- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- 702 East Xavier Road Kirwin, Kansas 67644, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Interior Fish and Wildlife Service intends to solicit a boat ramp replacement project at Kirwin National Wildlife Refuge in Kansas, with solicitation expected July 1, 2026 and responses due July 31, 2026. This procurement is set aside for small businesses only.
The project requires demolition and replacement of three deteriorated concrete boat ramps (North Shore and South Shore structures) at 702 E. Xavier Road, Kirwin, Kansas 67644, including removal of two concrete boat docks totaling 1,490 square feet combined and extension of wave breaks by approximately 40 feet using riprap and geotextile underlayment. New ramps shall be 20 feet wide per lane with 6-inch concrete thickness, non-skid V-groove finish, slopes of 12–20 percent (preferred 14 percent), and reinforced concrete designed to support AASHTO HS-20 live loads. Concrete specifications require 4,000 psi minimum compressive strength with #4 epoxy-coated rebar. Above-water portions shall be pour-in-place concrete; below-water portions shall be precast and pushed. Preconstruction requirements include site assessment, mobilization planning, water control measures, soil erosion and sediment control to 95 percent maximum dry density per ASTM D 1557, and environmental protection with Best Management Practices and Clean Water Act compliance.
Performance period is 60 days after notice to proceed. Project magnitude is between $500,000 and $1 million. Award will be firm-fixed-price on a best-value tradeoff basis. Both payment and performance bonds are required, due within 10 calendar days after award. Contractors must be registered in SAM and complete online representations and certifications before the due date.
Notice text
Project Description: Boat Ramp Project at Kirwin NWR
Location:
Kirwin NWR (National Wildlife Refuge)
702 E. Xavier Road
Kirwin, KS 67644
Interested contractors must be registered in SAM (System for Award Management, www.sam.gov) and complete online representations and certifications before the solicitation response due date. Solicitation is expected to be posted on July 1, 2026. This project will be set aside for small businesses only.
Contract Type: Firm-Fixed Price
Project Magnitude: Between $500K and $1M
Period of Performance: 60 Days After Receipt of NTP
Bonds:
A bid bond is not required.
Contractors are reminded that any amount awarded over $35,000 requires submission of a Payment Bond. Any amount over $150,000.00 requires both payment and performance bonds. Bonds are due no later than 10 calendar days after award. Due to the project magnitude, both payment and performance bonds will be required.
Basis for Award: Tradeoff - Best Value
Files
| File | Type | Posted |
|---|---|---|
| A04_Statement_of_Work_Boat_Ramps_0044043673_2.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Boat Ramp Replacement Project at Kirwin NWR | Award Notice | |
| Boat Ramp Replacement Project at Kirwin NWR | Solicitation | |
| This notice | Pre-Solicitation | |
| Boat Ramp Replacement Project at Kirwin NWR | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity