California Road Construction MATOC

Closed Pre-Solicitation Posted

This opportunity was awarded. See its 8 award notices in the notice history.

Solicitation number
6982AF23R000006
Agency
Federal Highway Administration Department of Transportation
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
Manchester, California 95459, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Central Federal Lands Highway Division of the Federal Highway Administration intends to award multiple indefinite delivery indefinite quantity contracts for road and bridge construction projects throughout California. The agency will evaluate proposals using lowest price technically acceptable criteria and make up to eight awards for a one year base period and two optional two year extensions not to exceed a total value of $60 million. Proposals are due by July 28, 2023 with the solicitation to be issued in early August. Evaluation will consider the offerors' responses to two sample task orders also released with the solicitation.

There is no set-aside designation for this opportunity. The NAICS and PSC codes applicable to road and bridge construction will likely apply. The sample task orders provided estimate individual projects values between $2-5 million focusing on replacement of bridges damaged in recent wildfires. Details provided include removal quantities, material amounts, prefabricated bridge dimensions, guardrail footage and anticipated construction schedules through 2024.

Notice text

THIS IS NOT AN INVITIATION FOR BID, PLANS AND SPECIFICATIONS ARE NOT AVAILBLE

THE TENTATIVE ADVERTISEMENT DATE IS EARLY AUGUST, 2023. THIS PROJECT WILL BE ADVERTISED AS A SMALL BUSINESS SET-ASIDE.

Project Details: The Central Federal Lands Highway Division (CFL) of the Federal Highway Administration anticipates awarding a Multiple Award Task Order Contract (MATOC) for road and bridge construction for the state of California. The government anticipates individual task orders ranging from $500,000 to $5,000,000. The request for proposals or invitation for bids will include all contractual requirements for which the work is being requested. Two (2) Task Order Request for Proposals (RFP) will be issued simultaneously with the MATOC Request for Proposal. The two (2) Task Orders (seed projects) will consist of: CA ERFO FS SEQUI 2021-02(2) and CA ERFO FS ELDOR 2021-02(4). Offerors will be required to submit a price proposal for the first two task orders as well as qualifications for the base MATOC RFP. The proposals for the first two (2) task orders will be used to evaluate price for the base MATOC lowest price technically acceptable (LPTA) awards. The scope of the task orders may include, but are not limited to bridge/roadway value engineering, fabrication and/or delivery of individual bridge elements or temporary works, bridge demolition, construction of temporary and permanent single and multi-span bridges and foundations, mobilization, contractor sampling and testing, earthwork, dewatering, walls, asphalt and concrete surfacing, drainage improvements, traffic control, installation of traffic signals and signs, roadway reconstruction, rehabilitation, MSE wall construction, asphalt concrete paving, trail construction, roadway excavation, rock embankment or embankment construction and other work incidental to road and bridge construction projects. This is competitive LPTA procurement and evaluation factors for award will be fully stated in the RFP. The government may award up to a maximum of eight contracts resulting from this solicitation to the responsible offerors whose offers conform to the solicitation while using the LPTA methodology. Each contract awarded will consist of one base year and options to extend the contract for two additional two-year periods. The shared capacity of the MATOC will have a maximum not-to-exceed five year total of $60 million.

Details of the two task order seed projects are found below:

PROJECT NUMBER: CA ERFO FS SEQUI 2021-02(2)

PROJECT NAME: POWDERHORN BRIDGE

PROJECT DESCRIPTION:

The CA ERFO FS SEQUI 2021-02(2) Powderhorn Bridge project is located in the Sequoia National Forest in southeastern California. The project is proposing to replace the existing bridge which was completely damaged by the Windy fire late in 2021 and is proposed to be fully replaced with a prefabricated steel bridge. Prior to fire damage, the bridge was a one lane, two-way traffic single span structure with no skew. It had an overall bridge length of 50 feet, roadway width (curb to curb) of 14.0 ft, and deck width (outside to outside) of 15.0 ft.

PRINCIPAL WORK ITEMS:

Approximate quantities for major work items:

  • 1 (LPSM) of Removal of Existing Structures and Obstructions
  • 300 CUYD of Excavation
  • 20 CUYD of Riprap
  • 190 TON of Roadway Aggregate
  • 80 TON of Asphalt Pavement
  • 16-ft x 46-ft of Prefabricated Steel Bridge
  • 170 LNFT of Drilled Shafts, 24-inch diameter
  • 100 LNFT of Guardrail, including terminals

ANTICIPATED SCHEDULE:

It is anticipated this project will be advertised in August 2023, proposals due in September 2023, and awarded in October 2023. Construction will run from January 2024 through October 2024.

ESTIMATES COST RANGE:

The estimated price range is between $2,000,000 to 5,000,000.

PROJECT NUMBER: CA ERFO FS ELDOR 2021-02(4)

PROJECT NAME:  ALDER CREEK BRIDGE

PROJECT DESCRIPTION:

This project is in the Eldorado National Forest in eastern-central California. The terrain is rolling and mountainous with elevations ranging up to 5600 ft.  The purpose of the project is to replace the Alder Creek Bridge over Alder Creek within Eldorado National Forest in El Dorado County, California. The bridge was completely damaged by the Caldor fire in the summer of 2021 and is proposed to be fully replaced with a prefabricated steel bridge

The existing bridge (Structure 050356000001022) on Route 11N46, approximately 30 miles east from Placerville, CA, was constructed in 1966, as reported in the inspection report. Prior to fire damage, the bridge was a one lane, two-way traffic single span structure with no skew. It had an overall bridge length of 50 feet, roadway width (curb to curb) of 14.0 ft, and deck width (outside to outside) of 15.0 ft. 

PRINCIPAL WORK ITEMS:

Approximate quantities for major work items:

  • 1 (LPSM) of Removal of Existing Structures and Obstructions
  • 150 CUYD of Excavation     
  • 260 CUYD of Riprap
  • 180 TON of Roadway Aggregate
  • 100 TON of Asphalt Pavement
  • 16-ft x 82-ft of Prefabricated Steel Bridge
  • 200 LNFT of Drilled Shafts, 24-inch diameter
  • 250 LNFT of Guardrail, including terminals

ANTICIPATED SCHEDULE:

It is anticipated this project will be advertised in August 2023, proposals due in September 2023, and awarded in October 2023. Construction will run from January 2024 through October 2024.

ESTIMATES COST RANGE:

The estimated price range is between $2,000,000 to 5,000,000.

Notice history

And 5 more award notices.

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity