This document package contains plans and specifications for a federal solicitation seeking construction services. The solicitation involves construction work on the Cedar Rapids Flood Risk Management Project Reach 1 in Iowa, including the McLoud Run Lower Reach Channel, culverts, and levee. The channel work includes demolition, clearing, excavation, grading, riprap placement, trail construction, and landscaping. Culvert work comprises access road improvements, demolition, dewatering, earthwork, structural concrete, trenchless steel pipe installation, and site restoration. Levee work involves demolition, sheeting installation, embankment construction, toe drains, riprap, and landscaping. The solicitation was issued by the U.S. Army Corps of Engineers Rock Island District and includes base work on the channel as well as optional tasks for the culverts and levee. The response due date and award timing are not specified in the document package, which provides construction plans and specifications for the opportunity.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A N

S I

D

W

E K

B

D E

C E

M B

E R

W X

X X

X X

-X X

-X -X

X

R O

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

D R

IV

E

R O

C K

I S

L A

N D

IL

F

IL

E N

A M

E

P R

O J E

C T

C O

D E

C

D A

R R

A P

ID

S

IA

F L

O O

D R

IS

K

M A

N A

G E

M E

N T

P R

O J E

T

B

C E

D R

P D

IO

W A

R

IV

E R

B A

S

IN

C

E D

A R

R

IV

E R

SOLICITATION

VOL109

P

D

IE

R K

IN

G

H

D R

DS: PD: AEC_pdf.pltcfg9:12:15 AM 2/23/2022

...\...\10306440\...\B5CEDRPD1811_VOL109_GI004.dgn

GI004

F E

B

M

N D

A

D D

S H

E E

T B

B

T O

S

A

IK

E N

H

D R

R

A

IK

E N

H

VOL109

P

D

IE

R K

IN

G

H

D R

S H

E E

T I

N D

A C

H

A N

D C

E D

A R

L A

K E

P U

M P

S T

A T

IO

N

A J U

H

R

B

C E

D R

P D

V

O L

G I0

.D G

N

THOSE SHEETS WITH NAMES SHOWN ARE INCLUDED IN THIS VOLUME.

OVERALL SHEET LIST IS FROM ORIGINAL REACH 1 PLAN SET. ONLY

ADDITIONAL SHEETS ARE LISTED WHICH ARE NOT IN THIS VOLUME.

NOTE:

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

D

D

D

CO

CO

CO

CO

57+ 29.

58+

59+

CR-17-3

CR-17-5

CR-18-18C

CR-18-17C

CR-18-8

CR-18-19C

CR-18-20C

CR-19-58

CR-19-59

CR-19-73

CR-18-22C

CR-18-9

CR-18-10

CR-18-21C

CR-18-23C

CR-18-56C

CR-18-24C

CR-18-55C

CR-18-25C

CR-18-55C-1

A N

S I

D

W

E K

B

D E

C E

M B

E R

W X

X X

X X

-X X

-X -X

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

D R

IV

E

R O

C K

I S

L A

N D

IL

F

IL

E N

A M

E

P R

O J E

C T

C O

D A

R R

A P

ID

S

IA

F L

O O

D R

IS

K

M A

N A

G E

M E

N T

P R

O J E

C E

D R

P D

A

R

IV

E R

B A

S

IN

C

E D

A R

R

IV

E R

SOLICITATION

VOL109

P

D

IE

R K

IN

G

H

D R

BB103

F E

B

N D

A

D D

U P

R R

-R W

-1 A

N D

U P

R R

-R

-2

E

A C

H

L E

V

H

A V

E N

S H

D R

R A

IK

E

N

H

D R

S M

A T

Y C

H U

K H

A1

SCALE: 1" = 50'

DS: PD: AEC_pdf.pltcfg11:40:26 AM 2/23/2022

...\...\10306440\...\B5CEDRPD1811_VOL109_BB103.dgn

BORING LOCATION PLAN

B O

R

IN

G L

O C

A T

IO

N

P L

A N

122+

123+00

124+00

125+00

126+00

127+00

128+00

1+

.75

CR-17-4

UPRR-RW-1

UPRR-RW-2

CR-18-13

CR-19-72

CR-18-12

CR-18-11

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

B

C E

D R

P D

V

O L

B B

.D

G N

50' 100'0

NORTH

PLAN

M A

T C

H L

IN

E

A

/B B

MATCH LINE A1/BB104

MATCH LINE A1/BB102

S I

D

W

E K

B

D E

C E

M B

E R

W X

X X

X X

-X X

-X -X

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

D R

IV

E

R O

C K

I S

L A

N D

IL

F

IL

E N

A M

E

P R

O J E

C T

C O

D A

R R

A P

ID

S

IA

F L

O O

D R

IS

K

M A

N A

G E

M E

N T

P R

O J E

C E

D R

P D

A

R

IV

E R

B A

S

IN

C

E D

A R

R

IV

E R

SOLICITATION

VOL109

P

D

IE

R K

IN

G

H

D R

BB613

F E

B

N D

N

E W

S H

E E

T I

N S

A C

H

L E

V E

E

B H

A V

E N

S

H

D R

R A

IK

H

R

S M

A T

Y C

H U

K

H

D R

B O

R

IN

G L

O G

S

BORING LOGS

SCALE: 1" = 5'

D

IA

G R

A M

DS: PD: AEC_pdf.pltcfg10:21:13 AM 2/23/2022

...\...\10306440\...\B5CEDRPD1811_VOL109_BB613.dgn

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

E

L E

V A

T

IO

N I

N F

E E

T N

.A .V

.D

E L

E V

A T

IO

N

I N

F E

E T

N .A

.V .D

Nf

D10D30D60

PLLL

Qp

Nf D10D30D60

WPLLL Qp

CR-19-41

W

04 APR 2019

(8)

SANDY LEAN CLAY (CL)

SANDY LEAN CLAY (CL)

GROUND EL 730.22 FT.

(4)

CR-19-40

FILL - SANDY LEAN CLAY

(5)

5" TOPSOIL

CLAYEY SAND (SC)

5" ASPHALT

SAND WITH CLAY (SP-SC)

(6)

POORLY GRADED SAND WITH CLAY (SP-SC)

(8)

(5)

CLAYEY SAND (SC)

(17)

SPT=18-50/5"

LIMESTONE

AUGER REFUSAL AT 24.4 FT.

04 APR 2019

GROUND EL 729.824 FT.

FILL - LEAN CLAY WITH ORGANICS

(4)

POORLY GRADED SAND (SP)

(6)

(1)

SANDY LEAN CLAY (CL)

(10)

LIMESTONE

SILTY SAND (SM)

(10)

(27)

AUGER REFUSAL AT 36.5 FT.

SPT=3-32-50/6"

SPT=50/0"

(4)

W.L. 8 FT. 04/04/19

W.L. 8' 04/08/19

W.L. 9' 04/08/19

SANDY LEAN CLAY (CL)

SANDY LEAN CLAY (CL)

B

C E

D R

P D

V

O L

B B

.D

G N

0 5' 10'

S I

D

W

E K

B

D E

C E

M B

E R

W X

X X

X X

-X X

-X -X

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

D R

IV

E

R O

C K

I S

L A

N D

IL

F

IL

E N

A M

E

P R

O J E

C T

C O

D A

R R

A P

ID

S

IA

F L

O O

D R

IS

K

M A

N A

G E

M E

N T

P R

O J E

C E

D R

P D

A

R

IV

E R

B A

S

IN

C

E D

A R

R

IV

E R

SOLICITATION

VOL109

P

D

IE

R K

IN

G

H

D R

/1

/2

122'-0"±

100'-10 3/4 "21'-1 1/4 "±

28'-0"

TYP

8'-0"2

12'-6"

88'-1"

7'-0"

4'-0"

19'-7 3/8 "±

17'-6 7/8 "±

122'-0"±

3 EQUAL SPA.

1'-0"

E M

B E

D M

E N

T

M

IN

12'-0"15'-0"

94'-2 1/2"±

12'-0" 15'-0" 40'-2 1/2±"

DS: PD: AEC_pdf.pltcfg9:17:03 AM 2/23/2022

...\...\10306440\...\B5CEDRPD1811_VOL109_CT101.dgn

CT101

F E

B

N D

D

E T

A

IL

A

U P

D A

T

E

A C

H

L E

V E

E

C1

PLAN

D7

SCALE: 1:15

SECTION

K

R U

S Z

C Z

A K

H

D R

D

W

IS

N

IE

S K

I, H

D R

A1

ELEVATION

G E

N E

R A

L A

R R

A N

G E

M E

N T

U P

R R

C U

L V

E R

T

M C

L O

U D

R U

N R

E T

A

IN

IN

G

W A

L L

M

C O

X

H D

R

SCALE: 1"=15'-0"

SCALE: 1"=15'-0"

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

STEEL PIPE (SSP)

96" DIA. SMOOTH

CL 96" DIA. SSP

CL 96" DIA. SSP

(TO REMAIN)

ELLIPTICAL CULVERT

CL EXISTING 8.0x11.4

FLOW

A1

D7

TYP.

HEADWALL

CIP CONC.

APRON

CIP CONC.

C E

D A

R R

A P

ID

S

I N

D L

E A

D

T O

B E

V E

R L

Y

C E

D A

R R

A P

ID

S

I N

D L

E A

D

T O

O T

IS

HEADWALL

EXISTING

HEADWALL

EXISTING

(TO REMAIN) TYP.

ELLIPTICAL CULVERT

EXISTING 8.0x11.4

HEADWALL TYP.

CIP CONC.

WINGWALL TYP.

CIP CONC.

APRON

CIP CONC.

DETAIL B

SEE B9/CT507

MAURI FOODS TRACK

CL EXISTING AB

STEEL PIPE (SSP)

96" DIA. SMOOTH

PACIFIC TRACK

CL EXISTING UNION

SHAFT TYP.

36" DIA. DRILLED

WINGWALL

CIP CONC.

TYP.

SOLDIER PILE

W27x161 STEEL

PANEL TYP.

PRECAST CONC.

PER VOLUME 103

CHANNEL GRADING

PILE WALL

DRILLED SOLDIER

DETAIL A

SEE B8/CT507

%2

APPROX. 730.5'

SEE NOTE 4

PROTECT IN PLACE)

(LOCATE AND

GAS LINE

APPROX. 730.0'

EXISTING GRADE

TO WALL

LOW POINT ADJACENT

APPROX. 730.0'

EXISTING GRADE

SEE DETAIL C1/CF502

5' FROM FACE OF WALL

SPACED 4' OC,

8" Ø PIPE BOLLARD

TYP

T Y

P

APPROX. 730.25'

GROUNDLINE ELEV.

CR-18-12

UPRR RW-2

UPRR RW-1

WALL. SEE NOTE 2. TYP.

CIP CONC. BUTTRESS

ELEV. = 716.05

PROPOSED INVERT

MAURI FOODS TRACK

CL EXISTING AB

ELEV. = 729.74

LOW B/RAIL

WSE = 728.6

EGL = 731.0

VEL = 13.4 fps

50WSE

100EGL

INVERT ELEV. = 715.95 ±

EXISTING / PROPOSED

ELEV. = 716.05 + / -

EXISTING INVERT

HEADWALL

EXISTING HEADWALL

EXISTING

ELEV. = 731.96 +/-

EXISTING HEADWALL

ELEV. = 727.85 ±

EXISTING HEADWALL

APRON TYP.

CIP CONC.

PIPE BEDDING TYP.

WELL COMPACTED

1'-6" LAYER OF

ELEV. 731

TOP OF WALL

ELEV. 716.2

CHANNEL

IN FRONT OF WALL

GROUND LINE

SHAFT TYP.

36" DIA. DRILLED

PACIFIC TRACK

CL EXISTING UNION

SOLDIER PILE TYP.

W27x161 STEEL

SLOPE: -0.0820%

CULVERTS

(4) EXISTING 8.0x11.4 ELLIPTICAL

STEEL PIPE (SSP) AND

(4) 122 LF 96" DIA. SMOOTH

ELEV. 714 (FIELD VERIFY)

APPROX. BEDROCK

HP-40 TYP.

HANDRAIL POST

HANDRAIL POST HP-26

CIP CONC. WINGWALL

HANDRAIL POST HP-27

TYP.

CIP CONC. HEADWALL

BOTTOM OF STEEL SOLDIER PILE

BOTTOM OF DRILLED SHAFT =

IN

T

O

B E

D R

O C

K

CONTRACTOR TO FIELD VERIFY

OF RETAINING WALL.

AT A LOCATION APPROX 56' NORTH

TOP OF PIPE ELEV IS APPROX 712.7±

10" HIGH PRESSURE GAS MAIN.

(TO REMAIN)

ELLIPTICAL CULVERT

CL EXISTING 8.0x11.4

CL 96" DIA. SSP

CL 96" DIA. SSP

WSE = 728.6

EGL = 731.0

VEL = 13.4 fps

CIP CONC. APRON

HEADWALL

EXISTING

MATCH EXISTING, TYP.

CIP CONC. HEADWALL

50WSE

100EGL

WINGWALL

CIP CONC. WINGWALL

CIP CONC.

B

C E

D R

P D

V

O L

C T

.D

G N

NORTH

PLAN

T R

U E N

15' 30'0

15' 30'0

GENERAL SHEET NOTES

15' 30'0

CONSTRUCTION.

(319-298-5150) TO CALL FOR STAND-BY AT LEAST 48 HOURS PRIOR TO

MID-AMERICA PRIOR TO CONSTRUCTION. CONTACT BRETT GIOMIO

CONTRACTOR SHALL COORDINATE LOCATION OF GAS LINE WITH 4.

3. SEE SHEET CF502 FOR RIPRAP REQUIREMENTS.

2. BUTTRESS WALLS SHALL BE CONSTRUCTED PRIOR TO REMOVALS.

SEE SHEET CF118 FOR UPRR CULVERT CROSSING LOCATION.1.

S I

D

W

E K

B

D E

C E

M B

E R

W X

X X

X X

-X X

-X -X

C K

I S

L A

N D

D

IS

T R

IC

T

R O

C K

I S

L A

N D

D R

IV

E

R O

C K

I S

L A

N D

IL

F

IL

E N

A M

E

P R

O J E

C T

C O

D A

R R

A P

ID

S

IA

F L

O O

D R

IS

K

M A

N A

G E

M E

N T

P R

O J E

C E

D R

P D

A

R

IV

E R

B A

S

IN

C

E D

A R

R

IV

E R

SOLICITATION

VOL109

P

D

IE

R K

IN

G

H

D R

EXCAVATION

SAMPLE

SHORING

ZONE A

5ft-6in

15ft-6in

BASE OF RAIL

PROFILE

GROUND

EXCAVATION PERMITTED

NO EXCAVATION

15ft-0in ft -6 in

15ft-0in

TOP OF RAIL

PLACED WITHIN THESE LIMITS

OR OTHER OBSTRUCTIONS SHALL BE

NO CONSTRUCTION ACTIVITIES

DS: PD: AEC_pdf.pltcfg9:25:03 AM 2/28/2022

...\...\10306440\...\B5CEDRPD1811_VOL109_CT512.dgn

CT512

F E

B

N D

R E

V

IS

E D

D T

L A

N

O T

E S

A N

D G

E N

S H

T N

O T

E S

E

A C

H

L E

V E

E

A

M C

C U

N E

H

D R

U P

R R

C U

L V

E

N S

T R

U C

T

IO

N C

L E

A R

A N

C E

D E

T A

IL

S

A5

MINIMUM CONSTRUCTION CLEARANCE

TRACK PROTECTION SHORING ZONES

SCALE: NTSSCALE: NTS

M

M C

K

IB

B

IN

H

D R

D

W

IS

N

IE

S K

I, H

D R

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

STATE OF IOWA.

STAMPED BY A PROFESSIONAL ENGINEER REGISTERED IN THE

DESIGN CALCULATIONS. PLANS AND CALCULATIONS MUST BE

SHORING PLANS MUST BE ACCOMPANIED BY A COPY OF THE

FOR EXCAVATIONS WHICH ENCROACH INTO ZONE A OR B,

GUIDELINES FOR TEMPORARY SHORING.

DESIGN OF SHORING SHALL COMPLY WITH UNION PACIFIC'S

THE TEMPORARY SHORING SYSTEM PER THE APPROVED PLANS.

PROTECTION SHORING PROPOSED. THE CONTRACTOR SHALL INSTALL

INDICATING THE NATURE AND EXTENT OF THE TRACK

SUBMIT FOR APPROVAL BY THE RAILROAD, DETAILED PLANS

PRIOR TO COMMENCING ANY WORK, THE CONTRACTOR SHALL

ALL DIMENSIONS ARE MEASURED PERPENDICULAR TO ` TRACK.

B

C E

D R

P D

V

O L

C T

.D

G N

DISRUPT RAILROAD OPERATIONS.

CONSTRUCTION CLEARANCE ENVELOPE" AS THEY WOULD OTHERWISE

CONSTRUCTION ACTIVITIES ARE NOT ALLOWED WITHIN THE "MINIMUM 10.

PHONE NUMBER: 1-800-336-9193

UPRR FACILITIES BY CALLING THE UPRR "CALL BEFORE YOU DIG" (CYBD)

THE RAILROAD PROPERTY THE CONTRACTOR SHALL LOCATE AND PROTECT

CALL BEFORE YOU DIG. PRIOR TO EXCAVATION, DISRUPTING, OR WORKING ON 9.

/pdf_up_util_aban.pdf https://www.up.com/cs/groups/public/@uprr/@realestate/documents/up_pdf_nativedocs

REVIEW. SEE THE UPRR ABANDONMENT GUIDELINES.

CONTRACTOR MUST SUBMIT THEIR PLAN TO THE RAILROAD FOR PRIOR

WHEN ABANDONING UTILITIES (LEAVE IN PLACE OR REMOVE), THE 8.

/pdf_up_track_ground_monitor.pdf https://www.up.com/cs/groups/public/@uprr/@realestate/documents/up_pdf_nativedocs

DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE RAILROAD.

MONITORING AND RESTORING THE TRACK PROFILE AS NECESSARY. ALL

CONTRACTOR WILL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH

AS WELL AS MONITORING FOR 14 DAYS AFTER THE INSTALLATION. THE

NECESSARY BY THE RAILROAD, CONTINUOUS MONITORING MAY BE REQUIRED

BEFORE BEGINNING CONSTRUCTION AND AT PROJECT CLOSING. AS DEEMED

THE ELEVATION OF THE EXISTING TOP-OF-RAIL PROFILE SHALL BE VERIFIED

FOR RAILROAD REVIEW. SEE SECTION 3 IN THE LINK BELOW.

THE CONTRACTOR MUST SUBMIT A TRACK AND GROUND MONITORING PLAN 7.

PROCEED UNTIL SUCH APPROVAL IS OBTAINED.

BE SUBMITTED TO THE RAILROAD FOR APPROVAL AND NO WORK SHALL

WORK PLANS AND DESCRIPTION OF THE EQUIPEMENT TO BE USED SHALL F.

MATERIAL AHEAD/ABOVE THE PIPE.

OTHERWISE FREE FLOW MATERIAL LEADING TO OVEREXCAVATING

THE FACE OF THE CUTTING EDGE SHALL BE ARRANGED TO RESTRICT AN E.

SUCH VOIDS.

METHODS APPROVED BY THE RAILROAD, SHALL BE EMPLOYED TO FILL

DIAMETER OF THE PIPE (PLUS COATING) BY 1 INCH. GROUTING OR OTHER

THE OVER-CUT BY THE CUTTING HEAD SHALL NOT EXCEED THE OUTSIDE D.

ENCOUNTERED AND NEEDS TO BE REMOVED.

FROM THE WITHING THE PIPE IN THE EVEN AN OBSTRUCTION IS

THE AUGER AND CUTTING HEAD ARRANGEMENT SHALL BE REMOVABLE C.

AHEAD OF THE PIPE WHILE WITHIN ZONE A AND UNDER THE TRACKS.

FROM LEADING THE PIPE SO THAT NO UNSUPPORTED EXCAVATION IS

ARRANGEMENTS OR DEVICES THAT WILL POSITIVELY PREVENT THE AUGER

THE FRONT OF THE PIPE SHALL BE PROVIDED WITH MECHANICAL B.

SIDE.

COMPLETELY PASSED UNDER ALL TRACK AND THROUGH ZONE A ON EACH

BASIS WITHOUT STOPPAGE UNTIL THE LEADING EDGE OF THE PIPE HAS

THE BORING OPERATION SHALL BE PROGRESSED ON A CONTINUOUS (24/7) A.

WAY.

CONSTRUCTION REQUIREMENTS WHILE WITHIN THE RAILROAD'S RIGHT-OF-

THE CONTRACTOR SHALL ADHERE TO THE FOLLOWING CULVERT AND PIPELINE 6.

SECURE ALL EQUIPMENT.

MUST CLEAR THE AREA WITHIN 25 FEET OF THE TRACK CENTERLINE AND

CENTERLINE WHEN A TRAIN PASSES THE WORK SITE AND ALL PERSONNEL

RAILROAD REQUIREMENTS DO NOT ALLOW WORK WITHIN 50 FEET OF TRACK 5.

https://www.uprr.com/reus/attachments/roadxing/demolition_guidelines.pdf

BE FOUND AT:

COMPLIANCE WITH THE CURRENT RAILROAD'S DEMOLITION GUIDELINES CAN

THAT MAY IMPACT THE RAILROAD'S TRACKS OR OPERATIONS SHALL BE IN

ALL DEMOLITIONS/REMOVALS WITHIN THE RAILROAD'S RIGHT-OF-WAY AND/OR 4.

APPROVAL.

MEASURES TO PROTECT UNATTENDED EXCAVATIONS TO THE RAILROAD FOR

THE CONTRACTOR MUST SUBMIT AND PROVIDE SUFFICIENT SAFETY 3.

shoring.pdf

@operationsspecs/@specifications/documents/up_pdf_nativedocs/pdf_up_str_temp-https://www.up.com/cs/groups/public/@uprr/@customers/@industraldevelopment/

TEMPORARY SHORING. TEMPORARY SHORING GUIDELINES CAN BE FOUND AT:

DESIGNED AND CONSTRUCTED PER CURRENT RAILROAD GUIDELINES FOR

OPERATIONS AND/OR SUPPORTS THE RAILROAD'S EMBANKMENT SHALL BE

WITHIN RAILROAD RIGHT-OF-WAY OR THAT MAY IMPACT THE RAILROAD'S

REGARDLESS OF UNDERLYING LAND OWNERSHIP, ALL SHORING SYSTEMS 2.

SEDIMENT CONROL AND HAVE THE METHOD APPROVED BY THE RAILROAD.

THE CONTRACTOR MUST SUBMIT A PROPOSED METHOD OF EROSION AND 1.

GENERAL SHEET NOTES

C

L

SHORING ZONE NOTES:

S H

O R

IN

G

Z O

N E

A

S H

O R

IN

G

Z O

N E

B

S H

O R

IN

G

Z O

N E

A

NO EXCAVATION ZONE A

Z O

N E

B

TRACK

1. OSHA STANDARD LOADS

SHORING DESIGNED FOR:

SLOPING CUTS ARE ALLOWED

2. OSHA STANDARD LOADS

1. RAILROAD LIVE LOAD SURCHARGE

SHORING DESIGNED FOR:

NO SLOPING CUTS ALLOWED

C L

OF TRACKC

L

File details come from the government source that posted it. Updated .