Ceremonial Courtroom Woodwork Repair Project

Award Notice Posted

Solicitation number
GS-02-P-17-PV-C-0002
Agency
Awarded
to Woodwork Restoration, LLC
Set-aside
Total Small Business

Opportunity facts

Contract number
47PC0218C0001 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
500 Pearl Street New York, New York 10007, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

 

The Ceremonial Courtroom Woodwork Restoration Project​, Solicitation # GS-02-P-17-PV-C-0002, ​ has been awarded to Woodwork Restoration, LLC​, Contract # 47PC0218C0001 ​on 10/17/2017  ​​in the amount of $210,000.00 for the wood restoration of the Ceremonial Courtroom located at the Daniel Patrick Moynihan Federal Courthouse located at 500 Pearl Street, New York, NY 10007

Update #1 ·

THIS IS A PRESOLICITATION NOTICE:

The General Services Administration, Region 2, Public Buildings Service, is seeking to perform wood restoration for the ceremonial courtroom at the Daniel Patrick Moynihan Federal Courthouse located at 500 Pearl Street, New York, NY 10007.


Scope of Work to include:



WOODWORK RESTORATION AND CLEANING



PART 1 - GENERAL


1.1 SECTION INCLUDES


A. Touch-up, repair, stripping, cleaning, and refinishing as necessary of existing


wood doors, wall paneling, enclosure walls, furniture and built-in units in


existing ceremonial courtroom.


B. Refinishing wall behind Judges Bench to repair fading only.


C. Refinishing of existing doors including outer courtroom foyer doors at


entrance. Full Refinish only at doors to Robing Room specified on DPM-9C Image 5


D. Staining, toning, and shading as necessary to achieve the desired color and


final appearance of the woodwork.


E. Finishing System Types


1. Finish type A - Complete Strip to bare wood and refinish.


2. Finish type B - Heavy Clean, scuff and refinish.


3. Finish type C - Good Clean and Repair and Touch-up as necessary.


1.2 PRICING OPTIONS


A. Option 1. Three level Judges Bench and Rear Counter, Deputy Boxes, Podium


including the refinishing of the Oak Treads to match mahogany.


B. Option 2. Spectator Benches and Rails.


C. Option 3. Jury Rail.


D. Option 4. Jury Box.


E. Option 5. Eight Window Pocket sills, jambs, and head. Including adjacent


pilaster return panels from floor to ceiling.



DESCRIPTION OF WORK SECTIONS


(SEE ATTACHMENT)


Ceremonial Courtroom


Daniel Patrick Moynihan U.S. Courthouse, New York, NY


Woodwork Restoration and Cleaning


1.3 REFERENCES


A. AWI/AWMAC/WI: (AWS) "Architectural Woodwork Standards": Current Edition,


including Errata subject to their date of posting on Project bid date. All Work in


this Section shall be AWS Premium Grade.


1.4 SUBMITTALS


A. Subcontractors Qualification Form: Qualification data on AWI form for firms and


individuals as required demonstrating specified experience and capability to


perform the work of this Section.


B. Product Data: For each type of restoration and cleaning materials indicated,


include manufacturer's product literature, application instructions and safety


data.


1.5 QUALITY ASSURANCE


A. Control Sample: The Project Control Sample is the Ceremonial Courtroom rear


wall. Match all Work in this Section for grain, color, gloss, effect and the


general quality of the work.


B. General Objective: The objective of the Work in this section is to match the


Control Samples so that both the original and the restored and cleaned work


are indistinguishable from one another when compared.


C. Restoration Specialist: Work of woodwork restoration and cleaning must be


performed by a firm having not less than five (5) years successful experience in


comparable woodwork restoration work including successful completion of work


on at least three (3) significant historic buildings under the direction of federal


and state preservation agencies in the last five (5) years and employing workers


skilled in restoration processes and operation indicated.


1. Only skilled craftspersons that are familiar and experienced with


woodwork restoration work as specified herein shall be used for work of


this Section. Refer to Subcontractors Qualification Form for requirements


of proposed personnel to perform the work.


2. One experienced supervisor shall be present at all times during execution


of work and shall personally direct woodwork restoration work.


3. In acceptance or rejection of woodwork restoration, no allowance will be


made for lack of skill on part of craftsperson.


D. Quality Control Test Samples on Site: Prior to start of woodwork restoration


work, prepare quality control test samples in each of the above finish system


type of restoration work on woodwork for each type and method of cleaning and


Ceremonial Courtroom


Daniel Patrick Moynihan U.S. Courthouse, New York, NY


Woodwork Restoration and Cleaning


refinishing of the woodwork as indicated below, to demonstrate methods and


quality of workmanship for work of this Section to include cleaning, repairs and


restored woodwork finishes.


1. Restore, one area for each type of restoration method, approximately four


ft square, where selected by the Architect.


2. Follow procedures specified in this Section.


3. Obtain Architect's approval of visual qualities before proceeding with work.


If any quality control test sample is not approved, repeat restoration of


woodwork following requirements of this Section as necessary to receive


Architect's approval.


4. Protect approved test samples using all means necessary to prevent


damage or deterioration before completion of work while allowing access


to the mock-up for comparison with ongoing work. Remove protection at


conclusion of all work.


5. The approved test samples shall represent minimum standard of


acceptability for woodwork restoration.


6. Perform adhesion tests to test samples.


1.6 DELIVERY, STORAGE, AND HANDLING


A. Deliver materials to Project site in supplier's original wrappings and containers,


labeled with source's or manufacturer's name, material or product brand name,


and lot number, if any, to prevent use of unauthorized products.


B. Store materials in their original, undamaged packages and containers, inside a


well-ventilated area protected from weather, moisture, soiling, extreme


temperatures, and humidity.


C. Keep storage area neat and orderly. Containers used in storage area will be


maintained in a clean condition, free of foreign materials and residue. All


containers must be sealed when not in use, and shall not remain open


overnight.


D. Remove oily rags and waste from the jobsite daily. Take necessary measures


to ensure that workers and work areas are protected from fire and health


hazards resulting from handling, mixing, and application of materials.


E. Proper respirators and ventilation precautions will be required to protect the


applicators and building occupants during the handling and application process.


1.7 PROJECT CONDITIONS


A. Limitations: Work under this contract shall be scheduled at times during normal


working hours or at the direction of the building manager. Work must involve on


Ceremonial Courtroom


Daniel Patrick Moynihan U.S. Courthouse, New York, NY


Woodwork Restoration and Cleaning


site woodworking procedures that are non-disruptive and will not interfere or be


transmitted to adjacent courtroom facilities where they create a disturbance in


court procedures. Chemical stripping, spraying and any other odor producing


procedures shall take place after normal working hours. These odors may be


vented through the building exhaust system at the direction of the building


manager.


B. Availability of the building freight elevators and access at the loading shall be


coordinated with the building manager.


C. Apply stains and finishes only when the temperature of surfaces to be finished


and surrounding air temperatures are between 65 and 90 degrees F.


D. Do not apply stains and finishes when snow, rain, fog, or mist causes the relative


humidity to exceed 75 percent at temperatures less than 5 degrees F above the


dew point or to damp or wet surfaces.


E. If lead paints and finishes are present in current coatings and the Contractor is


responsible for handling, removal, and disposal as applicable according to city,


county, State and Federal regulations.


F. Provide scaffolding, ladders, and lifts necessary to execute the Work in this


Section.


1.8 PROTECTION AND MASKING.


C. Take particular care to protect the following:


1. Adjacent surfaces.


2. Stone surfaces.


3. Metal surfaces.


4. Tile/mosaic surfaces.


5. Plaster surfaces.


6. Smoke detectors and fire alarms.


7. HVAC registers and ducts.


D. Protect areas retaining their original finishes from damage and overspray at all


costs.


E. Mask, tape, and take great care when applying finish materials to areas


adjacent to original finishes as necessary.


1. Mask off all adjacent floor, wall, ceiling, and trim surfaces with 2 layers of


6 mil polyethylene clear sheeting.


2. Pad floor surfaces under polyethylene sheeting with one or two layers of


1-inch thick foam carpet padding.


F. Safeguard the buildings lighting fixtures, floors, stonework and equipment and


materials to be installed.


Ceremonial Courtroom


Daniel Patrick Moynihan U.S. Courthouse, New York, NY


Woodwork Restoration and Cleaning


G. Protect the work of other trades against any over spraying, marring, masking


residue, or other damage.


H. Seal off all existing HVAC registers and ducts within the area of Work.


I. Seal off and protect all fire and smoke alarms within the area of Work.


1.9 VENTILATION.


A. Install an air handling system as necessary to effectively move fresh air into and


through the work space, including at least one air handling unit to move fresh


air into the space and one air handling unit to blow the remover fumes and air


out of the space. Provide negative air pressure within the area of Work.


Coordinate the opening and closing of the necessary windows with Contracting


Officer.


1.10 WARRANTY


A. The Contractor shall warrant the Work in this Section for one (1) year beginning


with the final acceptance of all Work executed.


PART 2 - PRODUCTS


2.1 RESTORATION AND CLEANING MATERIALS


A. Available Products: Subject to compliance with requirements, products that may


be incorporated into the Work include, but are not limited to the following:


B. Mohawk Finishing Products, Inc.:


1. Mohawk Wash Wax #M712-1907.


2. Mohawk Finish Remover #2 #710-2727.


C. Sherwin-Williams/Minwax Company


1. Custom stain compatible with Minwax Water Based Oil-Modified Polyurethane.


2. Minwax Water Based Oil-Modified Polyurethane #143.


D. Unlisted manufacturers must be submitted to Architect for approval prior to use.


E. Material compatibility: Provide filler, sanding sealer, stain, toners and finish/top


coat materials that are compatible with one another and the substrates indicated


under conditions of service and application.


Ceremonial Courtroom


Daniel Patrick Moynihan U.S. Courthouse, New York, NY


Woodwork Restoration and Cleaning


F. Color, Sheen and Effect: Match the Project Mockup Control Samples.


2.2 REPAIR MATERIALS AND WORKMANSHIP


A. Comply with AWS Premium Grade.


PART 3 - EXECUTION


3.1 EXAMINATION


Examine surfaces indicated to be cleaned and restored for compliance with


requirements, and other conditions affecting performance.


1. For the record, prepare a written report of the work, listing conditions


detrimental to performance.


2. Proceed with work only after unsatisfactory conditions have been


corrected.


3.2.1 PREPARATION.


A. Remove hardware and hardware accessories, plates, machined surfaces, and


similar items already installed that are not to be finished and that have not been


removed by others. If removal is impractical or impossible because of the size or


weight of the item, provide surface applied protection before surface preparation


and finishing. After completing finishing operations in each space or area,


reinstall items removed using workers skilled in the trades involved, unless


otherwise indicated.


B. De-wax and Cleaning: Before stripping and or applying finish or other surface


treatment, clean substrates of substances that could impair the bond of coatings.


First de-wax with Mohawk Wax Wash Liquid Preparatory Cleaner #M712-1907.


Remove oil and grease before cleaning. Schedule cleaning and finishing so dust


and other contaminants from the cleaning process will not fall on wet, newly


finished surfaces.


C. Surface Preparation: De-wax, clean and prepare surfaces to be finished


according to manufacturer's written instructions for each particular substrate


condition.


1. Bare wood: Bare wood that has been stripped of its finish for refinishing


must be cleaned immediately following the removal of the existing finish


by wiping the surface thoroughly with an odorless mineral spirits wash


using a rag or stripping pad attached to a sponge. Once the surface has


dried, the bare wood must be wiped clean of dust and airborne dirt.


2. Finished wood: Wood with an existing finish that is to be recoated must


first be de-waxed and then cleaned.


Ceremonial Courtroom


Daniel Patrick Moynihan U.S. Courthouse, New York, NY


Woodwork Restoration and Cleaning


D. Materials Preparation: Mix and prepare finish materials according to


manufacturer's written instructions.


1. Stir materials before application to produce a mixture of uniform density.


Stir as required during application. Do not stir surface film into material. If


necessary, remove surface film and strain materials before using.


2. Use only thinners approved by finish manufacturer and only within


recommended limits.


3.3 APPLICATION


A. Apply finish according to manufacturer's written instructions. Use applicators and


techniques best suited for substrate, type of material being applied, and room


conditions.


1. Do not finish over dirt, rust, scale, grease, moisture, scuffed surfaces, or


conditions detrimental to the formation of a durable finish film.


2. Provide finish coats that are compatible with sanding sealers used.


3. The completed finish must be uniform in appearance throughout and


match the approved samples. No thin, flat, sagging or inconsistent finished


surfaces will be accepted.


4. Comply with AWS Section 5 Premium Grade.


B. Finish Type A: Areas that require complete to bare wood Strip and Re-do.


1. De-wax, Chemical Strip and Wash with odorless mineral spirits to Bare Wood.


Overnight dry.


2. Through Sand with 120-Grit aluminum oxide sandpaper.


3. Stain and Toner as necessary to match Architects Sample.


4. Cross coat Seal and Sand 240 aluminum oxide sandpaper.


5. Topcoats with AWS System 12, Polyurethane, Water-Based.


6. Sand with 320 or 400 grit aluminum oxide sandpaper.


7. Hand rub with four (4) 0000 steel wool as necessary


C Finish Type B: Heavy Clean, scuff sand, touch-up and refinish.


1. De-wax.


2. Heavy sand with 240 aluminum oxide sandpaper.


3. Touch-up, Stain and Toner as required, including filling deep defects.


4. Topcoats with AWI System 12 Polyurethane, Water-Based.


5. Sand with 320 or 400 grit aluminum oxide sandpaper.


6. Hand rub with four (4) 0000 steel wool as necessary.


D Finish Type C: Good Clean and Repair and Touch-up as necessary.


1. Three times de-wax.


2. Touch-up as necessary.


3. Hand rub with four (4) 0000 steel wool as necessary.


Reference attached DPM-9C Images 1-11 for lacation of each finish level




Ceremonial Courtroom


Daniel Patrick Moynihan U.S. Courthouse, New York, NY


Woodwork Restoration and Cleaning


3.4 WOODWORK REPAIR AND PATCHING


A. General: Where existing woodwork or casework has damage, has been altered


or is scheduled to be altered under this Contract, repairs and alterations shall


be made in the shop or in the field, as applicable. Restoration shall include, but


is not limited to, the following items:


1. Remove abandoned fasteners and hardware.


2. Fill holes, dents, scratches and abrasion scars


3. Replace missing pieces with new pieces in matching wood species and


cut, with profile and finish to match Control Sample.


4. Repair veneer or replace veneer as require to match original.


5. Secure loose pieces, scratches and abrasion scars.


6. Secure loose joinery, such as mitered corners that have separated,


making joints tight again.


B. All repairs shall be made using like materials to match original.


1. For repairs 1/8" diameter or less, use wood wax filler, tinted to match


natural color of adjacent woodwork.


2. For repairs greater than 1/8", but less than 2" in diameter, use a wood


Dutchman or plug to fill hole.


3. For repairs greater than 2" in diameter, fill hole with a boat shaped patch,


matching the species grain and color of the wood.


3.5 CLEANING.


A. Cleanup: At the end of each workday, remove empty cans, rags, rubbish and


other discarded paint materials from Project site.


3.6 PROTECTION


A. Provide final protection and maintain conditions in a manner that ensure


woodwork is without damage or deterioration at time of Substantial Completion.


Ceremonial Courtroom


Daniel Patrick Moynihan U.S. Courthouse, New York, NY


Woodwork Restoration and Cleaning


B. Provide "Wet Paint" signs to protect newly finished surfaces. After completing


finishing operations, remove temporary protective wrappings provided by others


to protect their work.


C. After work of other trades is complete, touch-up and restore damaged or defaced


surfaces.


END OF SECTION

Files

Show all 13

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors