashville TN 37202 US

Notice details come from SAM.gov. Updated .

Notice text

5 versions

Update #5 · Latest ·

A construction contract will be issued for repair and painting of seven (7) Tainter Gates, one (1) bulkhead lifting beam, and other miscellaneous appurtenant metal components at Cheatham Dam located on the Cumberland River near Ashland City, TN.

The Tainter Gates are 27'x60' gates with skin plate on the Upstream and Downstream face. All seven gates have similar deterioration and will require replacement of a substantial number of bolts and rivets, replacement of all side seals (rubber), member replacement in the lower section of the gate, installation of an access hatch on the top of the gate, straightening or build-up of the lower seal and other miscellaneous metal repairs. Currently the interior of the gates are coated with coal tar epoxy and the exterior with a vinyl paint system. All structural components have been tested for lead based paint and positive results were attained on numerous components. Hence the contractor shall plan for hazardous waste removal and disposal. The gates will be repainted with similar paint systems.

The spillway bulkhead lifting beam will require member straightening, minor welding, and bolt replacement. The spillway bulkhead lifting beam shall be blasted and repainted with a vinyl paint system similar to the exterior of the Tainter Gates.

All work will be performed on-site. Government furnished spillway bulkheads shall be placed upstream and downstream of the Tainter Gates for the duration of the repair and painting operations. Placement of the spillway bulkheads will require marine plant and will be the responsibility of the contractor. The contractor may be required to install downstream bulkhead seal angles via the use of divers. The existing spillway bulkheads allow for unwatering of one gate bay only. A second set of spillway bulkheads will be procured by the Government outside of this contract and will be available to the construction contractor in 2016.

River conditions fluctuate substantially at Cheatham Dam and the contractor may encounter periods of shutdown and / or demobilization. The construction season for this contract is from June 1 to November 30 (6 months). It is expected that all work can be performed in 3.5 construction seasons. The estimated length of the contract is 42 months.

A low price technically acceptable (LPTA) type acquisition is planned with four (4) evaluation factors. This contract will be organized as a base plus options contract. The estimated value of this contract is between $5,000,000 and $10,000,000. 

The site visit is scheduled for 30 April 2015 at 10:00 AM EDT.  Register via email for the site visit within 48 hours of the start time to James.W.Purcell@usace.army.mil
by sending a completed Site Visit Form (see uploaded attachment to this notice).

Site visit location is Cheatham Powerplant conference room at 2250 Cheatham Dam Road, Charlotte, TN 37036-5058.  Vehicular access is from the West Bank of the Cumberland River in Dickson County.  There is no vehicular access across the lock and dam from the East.

Update #4 ·

A construction contract will be issued for repair and painting of seven (7) Tainter Gates, one (1) bulkhead lifting beam, and other miscellaneous appurtenant metal components at Cheatham Dam located on the Cumberland River near Ashland City, TN.

The Tainter Gates are 27'x60' gates with skin plate on the Upstream and Downstream face. All seven gates have similar deterioration and will require replacement of a substantial number of bolts and rivets, replacement of all side seals (rubber), member replacement in the lower section of the gate, installation of an access hatch on the top of the gate, straightening or build-up of the lower seal and other miscellaneous metal repairs. Currently the interior of the gates are coated with coal tar epoxy and the exterior with a vinyl paint system. All structural components have been tested for lead based paint and positive results were attained on numerous components. Hence the contractor shall plan for hazardous waste removal and disposal. The gates will be repainted with similar paint systems.

The spillway bulkhead lifting beam will require member straightening, minor welding, and bolt replacement. The spillway bulkhead lifting beam shall be blasted and repainted with a vinyl paint system similar to the exterior of the Tainter Gates.

All work will be performed on-site. Government furnished spillway bulkheads shall be placed upstream and downstream of the Tainter Gates for the duration of the repair and painting operations. Placement of the spillway bulkheads will require marine plant and will be the responsibility of the contractor. The contractor may be required to install downstream bulkhead seal angles via the use of divers. The existing spillway bulkheads allow for unwatering of one gate bay only. A second set of spillway bulkheads will be procured by the Government outside of this contract and will be available to the construction contractor in 2016.

River conditions fluctuate substantially at Cheatham Dam and the contractor may encounter periods of shutdown and / or demobilization. The construction season for this contract is from June 1 to November 30 (6 months). It is expected that all work can be performed in 3.5 construction seasons. The estimated length of the contract is 42 months.

A low price technically acceptable (LPTA) type acquisition is planned with four (4) evaluation factors. This contract will be organized as a base plus options contract. The estimated value of this contract is between $5,000,000 and $10,000,000. 

Participation in a site visit is mandatory to be eligible for award.  The site visit is scheduled for 30 April 2015 at 10:00 AM EDT.  Register via email for the site visit within 48 hours of the start time to James.W.Purcell@usace.army.mil
by sending a completed Site Visit Form (see uploaded attachment to this notice).

Site visit location is Cheatham Powerplant conference room at 2250 Cheatham Dam Road, Charlotte, TN 37036-5058.  Vehicular access is from the West Bank of the Cumberland River in Dickson County.  There is no vehicular access across the lock and dam from the East.

Update #3 ·

A construction contract will be issued for repair and painting of seven (7) Tainter Gates, one (1) bulkhead lifting beam, and other miscellaneous appurtenant metal components at Cheatham Dam located on the Cumberland River near Ashland City, TN.

The Tainter Gates are 27'x60' gates with skin plate on the Upstream and Downstream face. All seven gates have similar deterioration and will require replacement of a substantial number of bolts and rivets, replacement of all side seals (rubber), member replacement in the lower section of the gate, installation of an access hatch on the top of the gate, straightening or build-up of the lower seal and other miscellaneous metal repairs. Currently the interior of the gates are coated with coal tar epoxy and the exterior with a vinyl paint system. All structural components have been tested for lead based paint and positive results were attained on numerous components. Hence the contractor shall plan for hazardous waste removal and disposal. The gates will be repainted with similar paint systems.

The spillway bulkhead lifting beam will require member straightening, minor welding, and bolt replacement. The spillway bulkhead lifting beam shall be blasted and repainted with a vinyl paint system similar to the exterior of the Tainter Gates.

All work will be performed on-site. Government furnished spillway bulkheads shall be placed upstream and downstream of the Tainter Gates for the duration of the repair and painting operations. Placement of the spillway bulkheads will require marine plant and will be the responsibility of the contractor. The contractor may be required to install downstream bulkhead seal angles via the use of divers. The existing spillway bulkheads allow for unwatering of one gate bay only. A second set of spillway bulkheads will be procured by the Government outside of this contract and will be available to the construction contractor in 2016.

River conditions fluctuate substantially at Cheatham Dam and the contractor may encounter periods of shutdown and / or demobilization. The construction season for this contract is from June 1 to November 30 (6 months). It is expected that all work can be performed in 3.5 construction seasons. The estimated length of the contract is 42 months.

A low price technically acceptable (LPTA) type acquisition is planned with four (4) evaluation factors. This contract will be organized as a base plus options contract. The estimated value of this contract is between $5,000,000 and $10,000,000. 

Participation in a site visit is mandatory to be eligible for award.  The site visit is scheduled for 30 April 2015 at 10:00 AM EDT.  Register via email for the site visit within 48 hours of the start time to James.W.Purcell@usace.army.mil
by sending a completed Site Visit Form (see uploaded attachment to this notice).

Site visit location is Cheatham Powerplant conference room at 2250 Cheatham Dam Road, Charlotte, TN 37036-5058.  Vehicular access is from the West Bank of the Cumberland River in Dickson County.  There is no vehicular access across the lock and dam from the East.

Update #2 ·

A construction contract will be issued for repair and painting of seven (7) Tainter Gates, one (1) bulkhead lifting beam, and other miscellaneous appurtenant metal components at Cheatham Dam located on the Cumberland River near Ashland City, TN.

The Tainter Gates are 27'x60' gates with skin plate on the Upstream and Downstream face. All seven gates have similar deterioration and will require replacement of a substantial number of bolts and rivets, replacement of all side seals (rubber), member replacement in the lower section of the gate, installation of an access hatch on the top of the gate, straightening or build-up of the lower seal and other miscellaneous metal repairs. Currently the interior of the gates are coated with coal tar epoxy and the exterior with a vinyl paint system. All structural components have been tested for lead based paint and positive results were attained on numerous components. Hence the contractor shall plan for hazardous waste removal and disposal. The gates will be repainted with similar paint systems.

The spillway bulkhead lifting beam will require member straightening, minor welding, and bolt replacement. The spillway bulkhead lifting beam shall be blasted and repainted with a vinyl paint system similar to the exterior of the Tainter Gates.

All work will be performed on-site. Government furnished spillway bulkheads shall be placed upstream and downstream of the Tainter Gates for the duration of the repair and painting operations. Placement of the spillway bulkheads will require marine plant and will be the responsibility of the contractor. The contractor may be required to install downstream bulkhead seal angles via the use of divers. The existing spillway bulkheads allow for unwatering of one gate bay only. A second set of spillway bulkheads will be procured by the Government outside of this contract and will be available to the construction contractor in 2016.

River conditions fluctuate substantially at Cheatham Dam and the contractor may encounter periods of shutdown and / or demobilization. The construction season for this contract is from June 1 to November 30 (6 months). It is expected that all work can be performed in 3.5 construction seasons. The estimated length of the contract is 42 months.

A low price technically acceptable (LPTA) type acquisition is planned with four (4) evaluation factors. This contract will be organized as a base plus options contract. The estimated value of this contract is between $5,000,000 and $10,000,000.

The intent is to post the solicitation the week of 20 April 2015.  Participation in a site visit is mandatory to be eligible for award.  The site visit is scheduled for 30 April 2015 at 10:00 AM EDT.  Register via email for the site visit within 24 hours of the start time to James.W.Purcell@usace.army.mil

Site visit location is Cheatham Powerplant conference room at 2250 Cheatham Dam Road, Charlotte, TN 37036-5058.  Vehicular access is from the West Bank of the Cumberland River in Dickson County.  There is no vehicular access across the lock and dam from the East.

Update #1 ·

A construction contract will be issued for repair and painting of seven (7) Tainter Gates, ten (10) spillway bulkhead supports, and one (1) bulkhead lifting beam at Cheatham Dam located on the Cumberland River near Ashland City, TN.

The Tainter Gates are 27'x60' gates with skin plate on the Upstream and Downstream face. All seven gates have similar deterioration and will require replacement of a substantial number of bolts and rivets, replacement of all side seals (rubber), member replacement in the lower section of the gate, installation of an access hatch on the top of the gate, straightening or build-up of the lower seal and other miscellaneous metal repairs. Currently the interior of the gates are coated with coal tar epoxy and the exterior with a vinyl paint system. All structural components have been tested for lead based paint and positive results were attained on numerous components. Hence the contractor shall plan for hazardous waste removal and disposal. The gates will be repainted with similar paint systems.

The spillway bulkhead lifting beam will require member straightening, minor welding, and bolt replacement. The spillway bulkhead supports and lifting beam shall be blasted and repainted with a vinyl paint system similar to the exterior of the Tainter Gates.

All work will be performed on-site. Government furnished spillway bulkheads shall be placed upstream and downstream of the Tainter Gates for the duration of the repair and painting operations. Placement of the spillway bulkheads will require marine plant and will be the responsibility of the contractor. The contractor may be required to install downstream bulkhead seal angles via the use of divers. The existing spillway bulkheads allow for unwatering of one gate bay only. A second set of spillway bulkheads will be procured by the Government outside of this contract and will be available to the construction contractor in 2016.

River conditions fluctuate substantially at Cheatham Dam and the contractor may encounter periods of shutdown and / or demobilization. The construction season for this contract is from June 1 to November 30 (6 months). It is expected that all work can be performed in 3 construction seasons. The estimated length of the contract is 36 months.

A low price technically acceptable (LPTA) type acquisition is planned with four (4) evaluation factors. This contract will be organized as a base plus options contract. The estimated value of this contract is between $5,000,000 and $10,000,000.

Files

Notice history

Notice Type Posted
Repair & Paint Cheatham Dam Tainter Gates Latest Award Notice
This notice Original Award Notice