BLM-CO DESIGN-BUILD River Operations Facility
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 140L4222R0001
- Agency
- Colorado Region Bureau of Land Management, Department of the Interior
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Colorado River Road Kremmling, Colorado 80459, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks design-build services for a Bureau of Land Management River Operations Facility project located in Grand County, Colorado. The BLM seeks proposals for architectural and engineering services to plan, design, demolish an existing 18x20 steel shed, and construct a new prefabricated modular building by July 2023. Proposals are due by July 7, 2022, with evaluation based on best value tradeoffs. Up to five offerors will be invited to submit Phase II proposals.
The solicitation is set aside entirely for SDVOSBs under NAICS code 236220, Construction of Commercial and Institutional Buildings, with a size standard of $39.5 million. The estimated budget is between $500,000 to $1,000,000, with services required from late July 2022 through July 2023 at the Pumphouse Recreation Site in Grand County, Colorado.
Notice text
4 versions
Update #4 · Latest ·
BLM-CO Design-Build River Operations Facility Phase II - Amend 3
The purpose of this amendment is record the pre-bid site visit with the notes on the SF-30, Add an Attachment for the water system and extend the responses due date until 7 July.
This is a solicitation for proposals. Response to this announcement is strictly voluntary; no reimbursement will be made for any costs associated with providing information in response to this announcement or any follow-up information requests.
The Bureau of Land Management is soliciting for a Two-Phase Design-Build project in accordance with FAR 36.3 to design, demolish and build a new River Operations Facility at the Pumphouse Recreation Site near Kremmling, CO.
The Government is conducting a competitive acquisition for this requirement for a firm-fixed price contract. Misrepresentation of size status or socio-economic category can result in penalties. All firms should be registered and active in www.SAM.gov.
Estimated Period of Performance: Late July 2022 - July 2023
Rough Order of Magnitude: Between $500,000 and $1,000,000 with the budget being toward the high end of the range.
Location: https://www.blm.gov/visit/pumphouse-recreation-site#:~:text=Pumphouse%20Recreation%20Site%20is%20located,of%20the%20Upper%20Colorado%20River .
Pre-Bid: A pre-bid site visit occurred on 22 June, 2022 at noon as previously advertised.
Summary of Work:
1.1 This project includes architectural and engineering services for Planning through Construction Document preparation, review of operations and programming, and construction and commissioning of a proposed BLM river operations facility(Title I, II, and III services, and Construction). The facility is located on BLM-owned land at the Pumphouse Recreation Site West of Trough Road in Grand County within the BLM Kremmling Field Office. The planning and design will be based on site review and assessment and discussions with BLM Kremmling Field Office (KFO). The contractor shall be responsible for developing integrated design solutions for this project and constructing a facility to meet those goals.
1.2 The BLM and the A/E contractor shall work together throughout the contract preparation to monitor projected construction costs and adjust the scope of work to meet the budgeted funding to avoid any redesign efforts after bidding.
1.3 The contractor shall be responsible for all site survey, site sub-surface survey, utility relocation, and existing equipment relocation. BLM shall be responsible for removing all stored goods from the existing shed prior to demolition.
2 Background:
2.1 The proposed River Operations Facility replaces an approximate 18 x 20 un-insulated steel shed. The existing shed houses storage items for the campground and river crew as well as a small water treatment room (approx. 5x10) for the campground.
Basic Contracting Requirements:
1. Active Registration www.sam.gov
2. Invoicing and Payment www.ipp.gov - 14 day prompt pay
3. FAR Part 36 Construction and A/E Provisions and Clauses
4. FAR Part 15 Contracting by Negotiation
5. Construction Wage Rates for Grand County
6. Total SDVOSB Set-Aside for NAICS 236220 - Size Standard: $39.5M
7. Basis for award: Best Value with Trade-offs See FAR 36.303
8. Maximum Number of Offerors who will be invited for Phase II - Five
POC: Contracting Specialist Robert Hall - rhall@blm.gov - 970-876-9038
Update #3 ·
BLM-CO Design-Build River Operations Facility Phase II
The purpose of this amendment is to announce Phase II. Phase I proposals have been reviewed and invitations have been emailed to the top vendors determined to be most highly qualified and capable. Only the vendors who submitted Phase I proposals and received an invitation are now eligible to continue with Phase II. A new responses due date has been established for 30 June so it does not interfere with the July 4th Weekend.
This is a solicitation for proposals. Response to this announcement is strictly voluntary; no reimbursement will be made for any costs associated with providing information in response to this announcement or any follow-up information requests.
The Bureau of Land Management is soliciting for a Two-Phase Design-Build project in accordance with FAR 36.3 to design, demolish and build a new River Operations Facility at the Pumphouse Recreation Site near Kremmling, CO.
The Government is conducting a competitive acquisition for this requirement for a firm-fixed price contract. Misrepresentation of size status or socio-economic category can result in penalties. All firms should be registered and active in www.SAM.gov.
Estimated Period of Performance: Late July 2022 - July 2023
Rough Order of Magnitude: Between $500,000 and $1,000,000 with the budget being toward the high end of the range.
Location: https://www.blm.gov/visit/pumphouse-recreation-site#:~:text=Pumphouse%20Recreation%20Site%20is%20located,of%20the%20Upper%20Colorado%20River .
Pre-Bid: A pre-bid site visit has been scheduled for 22 June, 2022 at noon.
Summary of Work:
1.1 This project includes architectural and engineering services for Planning through Construction Document preparation, review of operations and programming, and construction and commissioning of a proposed BLM river operations facility(Title I, II, and III services, and Construction). The facility is located on BLM-owned land at the Pumphouse Recreation Site West of Trough Road in Grand County within the BLM Kremmling Field Office. The planning and design will be based on site review and assessment and discussions with BLM Kremmling Field Office (KFO). The contractor shall be responsible for developing integrated design solutions for this project and constructing a facility to meet those goals.
1.2 The BLM and the A/E contractor shall work together throughout the contract preparation to monitor projected construction costs and adjust the scope of work to meet the budgeted funding to avoid any redesign efforts after bidding.
1.3 The contractor shall be responsible for all site survey, site sub-surface survey, utility relocation, and existing equipment relocation. BLM shall be responsible for removing all stored goods from the existing shed prior to demolition.
2 Background:
2.1 The proposed River Operations Facility replaces an approximate 18 x 20 un-insulated steel shed. The existing shed houses storage items for the campground and river crew as well as a small water treatment room (approx. 5x10) for the campground.
Basic Contracting Requirements:
1. Active Registration www.sam.gov
2. Invoicing and Payment www.ipp.gov - 14 day prompt pay
3. FAR Part 36 Construction and A/E Provisions and Clauses
4. FAR Part 15 Contracting by Negotiation
5. Construction Wage Rates for Grand County
6. Total SDVOSB Set-Aside for NAICS 236220 - Size Standard: $39.5M
7. Basis for award: Best Value with Trade-offs See FAR 36.303
8. Maximum Number of Offerors who will be invited for Phase II - Five
POC: Contracting Specialist Robert Hall - rhall@blm.gov - 970-876-9038
Update #2 ·
BLM-CO Design-Build River Operations Facility Phase I - Amendment 1
The purpose of this amendment is to clarify submission requirements and make a minor change to the Statement of Work. Details are included on the SF-30. Please make sure to acknowledge all amendments on the SF-1442.
This is a solicitation for proposals. Response to this announcement is strictly voluntary; no reimbursement will be made for any costs associated with providing information in response to this announcement or any follow-up information requests.
The Bureau of Land Management will be soliciting for a Two-Phase Design-Build project in accordance with FAR 36.3 to design, demolish and build a new River Operations Facility at the Pumphouse Recreation Site near Kremmling, CO.
The Government is conducting a competitive acquisition for this requirement for a firm-fixed price contract. Misrepresentation of size status or socio-economic category can result in penalties. All firms should be registered and active in www.SAM.gov.
Estimated Period of Performance: Late July 2022 - July 2023
Rough Order of Magnitude: Between $500,000 and $1,000,000 with the budget being toward the high end of the range.
Location: https://www.blm.gov/visit/pumphouse-recreation-site#:~:text=Pumphouse%20Recreation%20Site%20is%20located,of%20the%20Upper%20Colorado%20River .
Pre-Bid: A pre-bid video conference on MS Teams has held on 30 March at 10:00 to explain more about the project. If you have additional questions, please email them to the POC. A physical site visit will be scheduled for Phase II later when the weather is more hospitable.
IMPORTANT: Check www.sam.gov on the replacement of your DUNS number with the SAM issued Unique Entity Identifier (UEI) on April 4th. If you are in SAM already, it has been assigned to you. You will need to know it and reference it on all bid documents, capabilities narratives, etc.
Summary of Work:
1.1 This project includes architectural and engineering services for Planning through Construction Document preparation, review of operations and programming, and construction and commissioning of a proposed BLM river operations facility(Title I, II, and III services, and Construction). The facility is located on BLM-owned land at the Pumphouse Recreation Site West of Trough Road in Grand County within the BLM Kremmling Field Office. The planning and design will be based on site review and assessment and discussions with BLM Kremmling Field Office (KFO). The contractor shall be responsible for developing integrated design solutions for this project and constructing a facility to meet those goals.
1.2 The BLM and the A/E contractor shall work together throughout the contract preparation to monitor projected construction costs and adjust the scope of work to meet the budgeted funding to avoid any redesign efforts after bidding.
1.3 The contractor shall be responsible for all site survey, site sub-surface survey, utility relocation, and existing equipment relocation. BLM shall be responsible for removing all stored goods from the existing shed prior to demolition.
2 Background:
2.1 The proposed River Operations Facility replaces an approximate 18 x 20 un-insulated steel shed. The existing shed houses storage items for the campground and river crew as well as a small water treatment room (approx. 5x10) for the campground.
Basic Contracting Requirements:
1. Active Registration www.sam.gov
2. Invoicing and Payment www.ipp.gov - 14 day prompt pay
3. FAR Part 36 Construction and A/E Provisions and Clauses
4. FAR Part 15 Contracting by Negotiation
5. Construction Wage Rates for Grand County
6. Total SDVOSB Set-Aside for NAICS 236220 - Size Standard: $39.5M
7. Basis for award: Best Value with Trade-offs See FAR 36.303
8. Maximum Number of Offerors who will be invited for Phase II - Five
POC: Contracting Specialist Robert Hall - rhall@blm.gov - 970-876-9038
Update #1 ·
BLM-CO Design-Build River Operations Facility Phase I
This is a solicitation for proposals. Response to this announcement is strictly voluntary; no reimbursement will be made for any costs associated with providing information in response to this announcement or any follow-up information requests.
The Bureau of Land Management will be soliciting for a Two-Phase Design-Build project in accordance with FAR 36.3 to design, demolish and build a new River Operations Facility at the Pumphouse Recreation Site near Kremmling, CO.
The Government is conducting a competitive acquisition for this requirement for a firm-fixed price contract. Misrepresentation of size status or socio-economic category can result in penalties. All firms should be registered and active in www.SAM.gov.
Estimated Period of Performance: Late July 2022 - July 2023
Rough Order of Magnitude: Between $500,000 and $1,000,000 with the budget being toward the high end of the range.
Location: https://www.blm.gov/visit/pumphouse-recreation-site#:~:text=Pumphouse%20Recreation%20Site%20is%20located,of%20the%20Upper%20Colorado%20River .
Pre-Bid: A pre-bid video conference on MS Teams has held on 30 March at 10:00 to explain more about the project. If you have additional questions, please email them to the POC. A physical site visit will be scheduled for Phase II later when the weather is more hospitable.
IMPORTANT: Check www.sam.gov on the replacement of your DUNS number with the SAM issued Unique Entity Identifier (UEI) on April 4th. If you are in SAM already, it has been assigned to you. You will need to know it and reference it on all bid documents, capabilities narratives, etc.
Summary of Work:
1.1 This project includes architectural and engineering services for Planning through Construction Document preparation, review of operations and programming, and construction and commissioning of a proposed BLM river operations facility(Title I, II, and III services, and Construction). The facility is located on BLM-owned land at the Pumphouse Recreation Site West of Trough Road in Grand County within the BLM Kremmling Field Office. The planning and design will be based on site review and assessment and discussions with BLM Kremmling Field Office (KFO). The contractor shall be responsible for developing integrated design solutions for this project and constructing a facility to meet those goals.
1.2 The BLM and the A/E contractor shall work together throughout the contract preparation to monitor projected construction costs and adjust the scope of work to meet the budgeted funding to avoid any redesign efforts after bidding.
1.3 The contractor shall be responsible for all site survey, site sub-surface survey, utility relocation, and existing equipment relocation. BLM shall be responsible for removing all stored goods from the existing shed prior to demolition.
2 Background:
2.1 The proposed River Operations Facility replaces an approximate 18 x 20 un-insulated steel shed. The existing shed houses storage items for the campground and river crew as well as a small water treatment room (approx. 5x10) for the campground.
Basic Contracting Requirements:
1. Active Registration www.sam.gov
2. Invoicing and Payment www.ipp.gov - 14 day prompt pay
3. FAR Part 36 Construction and A/E Provisions and Clauses
4. FAR Part 15 Contracting by Negotiation
5. Construction Wage Rates for Grand County
6. Total SDVOSB Set-Aside for NAICS 236220 - Size Standard: $39.5M
7. Basis for award: Best Value with Trade-offs See FAR 36.303
8. Maximum Number of Offerors who will be invited for Phase II - Five
POC: Contracting Specialist Robert Hall - rhall@blm.gov - 970-876-9038
Attachments
| File | Type | Posted |
|---|---|---|
| Sol_140L4222R0001_Amd_0003.pdf | ||
| Attachment_4_-_2019_Pumphouse_Water_-_CO0225625_Monitoring_Plan_0003.pdf | ||
| Sol_140L4222R0001_Amd_0002.pdf | ||
| Sol_140L4222R0001_Amd_0001.pdf | ||
| Attachment_1_-_Plans.pdf | ||
| Attachment_3_-_Wage_Determination.pdf | ||
| Sol_140L4222R0001.pdf | ||
| Attachment_2_-_SOW.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| BLM-CO Design-Build River Operations Facility | Award Notice | |
| BLM-CO DESIGN-BUILD River Operations Facility | Solicitation | |
| BLM-CO Design-Build River Operations Facility | Pre-Solicitation | |
| BLM-CO Design-Build Pumphouse River Operations Facility | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity