Cedar Rapids Flood Risk Management Project, Reach 1 McLoud Run Lower Reach Channel, Culverts and Levee
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912EK22B0003
- Agency
-
ENDIST Rock Island
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Cedar Rapids, Iowa, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks construction services for the Cedar Rapids Flood Risk Management Project, Reach 1 McLoud Run Lower Reach Channel, Culverts and Levee. The U.S. Army Corps of Engineers Engineering District Rock Island will procure demolition, excavation, grading, culvert installation, levee construction and landscaping services. The project has three components that can be bid individually or together: construction of a new channel, access road improvements and culvert installation, and construction of a new levee. Responses are due by March 22, 2022. The evaluation criteria will consider technical qualifications, past performance, and price.
This opportunity is set aside for total small business concerns. The primary NAICS code is 237110 for water and sewer line and related structures construction. The PSC codes include R499 for levee construction services and Z1AB for construction inspection services. The place of performance is Cedar Rapids, IA. The estimated value is between $10-25 million. The base channel work has a 365-day period of performance, while the optional culvert and levee components do not specify timelines. This project aims to reduce flood risks from McLoud Run through infrastructure upgrades.
Notice text
5 versions
Update #5 · Latest ·
Amendment 0004 - The reason for this amendment is to update the bid closing date/time from 17 March 2022 at 2:00pm CT to 22 March 2022 at 2:00pm CT.
_____________________________________________________________________________
Amendment 0003 - The reason for this amendment is to revise the schedule of prices, submittal register and following spec sections: 00 73 05, 01 11 00, 01 22 00, 01 57 19, 31 00 00, 31 23 19, 32 32 48 and 33 05 23. Drawing changes include: VOL 103 (C-105 and C-106), VOL 108 (GI005, GC101 and CF305), VOL 109 (GI004, BB103, BB613, CT101 and CT512) and VOL 1110 (CI101). Revisions are a result of contractor questions.
_____________________________________________________________________________
Amendment 0002 - The reason for this amendment is to update the bid closing date/time from 03 March 2022 at 2:00pm CT to 17 March 2022 at 2:00pm CT.
_____________________________________________________________________________
Amendment 0001 - The reason for this amendment is to update the contract completion days from 270 to 365 consecutive calendar days under Block 10 and 11 of the Standard Form 1442 to match FAR Clause 52.211-10 and extend the ProjNet Q&A period from 21 February 2022 at 2:00pm CT to 22 February 2022 at 2:00pm CT.
_____________________________________________________________________________
McLoud Run Lower Reach Channel (BASE): The work includes, but is not limited to: demolition; temporary traffic control; clearing, grubbing and stripping; temporary diversion of water; channel excavation, filling, and grading; riprap and bedding stone placement; trail construction; site restoration; and landscaping.
McLoud Run Lower Reach Culverts (OPTION A): The work includes, but is not limited to: access roadway improvements; site demolition; temporary traffic control; clearing, grubbing, and stripping; dewatering; temporary diversion of water; earthwork, excavation and fill; structural concrete construction; 96-inch trenchless steel pipe installation; riprap and bedding stone placement; site restoration; and landscaping.
McLoud Run Lower Reach Levee (OPTION B): The work includes, but is not limited to: site demolition; trench excavation; sheet pile installation; construction of levee embankment; toe drain installation; riprap and bedding stone placement; site restoration; and landscaping.
Update #4 ·
Amendment 0003 - The reason for this amendment is to revise the schedule of prices, submittal register and following spec sections: 00 73 05, 01 11 00, 01 22 00, 01 57 19, 31 00 00, 31 23 19, 32 32 48 and 33 05 23. Drawing changes include: VOL 103 (C-105 and C-106), VOL 108 (GI005, GC101 and CF305), VOL 109 (GI004, BB103, BB613, CT101 and CT512) and VOL 1110 (CI101). Revisions are a result of contractor questions.
_________________________________________________________________________________________________
Amendment 0002 - The reason for this amendment is to update the bid closing date/time from 03 March 2022 at 2:00pm CT to 17 March 2022 at 2:00pm CT.
________________________________________________________________________________________________________
Amendment 0001 - The reason for this amendment is to update the contract completion days from 270 to 365 consecutive calendar days under Block 10 and 11 of the Standard Form 1442 to match FAR Clause 52.211-10 and extend the ProjNet Q&A period from 21 February 2022 at 2:00pm CT to 22 February 2022 at 2:00pm CT.
________________________________________________________________________________________________________
McLoud Run Lower Reach Channel (BASE): The work includes, but is not limited to: demolition; temporary traffic control; clearing, grubbing and stripping; temporary diversion of water; channel excavation, filling, and grading; riprap and bedding stone placement; trail construction; site restoration; and landscaping.
McLoud Run Lower Reach Culverts (OPTION A): The work includes, but is not limited to: access roadway improvements; site demolition; temporary traffic control; clearing, grubbing, and stripping; dewatering; temporary diversion of water; earthwork, excavation and fill; structural concrete construction; 96-inch trenchless steel pipe installation; riprap and bedding stone placement; site restoration; and landscaping.
McLoud Run Lower Reach Levee (OPTION B): The work includes, but is not limited to: site demolition; trench excavation; sheet pile installation; construction of levee embankment; toe drain installation; riprap and bedding stone placement; site restoration; and landscaping.
Update #3 ·
Amendment 0002 - The reason for this amendment is to update the bid closing date/time from 03 March 2022 at 2:00pm CT to 17 March 2022 at 2:00pm CT.
________________________________________________________________________________________________________
Amendment 0001 - The reason for this amendment is to update the contract completion days from 270 to 365 consecutive calendar days under Block 10 and 11 of the Standard Form 1442 to match FAR Clause 52.211-10 and extend the ProjNet Q&A period from 21 February 2022 at 2:00pm CT to 22 February 2022 at 2:00pm CT.
________________________________________________________________________________________________________
McLoud Run Lower Reach Channel (BASE): The work includes, but is not limited to: demolition; temporary traffic control; clearing, grubbing and stripping; temporary diversion of water; channel excavation, filling, and grading; riprap and bedding stone placement; trail construction; site restoration; and landscaping.
McLoud Run Lower Reach Culverts (OPTION A): The work includes, but is not limited to: access roadway improvements; site demolition; temporary traffic control; clearing, grubbing, and stripping; dewatering; temporary diversion of water; earthwork, excavation and fill; structural concrete construction; 96-inch trenchless steel pipe installation; riprap and bedding stone placement; site restoration; and landscaping.
McLoud Run Lower Reach Levee (OPTION B): The work includes, but is not limited to: site demolition; trench excavation; sheet pile installation; construction of levee embankment; toe drain installation; riprap and bedding stone placement; site restoration; and landscaping.
Update #2 ·
Amendment 0001 - The reason for this amendment is to update the contract completion days from 270 to 365 consecutive calendar days under Block 10 and 11 of the Standard Form 1442 to match FAR Clause 52.211-10 and extend the ProjNet Q&A period from 21 February 2022 at 2:00pm CT to 22 February 2022 at 2:00pm CT.
________________________________________________________________________________________________________
McLoud Run Lower Reach Channel (BASE): The work includes, but is not limited to: demolition; temporary traffic control; clearing, grubbing and stripping; temporary diversion of water; channel excavation, filling, and grading; riprap and bedding stone placement; trail construction; site restoration; and landscaping.
McLoud Run Lower Reach Culverts (OPTION A): The work includes, but is not limited to: access roadway improvements; site demolition; temporary traffic control; clearing, grubbing, and stripping; dewatering; temporary diversion of water; earthwork, excavation and fill; structural concrete construction; 96-inch trenchless steel pipe installation; riprap and bedding stone placement; site restoration; and landscaping.
McLoud Run Lower Reach Levee (OPTION B): The work includes, but is not limited to: site demolition; trench excavation; sheet pile installation; construction of levee embankment; toe drain installation; riprap and bedding stone placement; site restoration; and landscaping.
Update #1 ·
McLoud Run Lower Reach Channel (BASE): The work includes, but is not limited to: demolition; temporary traffic control; clearing, grubbing and stripping; temporary diversion of water; channel excavation, filling, and grading; riprap and bedding stone placement; trail construction; site restoration; and landscaping.
McLoud Run Lower Reach Culverts (OPTION A): The work includes, but is not limited to: access roadway improvements; site demolition; temporary traffic control; clearing, grubbing, and stripping; dewatering; temporary diversion of water; earthwork, excavation and fill; structural concrete construction; 96-inch trenchless steel pipe installation; riprap and bedding stone placement; site restoration; and landscaping.
McLoud Run Lower Reach Levee (OPTION B): The work includes, but is not limited to: site demolition; trench excavation; sheet pile installation; construction of levee embankment; toe drain installation; riprap and bedding stone placement; site restoration; and landscaping.
Files
Show all 15
Notice history
| Notice | Type | Posted |
|---|---|---|
| Cedar Rapids Flood Risk Management Project, Reach 1 McLoud Run Lower Reach Channel, Culverts and Levee | Award Notice | |
| This notice | Solicitation | |
| Cedar Rapids Flood Risk Management Project, Reach 1 McLoud Run Lower Reach Channel, Culverts and Levee | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Upper mississippi river restoration (UMRR) pool 12 floodplain forest stage one (1) - habitat rehabilitation and enhancement project (HREP) | ENDIST Rock Island | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity