Attachment_1-_Contract_Drawings__Exhibits_and_Maps.pdf
PDF 13 MB Posted
- Solicitation number
- 140L6222R0016
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW_Butcher_Infrastructure__0002.pdf | ||
| Sol_140L6222R0016_Amd_0002.pdf | ||
| Attachment_2-_Bid_Schedule_0002.xls | XLS spreadsheet | |
| Sol_140L6222R0016_Amd_0001.pdf | ||
| SOW-_140L6222R0016.pdf | ||
| Sol_140L6222R0016.pdf | ||
| Attachment_2-_Bid_Schedule.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Drawings, Exhibits, and Maps Butcher 32 SENW (CBNG) Infrastructure Removal and Reservoir Reclamation
CONTRACT DRAWINGS, EXHIBITS, AND MAPS
Figure 1: Project Map
Figure 2: Site Photos
1. Butcher 32 SENW Off-Channel Pit to dewater, recountour and reclaim.
2. Butcher 32 SENW Off-Channel Pit and Perimeter Fence to salvage and move to Butcher’s yard.
3. Butcher 32 SENW Off-Channel Pit – Buried Valve Sets - to remain buried in place as is.
4. Butcher 32 SENW Off-Channel Pit Outfall Tire Tank to be salvaged and moved to Butcher’s yard
5. Butcher Header Building-POD 3 to remain in place after all surface pipe is to be cut, capped & buried
3-feet below ground surface. Production equipment is to be salvaged and moved to Butcher’s yard.
6. Butcher Header Building-POD 3; 2 1/2” steel pipe to cut, cap & bury 3-feet below ground surface.
7. Butcher Header Building-POD 3; 5” steel pipe to cut, cap & bury3-feet below ground surface.
8. Butcher Header Building-POD 3; Two 5” steel pipe to cut, cap & bury 3-feet below ground surface.
9. Butcher Header Building-POD 3; 7” steel pipe to cut, cap & bury 3-feet below ground surface.
10. Butcher Header Building-POD 3 & blowdown valve set; Two 5” steel pipe to cut, cap & bury 3-feet below ground surface.
11. Butcher Header Building-POD 3; Electrical panel and fencing to salvage and move to Butcher’s yard.
Electrical conduit to cut and bury 3-feet below ground surface.
12. Butcher Header Building-POD 3; 5” polypipe stubout to cut & bury 3-feet below ground surface.
13. Butcher Header Building 4 to move to Butcher’s yard intact.
14. Butcher Header Building 4; all surface pipe is to cut, cap & buried 3-feet below ground surface.
Production equipment is to salvage and move to Butcher’s yard.
15. Butcher Header Building 4; Six 5” steel pipe to cut, cap & bury 3-feet below ground surface.
16. Butcher Header Building 4; 2-1/2” steel pipe to cut, cap & bury 3-feet below ground surface.
17. Butcher Header Boulding 4; 12” steel pipe to cut, cap & bury 3-feet below ground surface.
18. Drip valve, seller and blowdown pipe. Two 2-1/2” steel pipe to cut, cap and bury 3-feet below surface.
ARV seller and steel cage to salvage and move to Butcher’s yard.
19. Dual Air release valve (ARV); Two 2-1/2” steel pipe to be cut, capped and buried 3-feet below ground surface. Steel cage to be salvaged and moved to Butcher’s yard.
20. 5” polypipe stubout to be cut & bury 3-feet below ground surface.
21. Air release valve (ARV); 2-1/2” steel pipe to be cut, capped and buried 3-feet below ground surface.
Figure 3. Butcher’s Salvage Yard located T56N/R74W/Section 33 NWNW
(UTM: 438480/4960223)
Reclamation Plan
I. Reclamation Plan Requirements See Figure 1. Butcher 32 SESW Off-Channel Pit Site Map for site specific details described below.
Butcher 32 SESW Off-Channel Pit located T586N/R764W/Section 32 SENW ( UTM:437398/4959977)
-Drain approximately 555,000 gallons of water stored within the pit. A water quality analysis has been completed indicating the water is suitable for livestock consumption. The water is to be moved to the existing reservoir located T56N, R74W, Section 32 NWNE.
-Remove 1,800 linear feet of 4 strand wire fence around the perimeter of the off-channel pit. All Fence posts and wire will be salvaged and moved to the surface owner’s storage yard.
-Remove one tire tank outfall and siphon tube; salvaged and moved to the surface owner’s storage yard.
-Salvage topsoil from the embankment area of the pit to a depth of no less than 12-inches and stockpile at the outer toe of the pit’s embankment; approximately 2,835 cubic-yards.
-Recontour the off-channel pit by moving the embankment into the pool area; approximately 43,920 cubic-yards
-Once topsoil has been respreads across the disturbed areas, the soil is to be disced and prepped for seed bed, crimped with straw and seeded with the seed mix listed below. Straw and seed are to be from a weed free certified source.
-Drill seed at a depth not to exceed 0.5 inches. If broadcast seeding, double the rate of application.
-Apply straw mulch at 100 pounds per acre.
-Apply seed at the specified rate. See the BLM approved seed mix is listed in the reclamation plan.
CBNG production equipment located T55N/R74W/Section 5 NENW (UTM:437223/4958748)
-The 16ft-L x 15ft-W x 10ft-H metal building will remain intact at its current location and the production facilities within it removed and exposed pipes cut & caped 3-feet below the surface. The building can be moved intact to complete removal of the production equipment but will be placed back in its original location once dirt work is completed. Cut and cap three 5-inch, one 2.5-inch, and one 7-inch metal pipes.
-A minimum of 6-inches of topsoil will be savaged and segregated for all excavation and redistributed across the disturbance area following backfilling. Apply seed at the recommended rate.
-The dual valve header’s two 5-inch metal pipes will be cut, caped and buried 3-feet below ground surface; the metal cage salvaged and moved to Butcher’s salvage yard; see Figure 6.
-The electrical panel and metal fencing will be removed and four 3-inch poly, electrical conduit cut and buried 3-feet below ground surface.
-The 5-inch polypipe stub-pit pipe will be cut and buried 3-feet below ground surface.
CBNG production equipment located T56N/R74W/Section 32 SWNE (UTM:437862/4960351)
-A minimum of 6-inches of topsoil will be savaged and segregated for all excavation and redistributed across the disturbance area following backfilling. Apply seed at the recommended rate.
-The dual air-release valve, two 3-inch metal pipe will be cut, capped, and buried 3-feet below ground surface;
the metal cage salvaged and moved to Butcher’s salvage yard.
-The drip valve, one 3-inch polypipe will be cut and capped and the 36-inch culvert seller salvaged and moved to Butcher’s salvage yard.
CBNG production equipment located T56N/R74W/Section 32 NWNE (UTM:437728/4959776)
--A minimum of 6-inches of topsoil will be savaged and segregated for all excavation and redistributed across the disturbance area following backfilling. Apply seed at the recommended rate.
-The 16ft-L x 15ft-W x 10ft-H metal building will be savaged and moved intact to Butcher’s salvage yard and the production facilities within it salvaged and moved to Butcher’s salvage yard. All exposed pipes will be cut, caped and buried 3-feet below ground surface including; seven 5-inch, one 2.5-inch, and one 12-inch metal pipes.
CBNG production equipment located T56N/R74W/Section 32 NENE (UTM:438099/4960353)
-A minimum of 6-inches of topsoil will be savaged and segregated for all excavation and redistributed across the disturbance area following backfilling. Apply seed at the recommended rate.
-The air-release valve, one 3-inch metal pipe will be cut, capped and buried 3-feet below ground surface; the metal cage will be salvaged and moved to Butcher’s salvage yard.
-The 5-inch polypipe stub-pit pipe will be cut and buried 3-feet below ground surface.
BLM Seed Mix
Loamy Ecological Site Seed Mix Species % in Mix Broadcast
Seeding Lbs
PLS
Drill Seeding Lbs PLS*
Western wheatgrass (Pascopyrum smithii) Or Thickspike wheatgrass (Elymus lanceolatus ssp.
lanceolatus) 24 6.0 3.0 Bluebunch wheatgrass (Pseudoroegneria spicata ssp.
spicata) 9.6 2.4 1.2 Green needlegrass (Nassella viridula) 24 6.0 3.0 Slender wheatgrass (Elymus trachycaulus ssp.
trachycaulus) 16 4.0 2.0 Blue grama (Bouteloua gracilis) 8 2.0 1.0 Prairie coneflower (Ratibida columnifera) 4.8 1.2 0.6 White or purple prairie clover (Dalea candidum, purpurea) 4.8 1.2 0.6 Rocky Mountain beeplant (Cleome serrulata) 4.8 1.2 0.6 Fourwing saltbush (Atriplex canescens) Or Winterfat (Krascheninnikovia lanata) 4 1.0 0.5 Totals 100% 25.0 lbs/acre 12.5 lbs/acre *PLS = pure live seed, Northern Plains adapted species
Figure 5. Butcher 32 SESW Off-Channel Pit Design Diagram
Figure 6. Butcher 32 SENW Area Map