Buckley SFB Chiller Replacement
Closed Pre-Solicitation Posted
- Solicitation number
- BuckleySFBChillerReplacement
- Agency
-
Air Force Space Command
Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- Place of performance
- Aurora, Colorado 80011, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force, on behalf of the Base Civil Engineer Squadron at Buckley Space Force Base in Colorado, is conducting market research to identify qualified contractors capable of performing a complete chilled water system replacement, with responses due by July 22, 2026. This is a Total Small Business set-aside targeting socio-economic businesses including 8(a), SDVOSB, HUBZone, and WOSB firms.
The existing chiller system serving the facility's server room operates at half capacity with degraded serviceability and frequent downtime, creating mission risk in a 24/7 operations environment. The selected contractor must provide all labor, tools, equipment, and materials to replace the chiller, two Computer Room Air Handlers (CRAHs), and associated distribution piping while maintaining zero downtime to the active server room.
Technical requirements include professional engineering cooling load calculations per UFC 3-410-01, Sections 2-4 and 2-5.6, and standardization on Trane-series equipment per Department of the Air Force Class Justification. The chiller must fit within a concrete pad of 19'-11" L × 12'-8" W × 6'-8" H with a maximum operational weight of 12,000 pounds. CRAHs must navigate a 34" W × 82" H doorway pathway. The system integrates with existing 460V, 60 Hz, 3-Phase electrical power and the Energy Management Control System. Compliance is required with UFC 3-410-02 (DDC for HVAC), UFC 3-501-01, OSHA standards, and base Anti-Terrorism/Force Protection and Operational Security requirements. Qualified technicians must hold certifications specific to Trane chilled water systems and server room cooling operations. All personnel require National Crime Information Center checks and Level I Anti-Terrorism awareness training.
Interested parties must submit a Capability Statement by 3:00 PM Mountain Daylight Time on July 22, 2026, addressing company information, CAGE Code, Unique Entity ID, business size and socio-economic status under NAICS 238220, Trane distributor/installer authorization, relevant 24/7 operations experience, and ability to meet base access and security clearance requirements.
Notice text
PLEASE SEE ATTACHMENTS FOR ADDITIONAL INFORMATION REGARDING THIS REQUIREMENT
Notice Type: Sources Sought (MARKET RESEARCH PURPOSES ONLY)
Title: Secure Facility Chilled Water System Replacement – Federal Installation, CO
NAICS Code: 238220 – Plumbing, Heating, and Air-Conditioning Contractors
Product Service Code (PSC): N041 – Installation of Equipment: Refrigeration, Air Conditioning, and Air Circulating Equipment
Response Date: 22 July 2026
Description:
The Department of the Air Force (DAF), on behalf of the Base Civil Engineer Squadron (CES) at a Federal Installation in Colorado, is conducting market research to identify qualified, experienced, and interested business sources—specifically targeting small and socio-economic businesses (e.g., 8(a), SDVOSB, HUBZone, WOSB)—capable of performing a complete chilled water system replacement in a 24/7 operations facility.
Project Objective: The chilled water system serving the facility's server room currently suffers from degraded serviceability, sub-component failures, and frequent downtime. It is operating at half capacity, which risks the loss of critical cooling for 24/7 operations. The selected contractor must provide all tools, equipment, materials, and certified labor to perform a complete system replacement with zero downtime to the active server room.
Key Scope Items & Technical Specifications:
-
Design & Sizing: Perform professional engineering cooling system design load calculations in accordance with UFC 3-410-01 (Sections 2-4 and 2-5.6) to determine final system capacity.
-
Standardization Requirement: In accordance with the DAF Class Justification and Approval (J&A) for HVAC Chiller Replacement Standardization, the design of the new chiller system must be standardized on Trane-series equipment for this installation.
-
Demolition: Safely decommission, recover refrigerant from, and remove the existing degraded chiller (Technical Systems Model: 30A0LM20-PT, Serial: 02-17-125822-001-001) and two existing Computer Room Air Handlers (CRAHs) (Data Aire Model: GFCU-04634, Serials: 2016-3226-A, 20163225-A).
-
Equipment Installation: Procure, install, and commission:
-
One (1) new water chiller with an integrated air-cooled condenser (Trane-series).
-
Two (2) new chilled-water Computer Room Air Handlers (CRAHs) inside the secure server room.
-
-
Temporary Cooling: Provide continuous, redundant temporary cooling to keep the secure server room strictly within operational temperature limits during the transition phase.
-
Controls Integration: Fully integrate new controls into the base-wide Energy Management Control System (EMCS) in strict compliance with Base EMCS Standards (dated January 21, 2026) and UFC 3-410-02.
Logistical & Physical Constraints:
-
Chiller Pad Limits: The new chiller must fit the existing concrete pad (19’ - 11” L x 12’- 8” W x 6” to 8” H) and must not exceed the structural wet weight limit of 12,000 lbs. If the equipment footprint exceeds these limits, the pad must be extended.
-
Rigging & Delivery Clearances: CRAHs must be navigated through a restricted interior corridor with doorway clearances measuring exactly 34” W x 82” H.
-
Electrical: Must integrate with the existing 460V, 60 Hz, 3-Phase power supply and comply with UFC 3-501-01.
-
Security & Clearances: All personnel must pass NCIC background checks, comply with strict OPSEC guidelines, and complete AT Level I training prior to facility access.
Files
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Troubleshoot & Repair of Portable Chillers Service Requirement | Air Education and Training Command | Total Small Business | |
| Brand Name or Equal - WaterFurnace Model: UBH015R for B3631 & B3635 - Turnkey Replacement | Air Education and Training Command | No set-aside | |
| EROS Removal and replacement of chilled and conden | Office of Acquisitions and Grants | Total Small Business | |
| Y1DZ--PN: 636-27-101, Design-Build, Install Temporary Chillers {OM} FY27 NRM 36C263-27-AP-0586 | Veterans Integrated Service Network 23 | Service-Disabled Veteran-Owned Small Business | |
| 500-Ton Trailer-Mounted Air-Cooled Chiller | Kennedy Space Center | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity