This is a Solicitation, Offer, and Award form (Standard Form 1442) for a sealed bid construction project issued by the U.S. Army Garrison Devens Reserve Forces Training Area on June 1, 2026. The solicitation seeks contractor services for Building 668 Asphalt Shingle Roof Replacement located at 31 10th Mountain Division Road, Devens, Massachusetts 01434. The project involves the complete removal and replacement of the third-story existing asphalt shingle roof, including removal and reinstallation of existing lightning protection. The requirement is solicited as an SBA 8(a) competitive set-aside restricted to SBA 8(a) participants serviced by the SBA Massachusetts District Office, with a NAICS code of 236220 (Commercial and Institutional Building Construction) and a corresponding size standard of $45,000,000.00.
Sealed bids are due on June 26, 2026, at 10:00 AM local time at the Army Contracting Command office in Picatinny, New Jersey. The Government intends to award a single firm-fixed-price (FFP) contract. The contractor must begin performance within 10 calendar days of award and complete the work within 120 calendar days of receiving the Notice to Proceed. Performance and payment bonds are required, with bond premiums due within 10 days of award. An offer guarantee is required in the form of a bid bond equal to 20 percent of the bid price or $3,000,000, whichever is less. Evaluation will follow a Lowest Price Technically Acceptable methodology, with award to the responsible offeror whose offer is most advantageous to the Government. All offers must remain valid for 120 calendar days, and offerors must provide detailed cost breakdowns including labor hours, labor categories, labor rates, material quantities, material unit prices, and equipment, along with proof of valid certificate of insurance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment W15QKN26QA1190001 SF 30.pdf | ||
| 26-Q-A119 - Questions document ver1.docx | DOCX document | |
| Attachment 0001 - Performance Work Statement.pdf | ||
| Attachment 0002 - Construction Cost Breakdown Form.xls | XLS spreadsheet | |
| Performance Bond.pdf | ||
| Davis-Bacon Act MA20260004 dated 18 May 2026.pdf | ||
| Bid Bond.pdf | ||
| Payment Bond.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR
INFORMATION CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF PAGES
AWARD (To be completed by Government)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES
CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
Section A - Solicitation/Contract Form
Building 668 Asphalt Shingle Roof Replacement - Fort Devens, MAInstrument Name:
INSTRUCTIONS TO OFFERORS
THIS REQUIREMENT IS SOLICITED AS AN SBA 8(a) COMPETITIVE SET-ASIDE, RESTRICTED TO SBA 8(a) PARTICIPANTS SERVICED BY SBA OFFICE OF
MASSACHUSETTS IAW DFARS CLAUSE 252.219-7010
THIS REQUIREMENT IS SUBJECT TO THE AVAILABILITY OF FUNDS IAW FAR
CLAUSE 52.232-18
1. The Army Contracting Command- New Jersey (ACC-NJ) on behalf of the United States Army Garrison (USAG) Devens Reserve Forces Training Area (RFTA) has a requirement for for asphalt shingle roof replacement for Building 668 located at 31 10th Mountain Division Road, Devens, MA 01434. The Contractor shall provide all plant, labor, equipment, tools, materials, supervision, incidentals, and services required to perform and complete the work necessary to fully remove and replace the third story existing asphalt roof to Building 668. The contractor shall perform to the standards in accordance with the Performance Work Statement (PWS), as well as all local, state and federal regulations. Quotes will only be considered from 8(a) situated firms who have an approved business plan on file and serviced by the Small Business Administration (SBA) Massachusetts District Office.
2. The North American Industry Classification System (NAICS)Code that applies to the principal nature of the acquisition is 236220 - Commercial and Institutional Building Construction with a corresponding size standard of $45,000,000.00.
3. The Government intends to award a single, firm-fixed-price (FFP) contract. The performance for this effort shall begin within 10 calendar days after receipt of award and be completed within 120 calendar days after receipt of the Notice to Proceed.
4. The Offeror must be registered in the System for Award Management (SAM)in order to be eligible to receive a Department of Defense contract award. If you need to register in SAM go to https://www.SAM.gov.
W15QKN26QA119
https://www.sam.gov./
5. See Federal Acquisition Regulation (FAR) Clause 52.212-l, "Instructions to Offerors - Commercial Services" and FAR 52.212-1, Addendum for additional information.
6. See FAR Clause 52.212-2,"Evaluation - Commercial Services" and FAR 52.212-2, Addendum for additional information and evaluation criteria.
7. A site visit is not mandatory but, highly encouraged and is available upon request. All requests shall be submitted via e-mail to the Site Visit point of contact: Mr. Paul Lavoie, Engineer Technician at Paul.A.Lavoie3.civ@army.mil . The Contract Specialist for this requirement is Mr.
James Clark at James.E.Clark773.civ@army.mil , and the Contracting Officer for this requirement is Ms. Jasmyne Peterson at Jasmyne.C.Peterson.civ@army.mil , no later than 4:00PM EST on MONDAY, 08 JUNE 2026 for a tentative Site Visit to be scheduled.
8. All questions regarding this solicitation shall be submitted via E-mail no later than 2:00 PM EST on FRIDAY, 12 JUNE 2026 to the Contract Specialist: James Clark at James.E.Clark773.
civ@army.mil and the Contracting Officer: Jasmyne Peterson at Jasmyne.C.Peterson.civ@army.
mil. The questions will be answered all at once and uploaded to the Contract Opportunities website at https://www.sam.gov posting after the question period has ended.
9. COMPLETING A QUOTE FOR SUBMITTAL
a. Proposals are due no later than the date and time listed in Block 13 of the SF 1442 and shall be submitted via the PIEE solicitation website or via email to: James Clark, Contract Specialist at James.E.Clark773.civ@army.mil and Jasmyne Peterson, Contracting Officer at Jasmyne.C.
Peterson.civ@army.mil. Updates to this solicitation will be posted on the Contract Opportunities website at https://www.SAM.gov.
b. The Offeror shall provide the name, title, address, email address, and telephone number of the company/division point of contact regarding business decisions made with respect to the proposal and who can contractually obligate the company. In addition, the contractor shall sign and acknowledge any potential resulting amendments to this solicitation. In doing so, the offeror agrees to the contract terms and conditions as written in the Solicitation.
c. The Offeror shall submit a price for each FFP Contract Line-Item Number (CLIN) for the base period and option periods on the Standard Form (SF) 1442 Continuation Sheets of the solicitation.
The Government maintains a tax-exempt status.
W15QKN26QA119
d. The Offerors shall submit a signed SF1442 (Pg. 2, Block 30a. Signature of Offeror/Contractor).
The Offeror is required to complete blocks 30a, 30b and 30c of the SF1442. In doing so, the Offeror agrees to the contract terms and conditions as written in the solicitation.
e. The Offerors shall provide their UEID Number, CAGE Code, Federal Tax Identification Number and any small business preference or socioeconomic designations (8a Certified, HUBZone Certified, WOSB, etc.) that are applicable to this NAICS Code stated in the 'Instructions to Offerors' page.
f. Pricing for each CLIN must be submitted in the proper format. The proper format consists of QUANTITY* UNIT PRICE= AMOUNT/NET AMOUNT. In the event there is a discrepancy in the calculation, the UNIT PRICE will be held to the intended price multiplied by the QUANTITY. If the offeror shows only the AMOUNT/NET AMOUNT, but fails to enter a UNIT PRICE, the AMOUNT /NET AMOUNT divided by the QUANTITY will be held to be the intended price.
g. The proposed price shall include all personnel, supplies, services, management, overhead, direct costs, G&A, and profit to fulfill the contractual requirements of the PWS. The Offeror shall provide a detailed, itemized breakdown of Labor and Material Breakout of quote (labor hours, labor categories, labor rates, material quantity, and material unit price) using the Construction Cost Breakdown Form included with this solicitation. The Construction Cost Breakdown Form to be submitted with their proposal shall be submitted in Microsoft Excel format and MUST HAVE THE
FORMULAS INTACT AND FUNCTIONING.
h. The Offeror shall provide proof of a valid Certificate of lnsurance in accordance with FAR Clause 52.228-5, "Insurance - Work on a Government Installation" and "Required Insurance".
i. Offeror shall complete all "fill-ins" in provisions and clauses that apply and include with submission response to this solicitation.
j. The offeror is reminded it shall offer on any issued plans, drawings, and specifications as amended. Failure to provide any applicable information required and any deviations, conditions or attachments made by the offeror itself may render the offer non-responsive and may be cause for ineligibility for award.
10. All services shall be performed in accordance with the Performance Work Statement (PWS).
11. All offers shall remain valid for 120 calendar days. Multiple proposals will not be accepted.
12. SAM Unique ID#:
13. CAGE (commercial and government entity) code:
14. Federal Tax ID
15. Attachments:
Attachment 0001 - Performance Work Statement (B668 Roof PWS)
Attachment 0002 - Construction Cost Breakdown Form
SOLICITATION ADMINISTRATION
Inquiries concerning all contractual actions after award shall be directed first to the Contract Specialist. In my absence, please contact the Contracting Officer.
CHANGES: The Contract Specialist will incorporate all changes and other administrative actions to the contract as directed and authorized by the Contracting Officer.
CONTRACT ADMINISTRATOR - ACC-NJ-WSD
James Clark, Contract Specialist
Phone: (520) 687-5569 e-mail: James.E.Clark773.civ@army.mil
Jasmyne C. Peterson, Contracting Officer
Phone: (520) 687-5228 e-mail: Jasmyne.C.Peterson.civ@army.mil
GOVERNMENT POINT OF CONTACT / SITE VISIT POC
Paul A. Lavoie, Engineer Technician
U.S. Army IMCOM HQ, Ft. Devens
Phone: (520) 717-2442 e-mail: Paul.A.Lavoie3.civ@army.mil
SERVICE LOCATIONS
USAG Devens RFTA
Building 668
31 10th Mountain Division Road
Ft. Devens, MA 01434
HQ AMC LEVEL PROTEST
If you have complaints about this procurement, it is preferable that you first attempt to resolve those concerns with the responsible contracting officer. However, you can also protest to Headquarters, AMC. The HQ, AMC-Level Protest Program is intended to encourage interested parties to seek resolution of their concerns within AMC as an Alternative Dispute Resolution forum, rather than filing a protest with the General Accounting Office or other external forum.
Contract award or performance is suspended during the protest to the same extent, and within the same time periods, as if filed at the GAO. The AMC protest decision goal is to resolve protests within 20 working days from filing. To be timely, protests must be filed within the periods specified in FAR 33.103. Send protests (other than protests to the contracting officer) to:
Headquarters U.S. Army Materiel Command
Office of Command Counsel-Deputy Command Counsel 4400 Martin Road Rm: A6SE040.001 Redstone Arsenal, AL 35898-5000
Fax: (256) 450-8840\Email: usarmy.redstone.usamc.mbx.protests@mail.mil The AMC-level protest procedures are found at: Web Address: http://www.amc.army.mil/amc/com mandcounsel.html.
LEVEL I ANTI-TERRORISM
LEVEL I ANTI-TERRORISM AWARENESS TRAINING REQUIREMENTS FOR CONTRACTOR
EMPLOYEES (OCT 2010)
(a) All contractor employees requiring access to any Federally-controlled facility and logical access to Federally controlled information systems except for "national security systems" as defined by 44 U.S.C. 3542(b)(2), should be certified in Level I Anti-Terrorism Training. The training is accessible from any computer with access to the World Wide Web and is available at https:/atlevel1.dtic.mil /at. The contractor is responsible for ensuring that the training has been satisfactorily completed and that valid certificates of completion have been submitted to the Contracting Officers Representative (COR) with a copy furnished to the Contracting Officer. The Certificates are valid for one year, therefore, training shall be completed every year for the duration of the contract.
(b) The term Federally-controlled facility is defined as:
(1) Federally-owned buildings or leased space, whether for single or multi- tenant occupancy, and its grounds and approaches, all or any portion of which is under the jurisdiction, custody or control of a department or agency;
(2) Federally-controlled commercial space shared with non- government tenants. For example, if a department or agency leased the 10th floor of a commercial building, the Directive applies to the 10th floor only;
(3) Government-owned, contractor-operated facilities, including laboratories engaged in national defense research and production activities; and
(4) Facilities under a management and operating contract, such as for the operation, maintenance, or support of a Government-owned or Government-controlled research, development, special production, or testing establishment.
(c) The term "Federally-controlled information system" means an information system (44 U.S.C.
3502(8)) used or operated by a Federal agency, or a contractor or other organization on behalf of the agency (44 U.S.C. 3544(a)).
(d) The term "contractor employee" includes employees, agents, students or student interns, or representatives and all employees, agents or representatives of all subcontractors and suppliers.
DISCLOSURE OF UNIT PRICE
This constitutes notification pursuant to Executive Order 12600, Pre- Disclosure Notification Procedures for Confidential Commercial Information (June 23, 1987), of our intention to release unit prices in response to any request under the Freedom of Information Act, 5 USC 552. Unit price is defined as the contract price per unit or item purchased. We consider any objection to be waived unless the contracting officer is notified of your objection to such posting prior to submission of initial proposals.
REQUIRED INSURANCE
FAR 28.307-2 Liability
In accordance with FAR 28.307-2, the Contractor is required to provide and maintain the kinds and minimum amounts of insurance stated below:
a) Workers' Compensation and Employer's Liability. Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers. (See 28.305(c) for treatment of contracts subject to the Defense Base Act.)
(b) General Liability.
(1) The contracting officer shall require bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.
(2) Property damage liability insurance shall be required only in special circumstances as determined by the agency.
(c) Automobile Liability. The contracting officer shall require automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.
(d) Aircraft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the contracting officer shall require aircraft public and passenger liability insurance.
Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger liability, and $200,000 per occurrence for property damage. Coverage for passenger liability bodily injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.
(e) Vessel Liability. When contract performance involves use of vessels, the contracting officer shall require, as determined by the agency, vessel collision liability and protection and indemnity liability insurance.
REQUIRED BONDS
52.228-13 Alternative Payment Protections (July 2000)
(a) The Contractor shall submit one of the following payment protections:
A payment bond; An irrevocable letter of credit; A tripartite agreement
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within 10 days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
ADDENDUM TO CLAUSE 52.212-1
Instructions to Offerors - Commercial Items
Paragraphs (D), (E), (H), and (I) are hereby deleted from the referenced provisions.
Paragraph (C) period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 120 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.
ADDENDUM TO CLAUSE 52.212-2
a. The Government will award a Purchase Order resulting from this solicitation to a responsible SBA 8(a) participant whose offer meet the requirements of the solicitation and Performance Work Statement. The basis for award of any contract resulting from this solicitation shall be the result of the evaluation factors specified herein, utilizing the Lowest Price Technically Acceptable methodology. The Government intends to award a single Firm Fixed Price (FFP) contract.
b. The Government intends to award without discussion. The Government reserves the right to conduct clarifications or discussions if deemed in its best interest to determine price fair and reasonableness.
c. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
I. PRICE:
(a) The Government will evaluate offers for award purposes by adding the total price for all Contract Line Item Numbers (CLINs) for the total evaluated price. In the event there is a difference between a unit price and the total CLIN amount, the unit price shall be held as the intended price multiplied by the number of units. If the offeror shows only the total amount but fails to submit a unit price, the total CLIN amount shall be divided by the quantity and held as the intended price.
(b) The submitted Construction Cost Breakdown Form, may be used by the Government in its Failure to provide the required pricing information may result in the proposal being price analysis.
determined unacceptable.
(c) Unbalanced pricing exists when, despite an acceptable total evaluated price, one or more contract line items are significantly overstated or understated as indicated by the application of cost and/or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.
II. SBA 8(a) Eligibility
(a) The apparent successful offeror must be an eligible SBA 8(a) Participant in accordance with FAR 19.805 and FAR 19.806 at the time of proposal submission and contract award.
III. TECHNICAL:
(a) Technical acceptability will be evaluated on an acceptable/unacceptable basis. To be rated acceptable, the offeror must demonstrate an understanding of the requirements and a feasible t echnical approach capable of meeting the requirements of the PWS. Offerors shall provide
Attachment 0002: Construction Cost Breakdown Form, identifying labor hours, labor categories, labor rate, material quantity, material pricing, and equipment to perform the tasks necessary as outlined in the PWS.
III. PAST PERFORMANCE:
(a) The Government may review available past performance and integrity information, including the Contractor Performance Assessment Reporting System (CPARS) and Federal Awardee Performance & Integrity Information System (FAPIIS), as well as any other Government-sponsored information available may be utilized to help make a responsibility determination in accordance with FAR 9.104.
IV. Failure to provide any of the requested information may result in the proposal being deemed unacceptable and may not be eligible for award.
V. The Government will begin the evaluation process with a ranking based on the Total Evaluated Price from the lowest to highest price. Following the price ranking, only the lowest priced offeror will be evaluated for technical acceptability under the non-price factor(s) according to the evaluation criteria set forth in this addendum. If acceptable, the evaluation will stop at that point and an award will be made to the lowest priced technically acceptable offeror. If the offer is deemed unacceptable, the Government will continue to review proposals in order of price until evaluating an offer that is considered technically acceptable and eligible for award based on the criteria set forth in this addendum. The Government reserves the right to conduct additional technical evaluations as deemed necessary.
ADDENDUM TO CLAUSE 52.212-4
Contract Terms and Conditions - Commercial Items
Paragraphs (h), (n), (o) and (p) are hereby deleted from the referenced clause.
*** END OF NARRATIVE ***
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price
Amount
0001 Product Service Description: DEMO AND
INSTALL NEW ROOF
1 Job
0002 Product Service Description: BOND 1 Each
Section C - Description/Specifications/Statement of Work
Requirements
SUBJECT TO THE AVAILABILITY OF FUNDS. THIS REQUIREMENT IS INCLUDED IN OR
PROVIDED FOR IN THE FY2026 FINANCIAL PLAN. THIS STATEMENT IS NOT A
COMMITMENT OF FUNDS. The existing 3rd story roof of Building 668 consists of existing asphalt shingle roofing
Product Service Code : Z1AZ North American Industry Classification System (NAICS) : 238150
Product Service Code : Z1AZ North American Industry Classification System (NAICS) : 238150
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.246-12 Inspection of Construction. 1996-08
Section F - Deliveries or Performance
0001 1 JobQuantity
Address and POC Service Performance Site DoDAAC: W13GPY
Period of Performance From 20 Apr 2026 To 20 Apr 2026
0002 1 EachQuantity
Address and POC Service Performance Site DoDAAC: W13GPY
Period of Performance From 20 Apr 2026 To 20 Apr 2026
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.201-7000 Contracting Officer's Representative.
1991-12
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports.
2018-12
252.236-7000 Modification Proposals--Price Breakdown.
1991-12
DFARS Clauses Incorporated by Full Text
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.232-7006 Wide Area WorkFlow Payment Instructions.
2023-01
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause-
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall-
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web- Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
N/A
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
COMBO (Construction Invoice)
(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC HQ0490
Issue By DoDAAC W15QKN Admin DoDAAC W15QKN Inspect By DoDAAC W13GPY Ship To Code N/A Ship From Code N/A Mark For Code N/A Service Approver (DoDAAC) W13GPY Service Acceptor (DoDAAC) W13GPY Accept at Other DoDAAC N/A LPO DoDAAC N/A DCAA Auditor DoDAAC N/A Other DoDAAC(s) N/A (*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
Zygmunt.V.Osiecki.civ@army.mil
(Contracting Officer: Insert applicable information or "Not applicable.")
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section I - Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.202-1 Definitions. 2020-06
52.203-3 Gratuities. 1984-04
52.203-6 Restrictions on Subcontractor Sales to the Government.
2020-06
52.203-6 Restrictions on Subcontractor Sales to the Government.
(Alternate I)
2020-06 Alternate I 2021-11
52.203-12 Limitation on Payments to Influence Certain Federal Transactions.
2020-06
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.
2017-01
52.204-9 Personal Identity Verification of Contractor Personnel.
2011-01
52.204-13 System for Award Management- Maintenance. (Deviation 2026- O0038)
2026-02
52.204-13 System for Award Management- Maintenance. (Deviation 2026- O0038) (Alternate I)
2026-02 Alternate I 2026-02
52.204-19 Incorporation by Reference of Representations and
2014-12
Certifications.
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Deviation 2026- O0038)
2026-02
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters.
(Deviation 2026-O0038)
2026-02
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations.
(Deviation 2026-O0038)
2026-02
52.211-13 Time Extensions. 2000-09
52.212-4 Terms and Conditions- Commercial Products and Commercial Services. (Deviation 2026-O0038)
2026-02
52.219-6 Notice of Total Small Business Set-Aside. (Alternate I)
2026-02 Alternate I 2020-03
52.219-8 Utilization of Small Business Concerns. (Deviation 2026- O0038)
2026-02
52.219-16 Liquidated Damages- Subcontracting Plan. (Deviation 2026-O0038)
2026-02
52.222-3 Convict Labor. (Deviation 2026- O0038)
2026-02
52.222-6 Construction Wage Rate Requirements. (Deviation 2026- O0038)
2026-02
52.222-7 Withholding of Funds. (Deviation 2026-O0038)
2026-02
52.222-8 Payrolls and Basic Records.
(Deviation 2026-O0038)
2026-02
52.222-9 Apprentices and Trainees.
(Deviation 2026-O0038)
2026-02
52.222-10 Compliance with Copeland Act Requirements. (Deviation 2026- O0038)
2026-02
52.222-11 Subcontracts (Labor Standards).
(Deviation 2026-O0038)
2026-02
52.222-12 Contract Termination-Debarment. 2014-05
52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations.
2014-05
52.222-14 Disputes Concerning Labor Standards. (Deviation 2026- O0038)
2026-02
52.222-15 Certification of Eligibility. 2014-05
52.222-35 Equal Opportunity for Veterans.
(Deviation 2026-O0038)
2026-02
52.222-36 Equal Opportunity for Workers with Disabilities. (Deviation 2026- O0038)
2026-02
52.222-37 Employment Reports on 2026-02
Veterans. (Deviation 2026- O0038)
52.222-40 Notification of Employee Rights Under the National Labor Relations Act. (Deviation 2026- O0038)
2026-02
52.222-50 Combating Trafficking in Persons. (Deviation 2026-O0038)
2026-02
52.222-54 Employment Eligibility Verification. (Deviation 2026- O0038)
2026-02
52.222-62 Paid Sick Leave Under Executive Order 13706. (Deviation 2026- O0038)
2026-02
52.222-90 Addressing DEI Discrimination by Federal Contractors.
(Deviation 2026-O0040, Revision 1)
2026-04
52.223-2 Reporting of Biobased Products Under Service and Construction Contracts. (Deviation 2026- O0038)
2026-02
52.223-5 Pollution Prevention and Right-to- Know Information.
2024-05
52.223-23 Sustainable Products. (Deviation 2026-O0038)
2026-02
52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving.
2024-05
52.228-2 Additional Bond Security. 1997-10
52.228-5 Insurance-Work on a Government Installation.
1997-01
52.228-11 Individual Surety-Pledge of Assets.
2021-02
52.228-14 Irrevocable Letter of Credit. 2014-11
52.228-15 Performance and Payment Bonds-Construction.
2020-06
52.229-3 Federal, State, and Local Taxes. 2013-02
52.229-12 Tax on Certain Foreign Procurements. (Deviation 2026- O0038)
2021-02
52.232-17 Interest. 2014-05
52.232-18 Availability of Funds. 1984-04
52.232-23 Assignment of Claims. 2014-05
52.232-27 Prompt Payment for Construction Contracts.
2017-01
52.232-33 Payment by Electronic Funds Transfer-System for Award Management.
2018-10
52.232-39 Unenforceability of Unauthorized Obligations.
2013-06
52.232-40 Providing Accelerated Payments to Small Business Subcontractors.
2023-03
52.233-1 Disputes. (Deviation 2026- O0038)
2026-02
52.233-3 Protest after Award. (Deviation 2026-O0038)
2026-02
52.233-3 Protest after Award. (Deviation 2026-O0038) (Alternate I)
2026-02 Alternate I 2026-02
52.233-4 Applicable Law for Breach of Contract Claim. (Deviation 2026- O0038)
2026-02
52.236-2 Differing Site Conditions.
(Deviation 2026-O0038)
2026-02
52.236-3 Site Investigation and Conditions Affecting the Work. (Deviation 2026-O0038)
2026-02
52.236-5 Material and Workmanship.
(Deviation 2026-O0038)
2026-02
52.236-6 Superintendence by the Contractor. (Deviation 2026- O0038)
2026-02
52.236-8 Other Contracts. (Deviation 2026- O0038)
2026-02
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (Deviation 2026-O0038)
2026-02
52.236-10 Operations and Storage Areas.
(Deviation 2026-O0038)
2026-02
52.236-11 Use and Possession Prior to Completion. (Deviation 2026- O0038)
2026-02
52.236-12 Cleaning Up. (Deviation 2026- 2026-02
52.236-13 Accident Prevention. (Deviation 2026-O0038)
2026-02
52.236-15 Schedules for Construction Contracts. (Deviation 2026- O0038)
2026-02
52.236-17 Layout of Work. (Deviation 2026- O0038)
2026-02
52.236-21 Specifications and Drawings for Construction. (Deviation 2026- O0038)
2026-02
52.237-2 Protection of Government Buildings, Equipment, and Vegetation.
1984-04
52.240-91 Security Prohibitions and Exclusions. (Deviation 2026- O0038)
2026-02
52.242-13 Bankruptcy. 1995-07
52.242-14 Suspension of Work. 1984-04
52.243-4 Changes. (Deviation 2026- O0038)
2026-02
52.244-6 Subcontracts for Commercial Products and Commercial Services. (Deviation 2026-O0038)
2026-04
52.246-25 Limitation of Liability-Services. 1997-02
52.249-2 Termination for Convenience of the Government (Fixed-Price).
2012-04
52.249-10 Default (Fixed-Price Construction).
1984-04
DFARS Clauses Incorporated by Reference
Date
Alternate Deviation
Variation Effective Date
252.203-7000 Requirements Relating to Compensation of Former DoD Officials.
2011-09
252.203-7002 Requirement to Inform Employees of Whistleblower Rights.
2022-12
252.204-7004 Antiterrorism Awareness Training for Contractors.
2023-01
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting.
2024-05
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.
2023-01
252.205-7000 Provision of Information to Cooperative Agreement Holders.
2024-10
252.209-7004 Subcontracting with Firms that are Owned or Controlled by the Government of a Country that is a State Sponsor of Terrorism.
2019-05
252.223-7006 Prohibition on Storage, 2014-09
Treatment, and Disposal of Toxic or Hazardous Materials.
252.223-7008 Prohibition of Hexavalent Chromium.
2023-01
252.225-7001 Buy American and Balance of Payments Program.
2024-02
252.225-7002 Qualifying Country Sources as Subcontractors.
2022-03
252.225-7012 Preference for Certain Domestic Commodities.
2022-04
252.225-7048 Export-Controlled Items. 2013-06
252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime.
2023-01
252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region.
2023-06
252.226-7001 Utilization of Indian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns.
2023-01
252.232-7010 Levies on Contract Payments. 2006-12
252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel.
2023-01
252.243-7001 Pricing of Contract Modifications. 1991-12
252.243-7002 Requests for Equitable 2022-12
Adjustment.
252.244-7000 Subcontracts for Commercial Products or Commercial Services.
2023-11
252.246-7004 Safety of Facilities, Infrastructure, and Equipment for Military Operations.
2010-10
252.247-7023 Transportation of Supplies by Sea.
2024-10
252.247-7023 Transportation of Supplies by Sea. (Alternate I)
2024-10 Alternate I 2024-10
FAR Clauses Incorporated by Full Text
Date
Alternate Deviation
Variation Effective Date
52.211-12 Liquidated Damages- Construction.
2000-09
Liquidated Damages-Construction (Sept 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of 46.08[Contracting Officer insert amount] for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
52.212-4 Terms and Conditions- Commercial Products and Commercial Services. (Deviation 2026-O0038) (Alternate I)
2026-02 Alternate I 2026-02
Alternate I (Feb 2026) (Deviation 2026-O0038). When contemplating a time-and-materials or labor-hour contract, substitute the following paragraphs (a), (b), (i), (l), and (m) for those in the basic clause.
(a) The clause at Federal Acquisition Regulation (FAR) 52.202-1, Definitions, is incorporated by reference. As used in this clause-
Direct materials means those materials that enter directly into the end product, or that are used or consumed directly in connection with the furnishing of the end product or service.
Hourly rate means the rate(s) prescribed in the contract for payment for labor that meets the labor category qualifications of a labor category specified in the contract that are-
(1) Performed by the contractor;
(2) Performed by the subcontractors; or
(3) Transferred between divisions, subsidiaries, or affiliates of the contractor under a common control.
Materials means-
(1) Direct materials, including supplies transferred between divisions, subsidiaries, or affiliates of the contractor under a common control;
(2) Subcontracts for supplies and incidental services for which there is not a labor category specified in the contract;
(3) Other direct costs (e.g., incidental services for which there is not a labor category specified in the contract, travel, computer usage charges, etc.);
(4) The following subcontracts for services which are specifically excluded from the hourly rate:
____[Insert any subcontracts for services to be excluded from the hourly rates prescribed in the schedule.]; and
(5) Indirect costs specifically provided for in this clause.
Subcontract means any contract, as defined in FAR 2.101, entered into with a subcontractor to furnish supplies or services for performance of the prime contract or a subcontract including transfers between divisions, subsidiaries, or affiliates of a contractor or subcontractor. It includes, but is not limited to, purchase orders, and changes and modifications to purchase orders.
(b) Inspection/Acceptance.
(1) The Government has the right to inspect and test all materials furnished and services performed under this contract at all places and times before acceptance. The Government will perform inspections and tests in a manner that will not unduly delay the work.
(2) If the Government performs inspection or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish and shall require subcontractors to furnish all reasonable facilities and assistance for the safe and convenient performance of these duties.
(3) Unless otherwise specified in the contract, the Government will accept or reject services and materials at the place of delivery as promptly as practicable after delivery, and they will be presumed accepted 60 days after the date of delivery, unless accepted earlier.
(4) At any time during contract performance, but not later than 6 months (or such other time as may be specified in the contract) after acceptance of the services or materials last delivered under this contract, the Government may require the Contractor to replace or correct services or materials that at time of delivery failed to meet contract requirements. Except as otherwise specified in paragraph (b)(6) of this clause, the cost of replacement or correction shall be determined under paragraph (i) of this clause, but the "hourly rate" for labor hours incurred in the replacement or correction shall be reduced to exclude that portion of the rate attributable to profit. Unless otherwise specified below, the portion of the "hourly rate" attributable to profit shall be 10 percent. The Contractor shall not tender for acceptance materials and services required to be replaced or corrected without disclosing the former requirement for replacement or correction, and, when required, shall disclose the corrective action taken. ____[Insert portion of labor rate attributable to profit.]
(5)(i) If the Contractor fails to proceed with reasonable promptness to perform required replacement or correction, and if the replacement or correction can be performed within the ceiling price (or the ceiling price as increased by the Government), the Government may-
(A) By contract or otherwise, perform the replacement or correction, charge to the Contractor any increased cost, or deduct such increased cost from any amounts paid or due under this contract; or
(B) Terminate this contract for cause.
(ii) Failure to agree to the amount of increased cost to be charged to the Contractor shall be a dispute under the Disputes clause of the contract.
(6) Notwithstanding paragraphs (b)(4) and (5) of this clause, the Government may, at any time, require the Contractor to remedy by correction or replacement, without cost to the Government, any failure by the Contractor to comply with the requirements of this contract, if the failure is due to-
(i) Fraud, lack of good faith, or willful misconduct on the part of the Contractor's managerial personnel; or
(ii) The conduct of one or more of the Contractor's employees selected or retained by the Contractor after any of the Contractor's managerial personnel has reasonable grounds to believe that the employee is habitually careless or unqualified.
(7) This clause applies in the same manner and to the same extent to corrected or replacement materials or services as to materials and services originally delivered under this contract.
(8) The Contractor has no obligation or liability under this contract to correct or replace materials and services that at time of delivery do not meet contract requirements, except as provided in this clause or as may be otherwise specified in the contract.
(9) Unless otherwise specified in the contract, the Contractor's obligation to correct or replace Government-furnished property shall be governed by the clause pertaining to Government property.
(i) Payments.
(1) Work performed. The Government will pay the Contractor as follows upon the submission of commercial invoices approved by the Contracting Officer:
(i) Hourly rate.
(A) The amounts shall be computed by multiplying the appropriate hourly rates prescribed in the contract by the number of direct labor hours performed. Fractional parts of an hour shall be payable on a prorated basis.
(B) The rates shall be paid for all labor performed on the contract that meets the labor qualifications specified in the contract. Labor hours incurred to perform tasks for which labor qualifications were specified in the contract will not be paid to the extent the work is performed by individuals that do not meet the qualifications specified in the contract, unless specifically authorized by the Contracting Officer.
(C) Invoices may be submitted once each month (or at more frequent intervals, if approved by the Contracting Officer) to the Contracting Officer or the authorized representative.
(D) When requested by the Contracting Officer or the authorized representative, the Contractor shall substantiate invoices (including any subcontractor hours reimbursed at the hourly rate in the schedule) by evidence of actual payment, individual daily job timecards, records that verify the employees meet the qualifications for the labor categories specified in the contract, or other substantiation specified in the contract.
(E) Unless the Schedule prescribes otherwise, the hourly rates in the Schedule shall not be varied by virtue of the Contractor having performed work on an overtime basis.
(1) If no overtime rates are provided in the Schedule and the Contracting Officer approves overtime work in advance, overtime rates shall be negotiated.
(2) Failure to agree upon these overtime rates shall be treated as a dispute under the Disputes clause of this contract.
(3) If the Schedule provides rates for overtime, the premium portion of those rates will be reimbursable only to the extent the overtime is approved by the Contracting Officer.
(ii) Materials.
(A) If the Contractor furnishes materials that meet the definition of a commercial product at FAR 2.101, the price to be paid for such materials shall not exceed the Contractor's established catalog or market price, adjusted to reflect the-
(1) Quantities being acquired; and
(2) Any modifications necessary because of contract requirements.
(B) Except as provided for in paragraph (i)(1)(ii)(A) and (D)(2) of this clause, the Government will reimburse the Contractor the actual cost of materials (less any rebates, refunds, or discounts received by the contractor that are identifiable to the contract) provided the Contractor-
(1) Has made payments for materials in accordance with the terms and conditions of the agreement or invoice; or
(2) Makes these payments within 30 days of the submission of the Contractor's payment request to the Government and such payment is in accordance with the terms and conditions of the agreement or invoice.
(C) To the extent able, the Contractor shall-
(1) Obtain materials at the most advantageous prices available with due regard to securing prompt delivery of satisfactory materials; and
(2) Give credit to the Government for cash and trade discounts, rebates, scrap, commissions, and other amounts that are identifiable to the contract.
(D) Unless listed below, other direct and indirect costs will not be reimbursed.
(1) Other direct costs. The Government will reimburse the Contractor on the basis of actual cost for the following, provided such costs comply with the requirements in paragraph (i)(1)(ii)(B) of this clause: ____[Insert each element of other direct costs (e.g., travel, computer usage charges, etc. Insert "None" if no reimbursement for other direct costs will be provided. If this is an indefinite delivery contract, the Contracting Officer may insert "Each order must list separately the elements of other direct charge(s) for that order or, if no reimbursement for other direct costs will be provided, insert 'None'".]
(2) Indirect costs (material handling,…