Attachment_2-_Bid_Schedule_0002.xls
XLS spreadsheet 33 KB Posted
- Solicitation number
- 140L6222R0016
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW_Butcher_Infrastructure__0002.pdf | ||
| Sol_140L6222R0016_Amd_0002.pdf | ||
| Sol_140L6222R0016_Amd_0001.pdf | ||
| Attachment_1-_Contract_Drawings__Exhibits_and_Maps.pdf | ||
| SOW-_140L6222R0016.pdf | ||
| Sol_140L6222R0016.pdf | ||
| Attachment_2-_Bid_Schedule.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHED UPDATE
| BID SCHEDULE | |||||
| Butcher 32 SENW Off-Channel Pit and CBNG Infrastructure Removal and Reclamation (BFO 2021) | |||||
| Item No. | Description | Quantity | Unit | Unit Price | Total Amount |
| 1 | Topsoil removal/re-dristubution (6-inches) | 0.5 | Acres | ||
| 2 | Seeding | 0.5 | Acres | ||
| 3 | Salvage/Disposal (Header Buildings/Cut, Cap & Bury Pipe, Etc. | 6.0 | LI | ||
| 4 | Mobilization | 1.0 | LI | ||
| CBYD = Cubic Yards, LI = Line Items | Total Bid | ||||
| PREPARED BY: | |||||
| DATE: | |||||
| REVIEWED BY: | |||||
| DATE: |
File details come from the government source that posted it. Updated .