Ceremonial Courtroom Woodwork Repair Project
Award Notice Posted
- Solicitation number
- GS-02-P-17-PV-C-0002
- Agency
-
Region 2
Public Buildings Service, General Services Administration
- Awarded
- to Woodwork Restoration, LLC
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- 47PC0218C0001 Federal contract award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
- Place of performance
- 500 Pearl Street New York, New York 10007, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
The Ceremonial Courtroom Woodwork Restoration Project, Solicitation # GS-02-P-17-PV-C-0002, has been awarded to Woodwork Restoration, LLC, Contract # 47PC0218C0001 on 10/17/2017 in the amount of $210,000.00 for the wood restoration of the Ceremonial Courtroom located at the Daniel Patrick Moynihan Federal Courthouse located at 500 Pearl Street, New York, NY 10007
Update #1 ·
THIS IS A PRESOLICITATION NOTICE:
The General Services Administration, Region 2, Public Buildings Service, is seeking to perform wood restoration for the ceremonial courtroom at the Daniel Patrick Moynihan Federal Courthouse located at 500 Pearl Street, New York, NY 10007.
Scope of Work to include:
WOODWORK RESTORATION AND CLEANING
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. Touch-up, repair, stripping, cleaning, and refinishing as necessary of existing
wood doors, wall paneling, enclosure walls, furniture and built-in units in
existing ceremonial courtroom.
B. Refinishing wall behind Judges Bench to repair fading only.
C. Refinishing of existing doors including outer courtroom foyer doors at
entrance. Full Refinish only at doors to Robing Room specified on DPM-9C Image 5
D. Staining, toning, and shading as necessary to achieve the desired color and
final appearance of the woodwork.
E. Finishing System Types
1. Finish type A - Complete Strip to bare wood and refinish.
2. Finish type B - Heavy Clean, scuff and refinish.
3. Finish type C - Good Clean and Repair and Touch-up as necessary.
1.2 PRICING OPTIONS
A. Option 1. Three level Judges Bench and Rear Counter, Deputy Boxes, Podium
including the refinishing of the Oak Treads to match mahogany.
B. Option 2. Spectator Benches and Rails.
C. Option 3. Jury Rail.
D. Option 4. Jury Box.
E. Option 5. Eight Window Pocket sills, jambs, and head. Including adjacent
pilaster return panels from floor to ceiling.
DESCRIPTION OF WORK SECTIONS
(SEE ATTACHMENT)
Ceremonial Courtroom
Daniel Patrick Moynihan U.S. Courthouse, New York, NY
Woodwork Restoration and Cleaning
1.3 REFERENCES
A. AWI/AWMAC/WI: (AWS) "Architectural Woodwork Standards": Current Edition,
including Errata subject to their date of posting on Project bid date. All Work in
this Section shall be AWS Premium Grade.
1.4 SUBMITTALS
A. Subcontractors Qualification Form: Qualification data on AWI form for firms and
individuals as required demonstrating specified experience and capability to
perform the work of this Section.
B. Product Data: For each type of restoration and cleaning materials indicated,
include manufacturer's product literature, application instructions and safety
data.
1.5 QUALITY ASSURANCE
A. Control Sample: The Project Control Sample is the Ceremonial Courtroom rear
wall. Match all Work in this Section for grain, color, gloss, effect and the
general quality of the work.
B. General Objective: The objective of the Work in this section is to match the
Control Samples so that both the original and the restored and cleaned work
are indistinguishable from one another when compared.
C. Restoration Specialist: Work of woodwork restoration and cleaning must be
performed by a firm having not less than five (5) years successful experience in
comparable woodwork restoration work including successful completion of work
on at least three (3) significant historic buildings under the direction of federal
and state preservation agencies in the last five (5) years and employing workers
skilled in restoration processes and operation indicated.
1. Only skilled craftspersons that are familiar and experienced with
woodwork restoration work as specified herein shall be used for work of
this Section. Refer to Subcontractors Qualification Form for requirements
of proposed personnel to perform the work.
2. One experienced supervisor shall be present at all times during execution
of work and shall personally direct woodwork restoration work.
3. In acceptance or rejection of woodwork restoration, no allowance will be
made for lack of skill on part of craftsperson.
D. Quality Control Test Samples on Site: Prior to start of woodwork restoration
work, prepare quality control test samples in each of the above finish system
type of restoration work on woodwork for each type and method of cleaning and
Ceremonial Courtroom
Daniel Patrick Moynihan U.S. Courthouse, New York, NY
Woodwork Restoration and Cleaning
refinishing of the woodwork as indicated below, to demonstrate methods and
quality of workmanship for work of this Section to include cleaning, repairs and
restored woodwork finishes.
1. Restore, one area for each type of restoration method, approximately four
ft square, where selected by the Architect.
2. Follow procedures specified in this Section.
3. Obtain Architect's approval of visual qualities before proceeding with work.
If any quality control test sample is not approved, repeat restoration of
woodwork following requirements of this Section as necessary to receive
Architect's approval.
4. Protect approved test samples using all means necessary to prevent
damage or deterioration before completion of work while allowing access
to the mock-up for comparison with ongoing work. Remove protection at
conclusion of all work.
5. The approved test samples shall represent minimum standard of
acceptability for woodwork restoration.
6. Perform adhesion tests to test samples.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Deliver materials to Project site in supplier's original wrappings and containers,
labeled with source's or manufacturer's name, material or product brand name,
and lot number, if any, to prevent use of unauthorized products.
B. Store materials in their original, undamaged packages and containers, inside a
well-ventilated area protected from weather, moisture, soiling, extreme
temperatures, and humidity.
C. Keep storage area neat and orderly. Containers used in storage area will be
maintained in a clean condition, free of foreign materials and residue. All
containers must be sealed when not in use, and shall not remain open
overnight.
D. Remove oily rags and waste from the jobsite daily. Take necessary measures
to ensure that workers and work areas are protected from fire and health
hazards resulting from handling, mixing, and application of materials.
E. Proper respirators and ventilation precautions will be required to protect the
applicators and building occupants during the handling and application process.
1.7 PROJECT CONDITIONS
A. Limitations: Work under this contract shall be scheduled at times during normal
working hours or at the direction of the building manager. Work must involve on
Ceremonial Courtroom
Daniel Patrick Moynihan U.S. Courthouse, New York, NY
Woodwork Restoration and Cleaning
site woodworking procedures that are non-disruptive and will not interfere or be
transmitted to adjacent courtroom facilities where they create a disturbance in
court procedures. Chemical stripping, spraying and any other odor producing
procedures shall take place after normal working hours. These odors may be
vented through the building exhaust system at the direction of the building
manager.
B. Availability of the building freight elevators and access at the loading shall be
coordinated with the building manager.
C. Apply stains and finishes only when the temperature of surfaces to be finished
and surrounding air temperatures are between 65 and 90 degrees F.
D. Do not apply stains and finishes when snow, rain, fog, or mist causes the relative
humidity to exceed 75 percent at temperatures less than 5 degrees F above the
dew point or to damp or wet surfaces.
E. If lead paints and finishes are present in current coatings and the Contractor is
responsible for handling, removal, and disposal as applicable according to city,
county, State and Federal regulations.
F. Provide scaffolding, ladders, and lifts necessary to execute the Work in this
Section.
1.8 PROTECTION AND MASKING.
C. Take particular care to protect the following:
1. Adjacent surfaces.
2. Stone surfaces.
3. Metal surfaces.
4. Tile/mosaic surfaces.
5. Plaster surfaces.
6. Smoke detectors and fire alarms.
7. HVAC registers and ducts.
D. Protect areas retaining their original finishes from damage and overspray at all
costs.
E. Mask, tape, and take great care when applying finish materials to areas
adjacent to original finishes as necessary.
1. Mask off all adjacent floor, wall, ceiling, and trim surfaces with 2 layers of
6 mil polyethylene clear sheeting.
2. Pad floor surfaces under polyethylene sheeting with one or two layers of
1-inch thick foam carpet padding.
F. Safeguard the buildings lighting fixtures, floors, stonework and equipment and
materials to be installed.
Ceremonial Courtroom
Daniel Patrick Moynihan U.S. Courthouse, New York, NY
Woodwork Restoration and Cleaning
G. Protect the work of other trades against any over spraying, marring, masking
residue, or other damage.
H. Seal off all existing HVAC registers and ducts within the area of Work.
I. Seal off and protect all fire and smoke alarms within the area of Work.
1.9 VENTILATION.
A. Install an air handling system as necessary to effectively move fresh air into and
through the work space, including at least one air handling unit to move fresh
air into the space and one air handling unit to blow the remover fumes and air
out of the space. Provide negative air pressure within the area of Work.
Coordinate the opening and closing of the necessary windows with Contracting
Officer.
1.10 WARRANTY
A. The Contractor shall warrant the Work in this Section for one (1) year beginning
with the final acceptance of all Work executed.
PART 2 - PRODUCTS
2.1 RESTORATION AND CLEANING MATERIALS
A. Available Products: Subject to compliance with requirements, products that may
be incorporated into the Work include, but are not limited to the following:
B. Mohawk Finishing Products, Inc.:
1. Mohawk Wash Wax #M712-1907.
2. Mohawk Finish Remover #2 #710-2727.
C. Sherwin-Williams/Minwax Company
1. Custom stain compatible with Minwax Water Based Oil-Modified Polyurethane.
2. Minwax Water Based Oil-Modified Polyurethane #143.
D. Unlisted manufacturers must be submitted to Architect for approval prior to use.
E. Material compatibility: Provide filler, sanding sealer, stain, toners and finish/top
coat materials that are compatible with one another and the substrates indicated
under conditions of service and application.
Ceremonial Courtroom
Daniel Patrick Moynihan U.S. Courthouse, New York, NY
Woodwork Restoration and Cleaning
F. Color, Sheen and Effect: Match the Project Mockup Control Samples.
2.2 REPAIR MATERIALS AND WORKMANSHIP
A. Comply with AWS Premium Grade.
PART 3 - EXECUTION
3.1 EXAMINATION
Examine surfaces indicated to be cleaned and restored for compliance with
requirements, and other conditions affecting performance.
1. For the record, prepare a written report of the work, listing conditions
detrimental to performance.
2. Proceed with work only after unsatisfactory conditions have been
corrected.
3.2.1 PREPARATION.
A. Remove hardware and hardware accessories, plates, machined surfaces, and
similar items already installed that are not to be finished and that have not been
removed by others. If removal is impractical or impossible because of the size or
weight of the item, provide surface applied protection before surface preparation
and finishing. After completing finishing operations in each space or area,
reinstall items removed using workers skilled in the trades involved, unless
otherwise indicated.
B. De-wax and Cleaning: Before stripping and or applying finish or other surface
treatment, clean substrates of substances that could impair the bond of coatings.
First de-wax with Mohawk Wax Wash Liquid Preparatory Cleaner #M712-1907.
Remove oil and grease before cleaning. Schedule cleaning and finishing so dust
and other contaminants from the cleaning process will not fall on wet, newly
finished surfaces.
C. Surface Preparation: De-wax, clean and prepare surfaces to be finished
according to manufacturer's written instructions for each particular substrate
condition.
1. Bare wood: Bare wood that has been stripped of its finish for refinishing
must be cleaned immediately following the removal of the existing finish
by wiping the surface thoroughly with an odorless mineral spirits wash
using a rag or stripping pad attached to a sponge. Once the surface has
dried, the bare wood must be wiped clean of dust and airborne dirt.
2. Finished wood: Wood with an existing finish that is to be recoated must
first be de-waxed and then cleaned.
Ceremonial Courtroom
Daniel Patrick Moynihan U.S. Courthouse, New York, NY
Woodwork Restoration and Cleaning
D. Materials Preparation: Mix and prepare finish materials according to
manufacturer's written instructions.
1. Stir materials before application to produce a mixture of uniform density.
Stir as required during application. Do not stir surface film into material. If
necessary, remove surface film and strain materials before using.
2. Use only thinners approved by finish manufacturer and only within
recommended limits.
3.3 APPLICATION
A. Apply finish according to manufacturer's written instructions. Use applicators and
techniques best suited for substrate, type of material being applied, and room
conditions.
1. Do not finish over dirt, rust, scale, grease, moisture, scuffed surfaces, or
conditions detrimental to the formation of a durable finish film.
2. Provide finish coats that are compatible with sanding sealers used.
3. The completed finish must be uniform in appearance throughout and
match the approved samples. No thin, flat, sagging or inconsistent finished
surfaces will be accepted.
4. Comply with AWS Section 5 Premium Grade.
B. Finish Type A: Areas that require complete to bare wood Strip and Re-do.
1. De-wax, Chemical Strip and Wash with odorless mineral spirits to Bare Wood.
Overnight dry.
2. Through Sand with 120-Grit aluminum oxide sandpaper.
3. Stain and Toner as necessary to match Architects Sample.
4. Cross coat Seal and Sand 240 aluminum oxide sandpaper.
5. Topcoats with AWS System 12, Polyurethane, Water-Based.
6. Sand with 320 or 400 grit aluminum oxide sandpaper.
7. Hand rub with four (4) 0000 steel wool as necessary
C Finish Type B: Heavy Clean, scuff sand, touch-up and refinish.
1. De-wax.
2. Heavy sand with 240 aluminum oxide sandpaper.
3. Touch-up, Stain and Toner as required, including filling deep defects.
4. Topcoats with AWI System 12 Polyurethane, Water-Based.
5. Sand with 320 or 400 grit aluminum oxide sandpaper.
6. Hand rub with four (4) 0000 steel wool as necessary.
D Finish Type C: Good Clean and Repair and Touch-up as necessary.
1. Three times de-wax.
2. Touch-up as necessary.
3. Hand rub with four (4) 0000 steel wool as necessary.
Reference attached DPM-9C Images 1-11 for lacation of each finish level
Ceremonial Courtroom
Daniel Patrick Moynihan U.S. Courthouse, New York, NY
Woodwork Restoration and Cleaning
3.4 WOODWORK REPAIR AND PATCHING
A. General: Where existing woodwork or casework has damage, has been altered
or is scheduled to be altered under this Contract, repairs and alterations shall
be made in the shop or in the field, as applicable. Restoration shall include, but
is not limited to, the following items:
1. Remove abandoned fasteners and hardware.
2. Fill holes, dents, scratches and abrasion scars
3. Replace missing pieces with new pieces in matching wood species and
cut, with profile and finish to match Control Sample.
4. Repair veneer or replace veneer as require to match original.
5. Secure loose pieces, scratches and abrasion scars.
6. Secure loose joinery, such as mitered corners that have separated,
making joints tight again.
B. All repairs shall be made using like materials to match original.
1. For repairs 1/8" diameter or less, use wood wax filler, tinted to match
natural color of adjacent woodwork.
2. For repairs greater than 1/8", but less than 2" in diameter, use a wood
Dutchman or plug to fill hole.
3. For repairs greater than 2" in diameter, fill hole with a boat shaped patch,
matching the species grain and color of the wood.
3.5 CLEANING.
A. Cleanup: At the end of each workday, remove empty cans, rags, rubbish and
other discarded paint materials from Project site.
3.6 PROTECTION
A. Provide final protection and maintain conditions in a manner that ensure
woodwork is without damage or deterioration at time of Substantial Completion.
Ceremonial Courtroom
Daniel Patrick Moynihan U.S. Courthouse, New York, NY
Woodwork Restoration and Cleaning
B. Provide "Wet Paint" signs to protect newly finished surfaces. After completing
finishing operations, remove temporary protective wrappings provided by others
to protect their work.
C. After work of other trades is complete, touch-up and restore damaged or defaced
surfaces.
END OF SECTION