Bowling center and f&b upgrades
Closed Solicitation Posted
- Solicitation number
- NAVMWR-26-R-0038
- Agency
-
Naval Supply Systems Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- El Centro, California, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Navy Naval Supply Systems Command seeks design and construction to renovate and modernize an eight-lane bowling center (Building 485) at Naval Air Facility El Centro, California, including replacement of the pinsetter unit with a new unit featuring string bowling capability, addition of an electronic gaming area, and food operation upgrades, with proposals due July 7. The solicitation is issued to select sources only and is not subject to standard FAR requirements beyond specific references; award will be made on a best-value basis with single firm fixed price.
Place of performance is El Centro, California. The project budget is $2.3 million. Contractor responsibilities encompass site investigation (surveys, utility locating including subsurface potholing), complete architectural, civil, structural, mechanical, electrical, landscape, and fire protection design in compliance with all applicable codes, and provision of all materials, furnishings, equipment, and fixtures with associated handling, staging, delivery, transportation, and loading/unloading throughout all project phases. All bowling lanes must be USBC compliant and certified with 36-inch clearance between walls and pinspotters; the contractor must provide a USBC Inspection Report and USBC League Certification at completion at its own cost.
The contractor must obtain all required permits, provide Payment and Performance Bonds, proof of required insurance types and amounts, certified weekly payrolls, and design submittals at 50%, 95%, and 100% completion phases. Progress payments are authorized monthly with 10% retainage on design and construction invoices. Liquidated damages may be assessed at $120 per day. Proposals must be submitted in two separate volumes (price and technical), each with one original and one electronic copy, with a signed SF 33 acknowledging all amendments. Evaluation factors in descending order of importance are Proposed Design Solution, Equipment Compatibility, Qualifications and Experience, and Price. NAICS code 236220, Commercial and Institutional Building Construction; PSC Z2JZ, Repair Or Alteration Of Miscellaneous Buildings. The most recent amendment (0005, effective June 23) removed "(Brunswick)" from Amendment 0003 Question and Answer 16.
Notice text
The project includes all design and construction necessary to renovate and modernize the eight (8) lane Bowling Center (Bldg. 485) to include replacement of the existing pinsetter unit with new pinsetter unit to include string bowling, electronic gaming area and food operation including all demolition, installation, renovation, temporary construction and restoration necessary to produce a complete and useable facility.
The Work includes, but not limited to:
1. Site Investigation: The Contractor shall provide all surveys and perform all necessary site investigation utility locates (including, but not limited to, sub-surface utility “pot holing”) as required to complete the design and/or construction of the project. All site investigation activities shall be coordinated with appropriate Installation personnel through the Contracting Officer’s Representative (COR).
2. Site Development and Design: The Contractor shall provide complete architectural, civil, structural, mechanical, electrical, landscape and fire protection designs, required to construct the facility in accordance with all codes, laws and requirements. The Contractor shall refer to Section H for additional information regarding design submittal requirements.
3. Materials: The Contractor shall provide all materials, furnishings, equipment and fixtures, including all required accessories, necessary to produce a complete and useable facility. Additionally, the Contractor is responsible for all material handling, staging,
delivery/transportation, receipt confirmation, loading/unloading of all materials, including any lifting equipment required, during all phases of work.
Additional information provided in attached RFP.
Files
| File | Type | Posted |
|---|---|---|
| NAVMWR-26-R-0038-0005.pdf | ||
| NAVMWR-26-R-0038-0004.pdf | ||
| NAVMWR-26-R-0038-0003.pdf | ||
| NAVMWR-26-R-0038-0002.pdf | ||
| NAVMWR-26-R-0038-0001.pdf | ||
| NAVMWR-26-R-0038.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity