This solicitation seeks a contractor to construct the Chama Basin Trail Bridge No. 738-0.1 located on the Conejos Ranger District of the Rio Grande National Forest in Colorado. The scope of work includes removing trees, excavating, constructing abutments and wingwalls, backfilling, installing riprap and approach rails, erecting steel girders, constructing the bridge deck, finishing grading and seeding. The Department of Agriculture Forest Service will evaluate proposals based on price. Offerors must visit the site on September 7th and submit pricing by September 13th.
This is a total small business set-aside. The NAICS code is 237990 and PSC code is R499. The estimated price range for the project is $25,000 to $100,000, and the period of performance is September 19, 2022 through November 4, 2022. The bridge will provide a 48-foot clear span over the Chama River Trail at coordinates 37.032446N 106.554W near La Jara, Colorado.
Notice text
2 versions
Update #2 · Latest ·
AMENDMENT #1
EXTEND PERIOD OF PERFORMANCE TO JULY 31, 2023
SCOPE OF CONTRACT
The work shall consist of what is shown on the plans, stated in the specifications, and summarized below:
- Remove trees and clear and grub as required.
- Excavate for foundation construction.
- Construct the abutments and wingwalls.
- Backfill the abutments to just below the beam seat elevation.
- Grade portions of the channel banks under the new bridge.
- Install riprap adjacent to the new structure.
- Erect the steel girders.
- Construct the bridge.
- Construct the remaining backfill and the approach embankments.
- Install the approach rails.
- Perform all work to required to construct aggregate surface.
- Open the new bridge to traffic.
Prepare the finished grading and apply seeding
PROJECT LOCATON
Chama Basin Trail Bridge: The trail bridge will be located on a Forest Service Trail (FST) 738, which accesses the Rio Grande National Forest.
The Chama Basin Trail Bridge No. 738-0.1 located on the Conejos Ranger District of the Rio Grande National Forest, Latitude 37.03497326, Longitude -106.5533922.
Directions: From Chama, NM travel north on Highway 17 to the Chama River Road (FSR 121), turn left onto FSR 121, travel about 6 miles north to the Rio Grande NF boundary. Take the left fork about one mile to the new bridge location.
MAGNITUDE OF CONSTRUCTION PROJECT
The estimated price range of the project is between $25,000-$100,000
SITE VISIT
Date: September 7, 2022
Time: 1400____________
Location: The coordinates are 37.032446°N 106.554°W and the directions are:
From Antonito, CO, drive South on CO-17 S for 39 miles, continue on NM- 17 S for 3 miles, turn right on Co Rd 455/FSR-121, follow signs for Chama Basin Trailhead, approximately 6 miles.
Update #1 ·
SCOPE OF CONTRACT
The work shall consist of what is shown on the plans, stated in the specifications, and summarized below:
- Remove trees and clear and grub as required.
- Excavate for foundation construction.
- Construct the abutments and wingwalls.
- Backfill the abutments to just below the beam seat elevation.
- Grade portions of the channel banks under the new bridge.
- Install riprap adjacent to the new structure.
- Erect the steel girders.
- Construct the bridge.
- Construct the remaining backfill and the approach embankments.
- Install the approach rails.
- Perform all work to required to construct aggregate surface.
- Open the new bridge to traffic.
Prepare the finished grading and apply seeding
PROJECT LOCATON
Chama Basin Trail Bridge: The trail bridge will be located on a Forest Service Trail (FST) 738, which accesses the Rio Grande National Forest.
The Chama Basin Trail Bridge No. 738-0.1 located on the Conejos Ranger District of the Rio Grande National Forest, Latitude 37.03497326, Longitude -106.5533922.
Directions: From Chama, NM travel north on Highway 17 to the Chama River Road (FSR 121), turn left onto FSR 121, travel about 6 miles north to the Rio Grande NF boundary. Take the left fork about one mile to the new bridge location.
MAGNITUDE OF CONSTRUCTION PROJECT
The estimated price range of the project is between $25,000-$100,000
SITE VISIT
Date: September 7, 2022
Time: 1400____________
Location: The coordinates are 37.032446°N 106.554°W and the directions are:
From Antonito, CO, drive South on CO-17 S for 39 miles, continue on NM- 17 S for 3 miles, turn right on Co Rd 455/FSR-121, follow signs for Chama Basin Trailhead, approximately 6 miles.
Attachments
| File | Type | Posted |
|---|---|---|
| Amendment 1.pdf | ||
| Attachment 1 Specifications.pdf | ||
| 1240LT22Q0149.pdf | ||
| Attachment 3 Wage Determination.pdf | ||
| Attachment 2 PLANS.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity