A22 - PLAN_SET_AMND-2022-02-28-VOL108_MCLD_LWR_LEVEE.pdf

PDF 4 MB Posted

Attached to
Cedar Rapids Flood Risk Management Project, Reach 1 McLoud Run Lower Reach Channel, Culverts and Levee
Solicitation number
W912EK22B0003
Issued by

About this file

This document package includes plans and specifications for a federal construction contract opportunity with the U.S. Army Corps of Engineers. The project is the Cedar Rapids Flood Risk Management Project, Reach 1 McLoud Run Lower Reach Channel, Culverts and Levee in Cedar Rapids, Iowa. The project has three components that can be bid individually or together: the BASE includes demolition and construction of a new channel for McLoud Run; OPTION A includes access road improvements and installation of 96-inch culverts; and OPTION B includes construction of a new levee. The plans provide construction details such as site plans, sections, and notes. Bids for the work are due by December 2022 under solicitation number W912EK22B0003 issued by the USACE Rock Island District. The specifications require services such as clearing, excavation, concrete work, culvert installation, erosion control, and restoration.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A N

S I

D

W

E K

B

D E

C E

M B

E R

W X

X X

X X

-X X

-X -X

X

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

D R

IV

E

R O

C K

I S

L A

N D

IL

F

IL

E N

A M

E

P R

O J E

C T

C O

D E

C

D A

R R

A P

ID

S

IA

F L

O O

D R

IS

K

M A

N A

G E

M E

N T

P R

O J E

T

VOL108

B

C E

D R

P D

IO

W A

R

IV

E R

B A

S

IN

C

E D

A R

R

IV

E R

SOLICITATIONDS: PD: AEC_pdf.pltcfg9:39:24 AM 2/23/2022

...\...\10306440\...\B5CEDRPD1811_VOL108_GI005.dgn

GI005

F E

B

M

N D

R E

M O

V E

G E

N E

R A

L S

H E

E T

N O

T E

A1

BORROW AREA MAP

SCALE: 1" = 500'

A

IK

E N

R

A

IK

E N

A J U

D D

C E

D A

R L

A K

E N

O R

T H

S H

O R

E A

N D

L E

V E

E C

O N

S T

R U

C T

IO

N

C E

D A

R L

A K

E N

O R

T H

S H

O R

E A

N D

L E

V E

E C

O N

S T

R U

C T

IO

N

B O

R R

O W

A R

E A

M A

P

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

NORTH

PLAN

B

C E

D R

P D

V

O L

G I0

.D G

N

0 200' 400'

CONTRACT

14. CONTRACTOR SHALL ONLY USE AREAS D, E AND F FOR THIS

1 1

HH

HH

H H

H H

CO

CO

CO

CO

500+00

108+00

109+00

110+00

111+00

112+00

113+00

114+00

115+00

116+00

117+00

118+00

119+00

120+00

B C

E D

R P

D V

O L

G

C .D

G N

0+0

1+00

2+00

3+00

4+

4+ .82

.2

0+00

0+71.46

0+0

1+0

2+0

3+0

4+0

5+

6+00

7+00

8+00

9+0

10+

11+

12+

13+

.9

.9

1+

1+ .45

HY

D

HY

D

H Y

D

0+0

1+0

2+0

3+0

4+0

5+0

6+0

7+0

0+0

1+0

2+0

2+5 0.5

8+0

9+0

10+

HY

D

D

S

S

S

S

S

D

S

D

D

D

D

S

S

S

S

S

S

.7

.4

F P

A N

S I

D

W

E K

B

D E

C E

M B

E R

W X

X X

X X

-X X

-X -X

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

D R

IV

E

R O

C K

I S

L A

N D

IL

F

IL

E N

A M

E

P R

O J E

C T

C O

D A

R R

A P

ID

S

IA

F L

O O

D R

IS

K

M A

N A

G E

M E

N T

P R

O J E

C E

D R

P D

A

R

IV

E R

B A

S

IN

C

E D

A R

R

IV

E R

SOLICITATIONDS: PD: AEC_pdf.pltcfg9:53:19 AM 2/23/2022

...\...\10306440\...\B5CEDRPD1811_VOL108_GC101.dgn

GC101

F E

B

N D

R

E V

IS

E

D G

E N

E R

A L

S H

E E

T N

O T

A

IK

E N

H

D R

A J U

D D

H

R K

L

IM

IT

S

S

IT

E

A C

C E

S S

A N

D S

T A

G

IN

G

P

D

IE

R K

IN

G

H

A1

SITE ACCESS AND STAGING PLAN

SCALE: 1" = 100'

M .K

U R

E K

H

(NOT IN THIS CONTRACT)

CEDAR LAKE PUMP STATION

VOLUME 111

WORK LIMITS

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

SCHIMBERG

COMPANY

(NOT IN THIS CONTRACT)

SHAVER ROAD RECONSTRUCTION

VOL105

PROTECTION ALIGNMENT

REACH 1 FLOOD

CLOSED TO PUBLIC

CEDAR LAKE TRAIL

UNION PACIFIC RAILROAD

ALLIANT

ENERGY

SHAVER ROAD ACCESS

(NOT IN THIS CONTRACT)

MCLOUD RUN CHANNEL PROJECT

VOL103

112+00

113+00

114+00

115+00

116+00

117+00

118+00

119+00

120+00

121+00

UNION PACIFIC RAILROAD

100' 200'0

NORTH

PLAN

TRUE N

SHEET KEYNOTES

BERM.

METHOD WITH CONTRACTING OFFICER PRIOR TO REMOVING EXISTING

UNTIL FLOODWALL CONSTRUCTION IS COMPLETE. REVIEW PROPOSED

EMBANKMENT FILL, HESCO BARRIERS OR OTHER EQUIVALENT METHOD

PROTECTION TO THE EXISTING TOP OF BERM ELEVATION USING LEVEE

REMOVAL OF A BERM SEGMENT IS REQUIRED, PROVIDE TEMPORARY FLOOD

RUN: MINIMIZE REMOVAL OF EXISTING BERMS TO THE DEGREE POSSIBLE. IF

TEMPORARY FLOOD PROTECTION ALONG THE LOWER REACH OF MCLOUD 4.

PERSONNEL AT ALL TIMES DURING CONTRUCTION.

WAYS AND LOADING DOCKS FOR ALLIANT ENERGY VEHICLES AND

MAINTAIN CONTINUOUS ACCESS TO PARKING AREAS, ENTRANCES, ACCESS 3.

LIMITS BY OTHERS PRIOR TO CONSTRUCTION.

ALL ALLIANT MATERIALS AND EQUIPMENT WILL BE REMOVED WITHIN WORK 2.

CONSTRUCT IMPROVEMENTS FROM SOUTH SIDE OF CHANNEL.1.

TRAFFIC CONTROL FOR THIS CONTRACT.

REFER TO VOLUME 103 PLANS FOR WORK LIMIT LOCATIONS AND FOR OVERALL 7.

FENCE.

FENCING ALONG WORK LIMITS TO BE INSTALLED PRIOR TO REMOVING EXISTING

REMOVED, PROVIDE EQUIVALENT TEMPORARY FENCING ALONG WORK LIMITS.

MAINTAIN FENCING ALONG PRIVATE PROPERTY BOUNDARIES. IF FENCING IS 6.

ROUTES.

RESTORE PAVEMENT AND VEGETATION TO PRE-PROJECT CONDITION ALONG ACCESS 5.

METHODS, AND SUBCONTRACTOR COMMUNICATION PLAN.

TYPE, SPEED, AND CLEARANCE RESTRICTIONS, UTILITY POLE PROTECTION

OFFICER AND UTILITY OWNER'S REPRESENTATIVE; PLAN WILL INCLUDE VEHICLE

OVERHEAD UTILITY LINE PROTECTION PLAN FOR APPROVAL BY THE CONTRACTING

FOR ACCESS ROUTES WITHIN 40 FEET OF OVERHEAD UTILITY LINES SUBMIT AN 4.

CONTROL REQUIREMENTS.

SEE OVERALL DETOUR AND TRAFFIC CONTROL PLAN (GC106) FOR TRAFFIC 3.

AREAS.

NO PARKING OF VEHICLES ALONG PUBLIC ROADWAYS OR WITHIN PUBLIC PARKING 2.

LIMITS AND HAUL ROUTES.

CONSTRUCTION VEHICLES AND PERSONNEL SHALL STAY WITHIN DESIGNATED WORK 1.

GENERAL SHEET NOTES

M

IN

M

IN

A N

S I

D

W

E K

B

D E

C E

M B

E R

W X

X X

X X

-X X

-X -X

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

D R

IV

E

R O

C K

I S

L A

N D

IL

F

IL

E N

A M

E

P R

O J E

C T

C O

D A

R R

A P

ID

S

IA

F L

O O

D R

IS

K

M A

N A

G E

M E

N T

P R

O J E

C E

D R

P D

A

R

IV

E R

B A

S

IN

C

E D

A R

R

IV

E R

SOLICITATION

CLEAR AND GRUB / REMOVE TOP SOIL / WORK LIMITS

APPLY 6" TOPSOIL AND SEED TO LIMITS OF DISTURBANCEFISHING TRAIL RAMP

MCLOUD RUN

TOPSOIL AND SEED

APPLY 6"

APPLY 6" TOPSOIL AND SEED TO LIMITS OF DISTURBANCESTATION ACCESS ROAD

CEDAR LAKE PUMP

CEDAR LAKE PUMP STATION SERVICE YARD, SEE SHEET CLPS CG101

CLEAR AND GRUB / REMOVE TOP SOIL

APPLY 6" TOP SOIL AND SEED

CF305

F E

B

N D

R E

V

IS

E G

E N

E R

A L

S H

E E

T N

O T

P

D

IE

R

K

IN

G

H D

R

R E

A C

H

L E

V E

E

T Y

P

IC

A L

L E

V E

E S

E C

T

IO

N S

SCALE: HORIZONTAL 1" = 10', VERTICAL 1" = 10'

A1

DS: PD: AEC_pdf.pltcfg9:56:27 AM 2/23/2022

...\...\10306440\...\B5CEDRPD1811_VOL108_CF305.dgn

M Q

U A

L Y

H

D R

A J U

D D

H

D R

M R

E D

IN

G

T O

N H

D R

TYPICAL LEVEE SECTION - CEDAR LAKE PUMP STATION (STA 124+08.33 TO STA 126+50)

SCALE: HORIZONTAL 1" = 10', VERTICAL 1" = 10'

E1

TYPICAL LEVEE SECTION - CEDAR LAKE PUMP STATION (STA 121+00 TO STA 124+08.33)

GRADED DITCH.

UP THE SIDE SLOPES OF THE

THE BOTTOM AND EXTENDING 18"

PRODUCT TYPE 2.C OR 2.D ALONG

PROVIDE IADOT ROLLED CONTROL

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

0 10 20 30 40 50 60 70 80 90 100 110-10-20-30-40-50-60-70-80-90-100-110

PROJECTED LEVEE PRISM (SEE NOTE 4).

CONSTRUCTION OF GAS LINE OUTSIDE OF

OVERBUILD LEVEE BY 4 FEET TO ALLOW

LEVEE EMBANKMENT FILL

TOP OF SHEETPILE 4 FEET INTO

NOTE 4

PRISM (BEYOND) SEE

PROJECTED LEVEE

FLOOD SIDEPROTECTED SIDE

3.2

3.2

WALL SEE NOTE 5

SHEET PILE CUTOFF SEE NOTE 7

BOTTOM OF EXCAVATION 718.0'

LIMITS OF PROJECTED LEVEE PRISM

REMOVE UNSATISFACTORY SOILS TO

GAS

GAS

GAS

GAS GAS

GAS

INSTALLED BY OTHERS

OPTIC LINE TO BE

10" GAS MAIN AND FIBER

NOTE 8

SEE

GRADE

DESIGN

PROJECTED LEVEE PRISM

SOILS TO LIMITS OF

REMOVE UNSATISFACTORY

EMBANKMENT

CONSTRUCT LEVEE

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170-10-20-30-40-50-60-70-80-90-100-110

FLOOD MITIGATION

ALIGNMENT CONTROL LINE

3.2

STATION SHORING (SEE NOTE 3)

POTENTIAL CEDAR LAKE PUMP

STATION SHORING (SEE NOTE 3)

POTENTIAL CEDAR LAKE PUMP

FLOOD SIDEPROTECTED SIDE

CEDAR LAKE PUMP STATION

(SEE NOTE 1)

EXCAVATE UNSATISFACTORY SOILS

STATION EXCAVATION SEE NOTE 2

POTENTIAL CEDAR LAKE PUMP

SEE NOTE 5 ON THIS SHEET

ON SHEET ST301 FOR LOCATION AND

SHEETPILE CUTOFF WALL SEE DETAIL

DESIGN GRADE SEE NOTE 8

SEE NOTE 7

BOTTOM OF EXCAVATION 714.0'

STATIONEXCAVATION SEE NOTE 3

POTENTIAL CEDAR LAKE PUMP

OF PROJECTED LEVEE PRISM

REMOVE UNSATISFACTORY SOILS TO LIMITS

FOR ILLUSTRATION PURPOSES (SEE NOTE 2)

EXCAVATION SLOPE WILL VARY - SHOWN AT 2H:1V

B

C E

D R

P D

V

O L

C F

.D

G N

10' 20'0

10' 20'0

GENERAL SHEET NOTES

CONSTRUCTION STAGING WITH MIDAMERICAN GAS AND ALLIANT.

OPTIC IN THIS AREA UNTIL RELOCATED. COORDINATE LEVEE

SPECIFICATIONS. CONTRACTOR SHALL PROTECT EXISTING GAS AND FIBER

NO STEEPER THAN 4H:1V AND MATERIAL SHALL BE BENCHED PER THE

FIBER OPTIC RELOCATION. TRANSITIONS TO LEVEE FULL HEIGHT SHALL BE

TO ALLOW FOR MIDAMERICAN GAS MAIN RELOCATION AND FOR ALLIANT

LEVEE CONSTRUCTION FROM STA 120+50 TO STA 124+50 SHALL BE STAGED 9.

SEQUENCE AND OVERBUILD TO ACCOMMODATE SETTLEMENT.

SEE SHEET CF501 FOR INFORMATION RELATED TO CONSTRUCTION 8.

VERIFIED.

AND ACROSS THE WIDTH OF THE CROSS SECTION, AND MUST BE FIELD

BOTTOM OF EXCAVATION ELEVATION WILL VARY ALONG THE ALIGNMENT 7.

CF105 FOR ADDITIONAL INFORMATION.

TOP OF LEVEE ELEVATION VARIES BETWEEN 123+40 AND 126+46. SEE SHEET 6.

SEE SHEET CS602 FOR SHEET PILE CUTOFF ELEVATION CONTROL TABLE.5.

PRISM.

BEDDING TO BE INSTALLED BY OTHERS OUTSIDE OF PROJECTED LEVEE

AMERICA ON GAS LINE INSTALLATION. ALL PIPES, JOINTS, AND PIPE

SECTIONS BEFORE 122+25 AND AFTER 126+50. COORDINATE WITH MID

THE PROJECT LEVEE PRISM SHOWN IN DETAIL E1 REPRESENTS CROSS 4.

AND ALL UNSATISFACTORY SOILS ARE REMOVED.

MONITOR EXCAVATIONS IN THIS AREA TO CONFIRM EXCAVATIONS OVERLAP

CONSTRUCTION OF THE PUMP STATION. CONTRACTING OFFICER TO

MAY OVERLAP WITH UNSATISFACTORY SOIL REMOVAL COMPLETED FOR

UNSATISFACTORY SOIL EXCAVATION COMPLETED TO CONSTRUCT LEVEE

EXCAVATION OR SHORING TO BE DETERMINED BY CONTRACTOR.

DETAIL A1 ARE FOR ILLUSTRATION PURPOSES ONLY. METHODS USED FOR

CEDAR LAKE PUMP STATION EXCAVATION AND SHORING LIMITS SHOWN ON 3.

ADJUSTED FOR EXCAVATION STABILITY PURPOSES.

EXCAVATION AND LOCATION ALONG THE ALIGNMENT AND WILL NEED TO BE

DEWATERING. THIS SLOPE WILL LIKELY VARY DEPENDING ON DEPTH OF

SLOPE OF EXCAVATION WILL VARY DEPENDING ON SOIL CONDITIONS AFTER 2.

MATERIALS INTO EXCAVATIONS.

OFFICER APPROVAL IS REQUIRED PRIOR TO PLACEMENT OF FILL

OBSERVATION OF SOILS ENCOUNTERED IN THE FIELD. CONTRACTING

REMOVAL DEPTHS WILL BE ADJUSTED IN THE FIELD BASED ON

LIMITS THAT ARE SHOWN ON THIS PLAN SHEET ARE APPROXIMATE. SOIL

REMOVE UNSATISFACTORY SOILS. THE UNSATISFACTORY SOIL EXCAVATION 1.

1.5%

VOL118A

PAVING BY OTHERS

E3

CF505

BELOW UNSATISFACTORY SOIL REMOVAL SURACE)

(EXCAVATE THROUGH CLAY BLANKET AND 1 FOOT

CONSTRUCT LANDSIDE TOE DRAIN

BELOW UNSATISFACTORY SOIL REMOVAL SURFACE)

(EXCAVATE THROUGH CLAY BLANKET AND 1 FOOT

CONSTRUCT LANDSIDE TOE DRAIN

File details come from the government source that posted it. Updated .