Caissons, DryDock#1 at Portsmouth Naval Shipyard
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- N4008520R0158
- Agency
-
Naval Facilities Engineering Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 336611 Ship Building and Repairing
- Place of performance
- Kittery Me Usa
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice seeks the construction of two graving dock caissons for Dry Dock #1 at the Portsmouth Naval Shipyard in Kittery, Maine. The Department of the Navy, Naval Facilities Engineering Command will procure the caissons as part of the MILCON P-381 Multi Mission Dry Dock #1 project. Caissons must be constructed in accordance with Military Standard MIL-STD-1625D(SH) and Unified Facilities Criteria UFC-4-213-10, with steel fabrication, mechanical, and electrical systems installation. Construction will primarily occur offsite, with delivery and testing at the shipyard by March 2021. Interested parties must submit capabilities packages demonstrating experience on two relevant projects between $10-100 million by October 5, 2020.
The solicitation has no set-aside designation. The work involves NAICS codes 237990 and 238990, with an estimated value between $25-50 million. Construction will deliver two caissons by March 2021 to interface with newly constructed dry dock seats at the Portsmouth Naval Shipyard.
Notice text
The proposed project provides two graving dock caissons for the Portsmouth Naval Shipyard, located in Kittery, Maine. The caissons will be a separate contract funded as part of MILCON P-381 Multi Mission Dry Dock #1. The caissons will be for Dry Dock #1N and Dry Dock #1W. Caisson construction includes steel fabrication, installation of mechanical and electrical systems, and a full testing program of the caisson and its interface with the newly constructed dry dock seats. Construction will be primarily offsite with delivery to the shipyard and final testing at the dry docks.
The caissons will be constructed to meet Military Standard (MIL-STD-1625D(SH)), Safety Certification Program for Dry-docking Facilities and Shipbuilding Ways for U.S. Navy Ships and Unified Facilities Criteria (UFC-4-213-10). The magnitude of construction is between $25,000,000 and $50,000,000. The anticipated award of this contract is March 2021.
Files
| File | Type | Posted |
|---|---|---|
| Project Matrix 20R0158.xlsx | XLSX spreadsheet | |
| Project Information Form 20R0158.docx | DOCX document | |
| SourcesSoughtNotice_N4008520R0102.docx | DOCX document | |
| Contractor Information Form 20R0158.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Caissons, DryDock#1 at Portsmouth Naval Shipyard | Award Notice | |
| Caissons, DryDock#1 at Portsmouth Naval Shipyard | Solicitation | |
| Caissons, DryDock#1 at Portsmouth Naval Shipyard | Pre-Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Building 143 Concrete Scale Pad Expansion and Dock Leveler Replacement | Naval Sea Systems Command | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity