Building 668 Asphalt Shingle Roof Replacement - Devens, MA
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W15QKN-26-Q-A119
- Agency
-
ACC Picatinny
Army Contracting Command, Department of Defense
- Responses due
- Set-aside
- Competitive 8(a)
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Devens, Massachusetts 01434, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Army Contracting Command-New Jersey seeks replacement of the third-story asphalt shingle roof on Building 668 at U.S. Army Garrison Devens in Ayer, Massachusetts, with proposals due June 26, 2026. The procurement is an SBA 8(a) competitive set-aside restricted to 8(a) participants serviced by the SBA Massachusetts District Office.
Place of performance is Ayer, Massachusetts. The scope requires complete removal and replacement of existing asphalt shingle roofing with new GAF ELK Timberline Natural Shadow or GAF ELK Sovereign Series shingles meeting ASTM D 3018 and D 3462 standards, weighing not less than 210 pounds per 100 square feet for standard shingles or 290 pounds for architectural shingles, with Class A fire resistance (UL 790) and wind resistance (UL 997) ratings and 20+ years fungus resistance. Work includes removal and reinstallation of existing lightning protection per NFPA 780 and UL 96/96A standards, roof fall protection system designed by a Registered Professional Engineer, and repairs to deteriorated roof deck areas discovered during removal. The contractor must submit a Quality Control Plan within 10 calendar days of Notice to Proceed and provide a 5-year workmanship warranty with 72-hour repair response; the manufacturer must provide a 30-year warranty running directly to the Government. Environmental protection per Fort Devens protocols applies, including dust control, waste management, and hazardous material handling. Performance must begin within 10 calendar days of award and complete within 120 calendar days of Notice to Proceed.
The Government intends award as a single firm-fixed-price contract to the lowest-priced technically acceptable offeror. Performance and payment bonds are required, with an offer guarantee (bid bond) equal to 20 percent of bid price or $3,000,000, whichever is less. All offers must remain valid for 120 calendar days. Offerors must register in SAM, provide valid Certificate of Insurance per FAR 52.228-5, submit a signed SF 1442, and provide a detailed Construction Cost Breakdown Form in Microsoft Excel with functioning formulas. Amendment 0001, issued June 17, posted vendor question responses and a revised Addendum to FAR Clause 52.212-4. The NAICS code is 236220, Commercial and Institutional Building Construction, with a size standard of $45,000,000. Davis-Bacon prevailing wage rates apply.
Notice text
2 versions
Update #2 · Latest ·
AMENDMENT 00001 - THE PURPOSE OF THIS AMENDMENT 0001 TO THE SOLICITATION W15QKN-26-Q-A119 IS TO POST THE ANSWERS TO THE QUESTIONS RECEIVED FROM VENDORS AND TO INCLUDE A REVISED ADDENDUM TO 52.212-4.
THE PURPOSE OF THIS REQUIREMENT IS TO REPAIR BY REPLACEMENT THE 3RD STORY ROOF OF THE U.S. ARMY GARRISON RFTA BUILDING 668. THE EXISTING 3RD STORY ROOF OF BUILDING 668 CONSISTS OF EXISTING ASPHALT SHINGLE ROOFING WITH UNKNOWN UNDERLAYMENT SUPPORTED BY A LOW-PITCH PLYWOOD DECK SHEETING. THE BUILT-UP ROOFING IS TO BE REMOVED AND REPLACED WITH AN ASPHALT SHINGLE ROOF. EXISTING LIGHTNING PROTECTION IS TO BE REMOVED AND REINSTALLED UPON COMPLETION OF THE NEW ROOFING SYSTEM. PLEASE ALL ATTACHMENTS TO THIS SOLICITATION FOR FURTHER DETAILS.
Update #1 ·
THE PURPOSE OF THIS REQUIREMENT IS TO REPAIR BY REPLACEMENT THE 3RD STORY ROOF OF THE U.S. ARMY GARRISON RFTA BUILDING 668. THE EXISTING 3RD STORY ROOF OF BUILDING 668 CONSISTS OF EXISTING ASPHALT SHINGLE ROOFING WITH UNKNOWN UNDERLAYMENT SUPPORTED BY A LOW-PITCH PLYWOOD DECK SHEETING. THE BUILT-UP ROOFING IS TO BE REMOVED AND REPLACED WITH AN ASPHALT SHINGLE ROOF. EXISTING LIGHTNING PROTECTION IS TO BE REMOVED AND REINSTALLED UPON COMPLETION OF THE NEW ROOFING SYSTEM. PLEASE ALL ATTACHMENTS TO THIS SOLICITATION FOR FURTHER DETAILS.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| Building 668 Asphalt Shingle Roof Replacement - Devens, MA | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| GAOA Remove and Replace Roofing on Island Park Admin Site Housing Units | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity