Caco - maintenance pierson house
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 140P4324Q0041
- Agency
- Northeast Region National Park Service, Department of the Interior
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- 204 Marconi Maintenance Road Wellfleet, Massachusetts, United States
- Points of contact
-
- Janice Boscoe janice_boscoe@contractor.nps.gov
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Interior's National Park Service Northeast Region is seeking proposals for a construction project at the Cape Cod National Seashore's Pierson House in Wellfleet, Massachusetts. The work includes providing new vinyl plank flooring, cleaning and painting interior walls and ceilings, bathroom renovations, furnace room modifications, and replacing entry doors. The solicitation will be issued on or about May 29, 2024 and posted to the SAM.gov website. A site visit is highly encouraged, and offerors must have a Unique Entity Identifier (UEI) number, be registered in the System for Award Management (SAM), and have completed their Online Representations and Certifications.
This contract opportunity is set aside 100% for small businesses under NAICS code 236220 (Commercial and Institutional Building Construction). The estimated project value is between $100,000 and $250,000. The pre-solicitation notice also includes three option items: roof replacement, exterior shingle cleaning and staining, and demolition of the existing shed, porch, and walkway. The proposal due date is June 13, 2024.
Notice text
CACO - MAINTENANCE PIERSON HOUSE - Work will consist of providing new 22 mil vinyl plank flooring. Rooms that are scheduled to receive new floors are shown on the contract drawings; 2. Clean, patch, spot prime and paint interior walls and ceilings. Existing unpainted pine paneling do not receive paint; 3.At bathroom #2, disconnect plumbing, remove plumbing, cap plumbing (behind wall) and remove prefabricated shower enclosure; 4. Where shower is removed, patch the adjoining walls and floor; 5. At bathroom #2, provide two (2) coats of oil based polyurethane with Satin finish to the existing pine paneling; 6 At furnace room, provide new wall with vented door to separate the furnace room from the means of egress; 7. Relocate existing furnace room ceiling light to allow new wall installation; 8. Remove existing trim, existing entry door and frame at main entrance and utility room; and 9. Provide two new 32 inch x 76 inch, two lite, pre-hung, steel entry doors.
Attachments
| File | Type | Posted |
|---|---|---|
| 140P4324Q004_CACO_Pre_Solicitation_Notice_1.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Caco - maintenance pierson house | Award Notice | |
| Caco - maintenance pierson house | Solicitation | |
| Caco - maintenance pierson house | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity