Project Matrix 20R0158.xlsx
XLSX spreadsheet 10 KB Posted
- Attached to
- Caissons, DryDock#1 at Portsmouth Naval Shipyard
- Solicitation number
- N4008520R0158
About this file
This document provides details on a federal contract opportunity for caisson construction at the Portsmouth Naval Shipyard in Kittery, Maine. The solicitation is for the construction of two graving dock caissons for Dry Dock #1N and Dry Dock #1W as part of the MILCON P-381 Multi Mission Dry Dock #1 project. Caisson construction will include steel fabrication, installation of mechanical and electrical systems, and full testing of the interface with the newly constructed dry dock seats. Most construction is to occur offsite with delivery and final testing at the shipyard. Caissons must meet Military Standard MIL-STD-1625D(SH) and Unified Facilities Criteria UFC-4-213-10. The magnitude of construction costs is estimated between $25-50 million. The anticipated contract award date is March 2021. The solicitation is issued by the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Project Information Form 20R0158.docx | DOCX document | |
| SourcesSoughtNotice_N4008520R0102.docx | DOCX document | |
| Contractor Information Form 20R0158.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Size | Scope | Complexity | ||||||||||
| # | Project Title (should match title listed on questionnaire) | Project Location (city, state) | Project Completed | |||||||||
| (month/year) | Was your firm Prime or Sub? | DB or DBB | DoD / Fed (Y/N) | Final construction cost of $10M or > | Caisson construction or naval architecture construction including but not limited to: caisson for graving dock, marine transportation, floating dry dock, lock closure gates, etc. | a) Construction of a steel caisson gate for graving dry docks or similar steel fabrication of naval architecture, including mechanical and electrical outfitting. | b) Experience with Ship Work Breakdown Systems (SWBS) specifications | c) Coordination and timely commissioning of industrial pump systems and electrical controls. | ||||
| 0 | Example Project - Suzanna Bridge Repairs | Wapatoolie, IL | May-16 | Prime | DBB | N | $14M | Bridge | No | Yes | Yes | |
| 1 | ||||||||||||
| 2 | ||||||||||||
| 3 | ||||||||||||
| 4 | ||||||||||||
| 5 |
File details come from the government source that posted it. Updated .