Butcher SENW Coal Bed Natural Gas Infrastructure R

Closed Solicitation Posted

Solicitation number
140L6222R0016
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
562910 Remediation Services
PSC
F011 Natural Resources/Conservation- Surface Mining Reclamation (Non-Construction)
Place of performance
1425 Fort St. Buffalo, Wyoming 82834, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

The Bureau of Land Management, Buffalo Field Office request to furnish labor, equipment, supplies, and materials consisting of unclassified excavate, cut and cap pipe of various sizes exposed to the surface; remove two metal buildings (16ft-L x 15ft-W x 10ft-H), intact.

Provide all supervision, personnel, labor, materials, tools, equipment, maintenance and repairs, services, and all other facilities and incidentals required for the execution and completion of the work as specified. Provide all topsoil stripping and stockpiling, excavating, hauling, backfilling, grading, seeding, surface restoration, and associated work, as specified, and as required to complete all components of the work and all associated erosion control structures, complete, in place, and accepted by the Contracting Officer.

Update #2 ·

The Bureau of Land Management, Buffalo Field Office request to furnish labor, equipment, supplies, and materials to reclaim one (1) off-channel pit and remove associated production equipment from the federal lease. Work consists of unclassified excavation to re-contour the off-channel pit area to approximate natural contours; application of pure live seed and dry mulch; installation of erosion control measures throughout the reclaimed area; excavate, cut, and cap pipe of various sizes exposed to the surface; remove two metal buildings (16ft-L x 15ft-W x 10ft-H), intact.

Site Visit: Thursday, August 18, 2022- 0900 Local Mountain Time
Location: BLM-WY Buffalo Field Office, 1425 Fort St., Buffalo, WY 82834
RSVP: Ted Hamersma, thamersm@blm.gov, 307-684-1153

Update #1 ·

The Bureau of Land Management, Buffalo Field Office request to furnish labor, equipment, supplies, and materials to reclaim one (1) off-channel pit and remove associated production equipment from the federal lease. Work consists of unclassified excavation to re-contour the off-channel pit area to approximate natural contours; application of pure live seed and dry mulch; installation of erosion control measures throughout the reclaimed area; excavate, cut, and cap pipe of various sizes exposed to the surface; remove two metal buildings (16ft-L x 15ft-W x 10ft-H), intact.

Files

File Type Posted
SOW_Butcher_Infrastructure__0002.pdf PDF
Sol_140L6222R0016_Amd_0002.pdf PDF
Attachment_2-_Bid_Schedule_0002.xls XLS spreadsheet
Sol_140L6222R0016_Amd_0001.pdf PDF
Attachment_2-_Bid_Schedule.xls XLS spreadsheet
Attachment_1-_Contract_Drawings__Exhibits_and_Maps.pdf PDF
SOW-_140L6222R0016.pdf PDF
Sol_140L6222R0016.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors