This solicitation announcement describes a two-phase design-build contract opportunity for a Bureau of Land Management river operations facility project. The selected contractor will provide architectural and engineering services to plan, design, demolish existing structures, and construct a new prefabricated modular building at the Pumphouse Recreation Site in Grand County, Colorado between July 2022 and July 2023. The estimated budget is between $500,000 to $1 million. Interested parties must be registered in the System for Award Management and meet size standards for NAICS Code 236220. The opportunity is set aside for small disadvantaged veteran-owned small businesses. A maximum of five offerors will be selected to submit phase two proposals, which will be evaluated based on best value tradeoffs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L4222R0001_Amd_0003.pdf | ||
| Sol_140L4222R0001_Amd_0002.pdf | ||
| Sol_140L4222R0001_Amd_0001.pdf | ||
| Attachment_1_-_Plans.pdf | ||
| Sol_140L4222R0001.pdf | ||
| Attachment_2_-_SOW.pdf | ||
| Attachment_3_-_Wage_Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
02/22/2019 CO0225625 – BLM Pumphouse Recreation Site
BLM Pumphouse Recreation Site Monitoring Plan – PWSID#CO0225625 Page 1 of 45
Public Water System Monitoring Plan System Name BLM Pumphouse Recreation Site
PWSID
(Assigned by Department)
CO0225625
County Grand Describe Changes Updated
Submittal to the Department Submit Online (Preferred): wqcdcompliance.com/login Fax: 303-758-1398 WQCD – B2 – Drinking Water CAS 4300 Cherry Creek Drive South Denver, CO 80246-1530
Revisions Water systems are required to submit any changes to the Department within thirty (30) calendar days following the effective date of the change. If submitting revisions please only submit the individual section(s) that changed.
Monitoring Schedules All routine monitoring information, facilities and sample points (with state assigned IDs), system classification, and system source classification is available at wqcdcompliance.com/schedules.
Schedules are updated on a weekly basis and should be checked regularly for any changes.
Immediately call 303-692-3308 (or 1-877-518-5608 if after-hours) for:
1. Positive coliform or Positive E. coli.
2. Nitrate greater than or equal to 10.0 mg/L.
3. Nitrite greater than or equal to 1.0 mg/L.
BLM Pumphouse Recreation Site Monitoring Plan – PWSID#CO0225625 Page 2 of 45
Table of Contents
1.0 Contact Information
2.0 System Summary
3.0 Water Source Details
4.0 Water Treatment Codes/Details
5.0 Distribution System Details
6.0 Schematics and Maps
7.0 Records Locations
8.0 Routine Coliform Monitoring
9.0 Treatment Technique Triggers and Assessments
10.0 Routine Nitrate/Nitrite Monitoring
11.0 Instructions
12.0 Public Notifications for MCL and Monitoring Violations
Appendix A
Appendix B
BLM Pumphouse Recreation Site Monitoring Plan – PWSID#CO0225625 Page 3 of 45
1.0 Contact Information
Completed by: Blaine Vecchia, bvecchia@blm.gov
Certification of Accuracy: I hereby certify that the information is true, accurate, and complete to the best of my knowledge and belief. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment.
System Physical Address (Not Mailing) Address: Pumphouse Campground – 39.987499, -106.508916 City: n/a State: CO Zip: n/a System Phone: 970-724-3000d System Email: kdittlinger@blm.gov
Administrative Contact (AC) Name: Kenneth (Shane) Dittlinger
(The primary contact person for all Department mail or other communications regarding drinking water compliance) Mailing Address: 2103 E. Park Ave.
City: Kremmling State: CO Zip: 80459
Phone: 970-724-3003 E-mail: kdittlinger@blm.gov
Legally Responsible Water System Owner Name: Bureau of Land Management
(An individual, corporation, partnership, association, state or political subdivision thereof, municipality, or other legal entity) Mailing Address: 2103 E. Park Ave.
City: Kremmling State: CO Zip: 80459
Phone: 970-724-3003 E-mail: kdittlinger@blm.gov
Emergency Contact Name: Christopher Smith
(Someone the Department can contact in an emergency if the administrative contact is unavailable) Mailing Address: 2103 E. Park Ave.
City: Kremmling State: CO Zip: 80459
Phone: 970-724-3008 E-mail: c7smith@blm.gov
Operator is Responsible Charge-Main Contact: Kenneth (Shane) Dittlinger
(A certified operator designated by the owner to have ultimate responsibility for decisions regarding operational activities) Operator ID#: 35438 (not the certificate number) Phone: 970-724-3003 Email: kdittlinger@blm.gov
Operator is Responsible Charge-Alternate Contact: Christopher Smith
(A certified operator designated by the owner as the alternate to have responsibility for decisions regarding operational activities) Operator ID#: 35439 (not the certificate number) Phone: 970-724-3008 Email: c7smith@blm.gov
BLM-Colorado State Water Coordinator: Blaine Vecchia
(An individual, corporation, partnership, association, state or political subdivision thereof, municipality, or other legal entity) Mailing Address: 2815 H Road City: Grand Junction State: CO Zip: 81506
Phone: 970-549-6536 Email: bvecchia@blm.gov
BLM Pumphouse Recreation Site Monitoring Plan – PWSID#CO0225625 Page 4 of 45
2.0 System Summary
2.1 Population Types and Seasons
Completed by: Blaine Vecchia, bvecchia@blm.gov
Certification of Accuracy: I hereby certify that the information is true, accurate, and complete to the best of my knowledge and belief. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment.
Service Connections provide water through a pipe or constructed conveyance for human consumption which includes drinking, showering, hand-washing, or cooking. Examples of service connections: single family homes, a metered multi-family dwelling unit, a business building, a mobile home trailer, or camp spigot.
Resident Population is the number of people who live there.
Resident Population: n/a
Non-Transient Population is the number of same people who have regular opportunity to consume the water for six months or more per calendar year, but do not reside there. These are usually students or employees. Regular opportunity is defined as four or more hours per day, for four or more days per week, for six months or more per year.
Non-Transient Population: n/a
Transient Population is the daily average number of people who have an opportunity to consume the water, but are not residents or non-transients. These are customers, visitors, or seasonal employees
If your transient population varies by season you may specify multiple seasonal populations, otherwise enter January and December for the months.
Average Transients per season; Estimated 1000-2000/season – Typical months system is in use April to October
If you need assistance, please call (303) 692-3556 or visit colorado.gov/cdphe/dwcontact.
Definitions of the terms used in this form may be found in 5 CCR 1002-11 (Regulation 11) available at colorado.gov/cdphe/water-quality-control-commission-regulations.
BLM Pumphouse Recreation Site Monitoring Plan – PWSID#CO0225625 Page 5 of 45
2.2 System Description
The Pumphouse Campground water system is a small water system that is used to supply water to campground users and BLM personal. The campground is located along the Colorado River approximately 13 miles south west of Kremmling, CO. The system is supplied water from a single well. The distribution system consists of two separate buried water lines. The system is a seasonal system which is typically open April-October depending on temperatures. The system is drained at the end of each season.
2.3 Water Types
Groundwater (GW) – Any water under the surface of the ground being neither “surface water” nor “groundwater under the direct influence of surface water.”
2.4 Availability
Seasonal (S) – A water facility that is typically used every year to aid a system in meeting high water demands. While a water system may not know when it will need a seasonal source, it is most often used every year. These also may be referred to as peaking facilities. Routine sampling will be required at the Entry Point to the Distribution System.
3.0 Water Source Details
Groundwater Sources Facility ID
(Assigned by Department)
Name Availability (P, E, I, or S)
If seasonal, include months anticipated to be in operation
DNR Permit #
- Aquifer
Name
Well Depth at
Completion n/a S April-October #116368 140’
BLM Pumphouse Recreation Site Monitoring Plan – PWSID#CO0225625 Page 6 of 45
4.0 Water Treatment Codes/Details
The codes below are generated by the USEPA for the purpose of standardizing the treatment processes as they are cataloged and tracked within the federal and state database programs. Water systems should have individual process flow diagrams for treatment; from these diagrams, each process should have an associated name. If you struggle to understand the different treatment codes below, please contact the Division’s Engineering Section for assistance.
4.1 Water Treatment Codes
DISINFECTION
GASEOUS CHLORINATION (401)
HYPOCHLORINATION BLEACH (421)
CHLORAMINES (200)
CHLORINE DIOXIDE (220)
ULTRAVIOLET RADIATION (720)
OZONATION (541)
CONTACT TIME PROVIDED (825)
FILTRATION
ANION EXCHANGE (836)
CATION EXCHANGE (835)
FILTRATION, BAG (801)
FILTRATION, BAG - ROUGHING (810)
FILTRATION, CARTRIDGE (341)
FILTRATION, CARTRIDGE - ROUGHING (865)
FILTRATION, MICROFILTRATION (895)
FILTRATION, PRESSURE SAND (344)
FILTRATION, RAPID SAND (345)
FILTRATION, ULTRAFILTRATION (347)
FILTRATION,GREENSAND (343)
NANOFILTRATION (890)
NATURAL OR RIVERBANK FILTRATION (GWUDI) (826)
REVERSE OSMOSIS (640)
PRETREATMENT, COAGULATION AND SEDIMENTATION
AERATION (820)
ACTIVATED CARBON, GRANULATED (121)
ACTIVATED CARBON, POWDERED (125)
COAGULATION (240)
DISSOLVED AIR FLOTATION (880)
FLOCCULATION (360)
HYDRAULIC JET MIXING (831)
IN LINE STATIC MIXING (830)
MICROSCREENING (520)
PERMANGANATE (560)
PRESEDIMENATION (840)
RAPID MIX (600)
SEDIMENTATION (660)
UPFLOW CLARIFIER (845)
OTHER FORMS OF TREATMENT
ACTIVATED ALUMINS (100)
ALGAE CONTROL (160)
BLENDING (896)
FLUORIDATION (380)
INHIBITOR, SILICATE (449)
INHIBITOR/SEQUESTERING AGENT, PHOSPHATE BASED (815)
PEROXIDE (580)
PH ADJUSTMENT - SUPPRESION (847)
PH ADJUSTMENT - ELEVATION (848)
REDUCING AGENT (620)
BLM Pumphouse Recreation Site Monitoring Plan – PWSID#CO0225625 Page 7 of 45
4.2 Water Treatment Details
Treatment Plants
Facility ID (Assigned by Department)
Plant Name Availability (P, E, I, or S)
If seasonal, include months anticipated to be in operation
Contributing Sources Facility IDs and Names n/a S April-Octoberr n/a
Treatment Codes (see previous page for codes)
HYPOCHLORINATION BLEACH (421)
FILTRATION, CARTRIDGE (341)
Provide a Detailed Description of the Water Treatment System (including descriptions of tanks used for disinfection contact time)
Well water is pumped through sediment filter and then through a proportional chemical injection system.
NSF certified Sodium Hypochlorite (bleach) is dosed proportionally with water systems flow. Treated water enters a pressure tank and from there into a 120 gallon baffled contact/storage tank prior to distribution.
Note – Sodium Hypochlorite (bleach) degrades over time. Policy recommendation for changing the chlorine/water mixture in the Chlorine Solution Tank is every 30 days, with the maximum replacement time of 60 days. Instructions on how to mix chlorine/water solution can be found in Section 11.8.
BLM Pumphouse Recreation Site Monitoring Plan – PWSID#CO0225625 Page 8 of 45
5.0 Distribution System Details
5.1 Definitions
Entry point –A location before or at the first customer which is representative of treated (finished) water. The entry point may represent treated water from multiple treatment plants and/or multiple sources. Sometimes the water treatment plant is the first tap.
Distribution system storage facility – Any treated (finished) water storage tank at the treatment plant or in the distribution system that is not considered part of disinfection contact time (i.e.
after the entry point).
5.2 Distribution System Information
The distribution systems consist of 2 independent buried water lines. Waterline #1 and Waterline #2. Each waterline branches from the main treated waterline immediately downstream of the disinfection system.
BLM Pumphouse Recreation Site Monitoring Plan – PWSID#CO0225625 Page 9 of 45
6.0 Schematics and Maps
6.1 Water System Site Plan
BLM Pumphouse Recreation Site Monitoring Plan – PWSID#CO0225625 Page 10 of 45
6.2 Launch 2 Site Plan-Well and Storage Building
BLM Pumphouse Recreation Site Monitoring Plan – PWSID#CO0225625 Page 11 of 45
6.3 Disinfection System Layout
BLM Pumphouse Recreation Site Monitoring Plan – PWSID#CO0225625 Page 12 of 45
7.0 Records Locations
These records must be made available for inspection for Department staff during site visits.
Type of Record Location Address Retain no less than…
Total Coliform (TCR) and Fecal Coliform/E. coli results AND distribution system residual disinfection monitoring results
BLM 2103 E. Park Ave, Kremmling Co 5 years
Revised TCR (RTCR) assessment forms or corrective actions as a result on an assessment, or other available summary documentation of the sanitary defects and corrective actions
BLM 2103 E. Park Ave, Kremmling Co 5 years after completion of the assessment or corrective action
Violations of Regulation 11, including corrective action
BLM 2103 E. Park Ave, Kremmling Co 3 years after corrective action is completed
Sanitary surveys, including any written reports, summaries or correspondences
BLM 2103 E. Park Ave, Kremmling Co 10 years
Variances or exemptions granted by the Department
BLM 2103 E. Park Ave, Kremmling Co 5 years after expiration
Public notices and consumer confidence reports, including certification
BLM 2103 E. Park Ave, Kremmling Co 3 years
Individual rule sampling plans BLM 2103 E. Park Ave, Kremmling Co 10 years Corrective actions taken for the Groundwater Rule
BLM 2103 E. Park Ave, Kremmling Co 10 years
Invalidation of fecal indicator-positive groundwater source samples for the Groundwater Rule
BLM 2103 E. Park Ave, Kremmling Co 5 years
For systems conducting compliance monitoring for the Groundwater Rule
● Department-specified minimum disinfectant residual
BLM 2103 E. Park Ave, Kremmling Co 10 years
Nitrate and Nitrite analyses results BLM 2103 E. Park Ave, Kremmling Co 10 years
BLM Pumphouse Recreation Site Monitoring Plan – PWSID#CO0225625 Page 13 of 45
8.0 Routine Coliform Monitoring
The Total Coliform Rule may be found in 5 CCR 1003-1, Article 5.
Residual disinfectant requirements may be found in 5 CCR 1003-1, Articles 7 and 13.
8.1 Laboratory Information
Preferred lab: Three Lakes Water and Sanitation District
Address: 1111 County Road 48 (Golf Course Road) Grand Lake, CO 80447
Phone: 970-627-3448
Alternate lab: CDPHE Laboratory Service Division
Web Address:
https://docs.google.com/forms/d/e/1FAIpQLScdrb4VLpvHX8kaDWfDMGEJ8dPA05p4au_4fWH9it_8p R0iRQ/viewform?fbzx=-6678512966821793000
Phone: 303-692-3048
8.2 Routine Sampling Information
Number of routine total coliform samples to be collected each month: 3/Month, see “Table 1” for sample locations.
Seasonal systems must obtain a safe total coliform result approximately 10 days prior to opening for the season. For complete instruction of startup for the water system, see “Start-up Procedures for BLM Pumphouse Recreations Site Water System”.
The routine samples represent the entire distribution system. Raw Water Tap represents water quality in the well, Treated Water Tap represents the chlorinated water (Treated Water). Taps #1, #2, #3 represent water quality within Waterline #1. Taps #4, #5, #6 and #7 represent water quality within Waterline #2.
Samples shall be taken during the first week of each month, and taken early in the day, early in the week and as noted for seasonal start up.
The total coliform MCL is exceeded for this system if there are 1 or more positive sample in a calendar month.
BLM Pumphouse Recreation Site Monitoring Plan – PWSID#CO0225625 Page 14 of 45
Table 1 - Coliform Sample Tap Locations
Tap Name Start Up or Month
Raw Water Tap Treated Water Tap
Tap #1 Tap #7
Start-Up
Treated Water Tap
Tap #2 Tap #6
May
Tap #3 Tap #5
June
Tap #1 Tap #4
July
Tap #2 Tap #7
August
Tap #3 Tap #6
September
Tap #1 Tap #5
October
8.3 Actions To Be taken When Routine Coliform Samples are NOT Taken
1. If a monthly samples are not taken, a Tier 3 public notification must be prepared and posted. See Section 12.0, Public Notifications and Appendix A for detailed guidance on the required content and when the notice must be posted.
2. Ensure the notification is signed on the second page by the Field Office Manager. This certifies that the notification has been prepared and posted in accordance with the appropriate regulations. Send a copy of the signed notification to CDPHE Drinking Water Program within 10 days of posting.
3. Post the completed public notification on all information kiosks at the campground within 30 days.
4. File a copy of the public notification with the monitoring results.
8.4 Actions To Be taken When Routine Coliform Sample Tests Positive
1. Ensure that the laboratory tests the sample for E. coli. State-certified laboratories should test positive total coliform samples for E. coli automatically, but the water system should verify that this has been completed.
2. Take 3 repeat samples plus 1 Ground Water Rule-triggered monitoring sample within 24 hours of notification of a positive routine sample.
3. To comply with the Ground Water Rule, after a positive coliform result, in addition to the three repeat samples, a sample must be taken from the well or sample tap closest to the well prior to
BLM Pumphouse Recreation Site Monitoring Plan – PWSID#CO0225625 Page 15 of 45 treatment. The Ground Water Rule refers to this sampling as triggered monitoring. Therefore, in the event of a positive coliform sample, the system must sample the tap closest to the source prior to treatment. The sample tap closest to the well is “Tap #1”.
4. Repeat samples shall be taken from the same tap as the original positive coliform sample and at the taps as shown in the “Repeat Coliform Sample Taps” shown on Table 2.
5. Repeat sample process must be repeated until a complete set of repeat samples are total coliform negative.
6. Attempt to find the cause or source of the positive result.
7. If the sample is positive for E. coli, the water system is to be immediately shutdown to prevent use.
Notify CDPHE Drinking Water Program, BLM Field Office Manager, and State Water Coordinator within 24 hours of the positive result. The water system must remain shut down until samples are absent of coliforms.
8.5 Repeat Coliform Monitoring
1. Collect three repeat coliform samples plus one Ground Water Rule-triggered monitoring sample from the predetermined sample taps indicated in the “Repeat Coliform Sample taps” table below. Collect repeat samples within 24 hours of being notified of the positive result by the laboratory.
Table 2 - Repeat Coliform Sample Taps
Tap Number/Name
Month/Routine Sample Taken
Repeat and Ground Water Rule Sample Taps
Start-Up Raw Water Tap Positive Sample Raw Water Tap Treated Water Tap 1 7
Treated Water Tap Positive Sample Raw Water Tap Treated Water Tap 1 7 1 Positive Sample Raw Water Tap Treated Water Tap 1 3 7 Positive Sample Raw Water Tap Treated Water Tap 7 4 May
Treated Water Tap Positive Sample Raw Water Tap Treated Water Tap 1 7 2 Positive Sample Raw Water Tap Treated Water Tap 1 3 6 Positive Sample Raw Water Tap Treated Water Tap 7 4 June
Treated Water Tap Positive Sample Raw Water Tap Treated Water Tap 1 7 3 Positive Sample Raw Water Tap Treated Water Tap 1 2 5 Positive Sample Raw Water Tap Treated Water Tap 7 4 July
Treated Water Tap Positive Sample Raw Water Tap Treated Water Tap 1 7 1 Positive Sample Raw Water Tap Treated Water Tap 3 2 4 Positive Sample Raw Water Tap Treated Water Tap 5 7 August
Treated Water Tap Positive Sample Raw Water Tap Treated Water Tap 1 7 2 Positive Sample Raw Water Tap Treated Water Tap 1 3 7 Positive Sample Raw Water Tap Treated Water Tap 6 4 September
Treated Water Tap Positive Sample Raw Water Tap Treated Water Tap 1 7 3 Positive Sample Raw Water Tap Treated Water Tap 1 2 6 Positive Sample Raw Water Tap Treated Water Tap 4 7 October
Treated Water Tap Positive Sample Raw Water Tap Treated Water Tap 1 7 1 Positive Sample Raw Water Tap Treated Water Tap 3 2 5 Positive Sample Raw Water Tap Treated Water Tap 4 7
BLM Pumphouse Recreation Site Monitoring Plan – PWSID#CO0225625 Page 16 of 45
2. If any or all of the three repeat samples are not taken or if the Ground Water Rule-triggered monitoring sample is not taken complete the following:
a. Perform a Level 1 assessment. See Section 9.0, Treatment Technique Triggers and
Assessments and Appendix B for detailed guidance on how to perform the assessment.
b. Prepare a Tier 3 public notification and post it on all kiosks or bulletin boards located within the campground within 30 days (See Section 12.0, Public Notifications, and Appendix A).
Ensure the notification is signed on the second page by the Field Office Manager. This certifies that the notification has been prepared and posted in accordance with the appropriate regulations.
c. Send a copy of the certified public notification that was signed by the BLM Field Office Manager to CDPHE-Drinking Water Program within 10 days of posting the public notification.
d. File a copy of the public notification, including the certification and the letter that accompanied the notification to CDPHE-Drinking Water Program with the monitoring results.
8.6 Actions to be Taken if One or More Repeat Samples Tests Positive for Total Coliform
1. If one or more of the repeat samples tests positive for total coliforms ONLY, a Level 1 Assessment must be performed within 30 days. See Section 9.1, When and How to Perform a Level 1 Assessment, and Appendix B for detailed guidance. This is referred to as a “triggered assessment” and the maximum contaminant level (MCL) is NOT violated. NOTE: If a second Level 1 assessment is triggered within a 12-month rolling period, a Level 2 assessment must be performed.
2. Inform the CDPHE Drinking Water Program, BLM Field Office Manager and State Water Coordinator within 24 hours of the positive repeat sample, clarify that the results were positive for total coliforms only, and that a Level 1 assessment will be performed.
3. Document guidance received from CDPHE-Drinking Water Program if applicable.
8.7 Actions to be Taken when Monthly or Repeat Samples Test Positive for E. coli or One or More Repeat Samples Test Positive for Total Coliforms
1. If the sample tests positive for E. coli, the water system is to be immediately shutdown and all taps closed to prevent their use. Notify CDPHE Drinking Water Program, BLM Field Office Manager and State Water Coordinator within 24 hours of the positive result. The water system must remain closed until samples are absent of coliforms. Document guidance received from CDPHE Drinking Water Program and BLM personal.
2. Document guidance received from CDPHE-Drinking Water Program, local management, and BLM State Water Coordinator, noting the actual guidance received, date, and time of the call. Document the same information even if it is provided in a voice mail.
3. Implement the guidance provided by CDPHE-Drinking Water Program, local management, and BLM State Water Coordinator.
4. Prepare a Tier 1 public notification and post it on all information kiosks and bulletin boards within the campground within 24 hours (See Section 12.0, Public Notifications, and Appendix A).
5. Ensure the notification is signed by the Field Office Manager.
6. Send a signed copy of the notification to CDPHE Drinking Water Program within 10 days of posting and file a copy of the public notification with the monitoring results.
7. Arrange to have CDPHE Drinking Water Program or a 3rd party approved by CDPHE to perform a Level
2 assessment within 30 days. See Section 6.3, How to Perform a Level 2 Assessment, and Appendix B for detailed guidance.
BLM Pumphouse Recreation Site Monitoring Plan – PWSID#CO0225625 Page 17 of 45
8. Ensure that the Level 2 assessment is performed, corrective actions are completed, and documentation of their completion is sent to CDPHE Drinking Water program within 30 days of the triggering of the Level II assessment. If all of these items cannot be completed within 30 days negotiate a schedule for their completion with CDPHE-Drinking Water Program.
If unsure as to what must be done, consult Table 3 to determine whether a Level 1 or Level 2 assessment is triggered and if a public notification must be prepared and posted. See Section 9.0, Treatment Technique Triggers and Assessments, for detailed guidance on performing the assessment. See Section 12.0, Public Notifications, and Appendix A for detailed guidance on the required content and when the notice must be posted.
8.8 Routine Monitoring After a Positive Sample
Seasonal systems on monthly monitoring schedules are no longer required to collect “temporary routine” bacteriological samples the following month after a total coliform-positive sample result.
Return to routine monthly monitoring.
Table 3 – Assessment and Public Notification Triggers
Routine total coliform
Routine E. coli
Repeat total coliform
Repeat E. coli
Level 1 Assessment
Level 2 Assessment
Public Notification absent N/A N/A N/A No No No positive absent absent absent No No No positive absent positive absent Yes No No positive positive absent absent No No No positive positive positive absent No Yes Yes positive absent positive positive No Yes Yes positive positive positive positive No Yes Yes
8.9 Residual Disinfectant Monitoring
Distribution System Residual Disinfectant Monitoring The residual disinfectant must be measured at the same time and the same location as each total coliform bacteria sample. Measurements must be conducted in the field by a certified operator or under the direction of the certified operator and must be written on each total coliform chain of custody when it is submitted to the laboratory.
Disinfectant used in the distribution system: Sodium Hypochlorite (bleach)
Residual disinfectant quality assurance/quality control (QA/QC) – explain the exact procedures to be followed to ensure that the field test measurement will be accurate. This may be found in the manufacturer’s literature: Free chlorine residual shall be measured as instructed by the Hach Pocket II Colorimeter instruction manual. Samples shall be taken at the Treated Water Tap and each of the samples tap designated for the start-up or scheduled monthly coliform bacteria sample. See locations for samples on Table 1.
BLM Pumphouse Recreation Site Monitoring Plan – PWSID#CO0225625 Page 18 of 45
After system disinfections as described in the start-up procedures, and before opening of the water system, multiple free chlorine residual samples may be required while adjusting the free chlorine residual to be within acceptable limits. Free chlorine residual shall not fall below 0.2mg/L or exceed 4.0 mg/l while supplying water to users.
8.10 Residual Disinfectant Monitoring Treatment Technique Compliance Determination
The system is required to maintain a detectable residual disinfectant level in the distribution system. The minimum detectable level is 0.2mg/L.
BLM Pumphouse Recreation Site Monitoring Plan – PWSID#CO0225625 Page 19 of 45
9.0 Treatment Technique Triggers and Assessments
Water systems are required to perform and document assessments to identify and correct defects that could provide a pathway of entry for microbial contamination into the distribution system or that are indicative of a failure or imminent failure in a barrier that is already in place.
There are two levels of triggered assessments, Level 1 and Level 2. The assessment level depends on the trigger’s potential impact to public health.
9.1 When and How to Perform a Level 1 Assessment
A Level 1 assessment is triggered if one of the following occurs:
A routine sample tests positive for only total coliforms and one or more of the repeat samples tests positive for only total coliforms; or All three repeat samples and the Ground Water Rule-triggered monitoring sample are not collected following a positive coliform sample.
1. A Level 1 assessment is a basic examination of the source water, treatment, distribution system, and relevant operational practices. It is intended as a self-assessment and is typically performed by a person or persons responsible for the system or with BLM personnel who are knowledgeable of the water system, or approved CDPHE Drinking Water program third-party consultants.
2. Perform and document the assessment within 30 days of the trigger.
3. Public water systems are required to follow CDPHE Drinking Water Program Level 1 Assessment procedures. See Appendix B for more information.
9.2 When to Perform a Level 2 Assessment
1. Any of the three repeat samples or the Ground Water Rule-triggered monitoring sample test positive for E. coli;
2. A routine sample tests positive for E. coli and any of the repeat samples test positive for E. coli or total coliform. This means that a Level 2 Assessment must be completed if any of the repeat samples test positive for coliforms, even if all the repeat samples test negative for E. coli.
3. Failure to take all required repeat samples following a routine sample that tests positive for E. coli;
4. Failure to test for E. coli following any repeat samples that test positive for coliform;
5. A second Level 1 assessment is required within a rolling 12-month period. Instead of performing a second Level 1 assessment, a Level 2 assessment is required. See Appendix B for more information.
9.3 How to Perform a Level 2 Assessment
1. Inform CDPHE Drinking Water Program, BLM Field Office Manager and BLM State Water Coordinator that a Level 2 assessment is required. Follow and document guidance received.
2. Ensure that the Level 2 assessment is performed, complete the Level 2 Assessment form as shown in
Appendix B. Document all the corrective actions that were taken and ensure all actions are completed within 30 days of the assessment being triggered.
9.4 Actions Required Following a Level 1 or Level 2 Assessment
BLM Pumphouse Recreation Site Monitoring Plan – PWSID#CO0225625 Page 20 of 45
1. Correct sanitary defects found through either a Level 1 or Level 2 assessment within 30 days. A sanitary defect is defined as “a defect that could provide a pathway of entry for microbial contamination into the distribution system or that is indicative of a failure or imminent failure in a barrier that is already in place.”
2. If the sanitary defect cannot be corrected within 30 days, contact CDPHE Drinking Water Program, BLM Field Office Manager, BLM State Water Coordinator, and the CASHE Program Lead for guidance, keeping in mind that all corrective actions should be completed as soon as feasible.
9.5 Coliform Treatment Technique Violations
If a Level 1 or Level 2 assessment is not performed within 30 days after a trigger or if any sanitary defects identified during the Level 1 or Level 2 assessment are not corrected within 30 days, or in accordance with a schedule acceptable to State Water Coordinator and the CASHE Program Lead, complete the following:
1. Inform the CDPHE Drinking Water program, BLM Field Office Manager and BLM State Water Coordinator that the assessment was not performed or the corrective action was not completed and ask for further guidance.
2. Prepare a Tier 2 public notification and post it on all information kiosks and bulletin boards in the Campground within 30 days (See Section 12.0, Public Notifications, and Appendix A). Ensure the notification is signed by the Field Office Manager.
3. Send a copy of the certified public notification that was signed by the Field Office Manager to CDPHE-Drinking Water Program within 10 days of posting the public notification.
4. File a copy of the public notification, including the signed certification and the letter that accompanied the notification to CDPHE-Drinking Water Program, with the monitoring results
10.0 Routine Nitrate/Nitrite Monitoring
10.1 Laboratory Information
Preferred lab: ACZ Laboratories, Inc.
Web Address: 2773 Downhill Drive, Steamboat Springs, CO 80487
Phone: 800-334-5493, sales@acz.com
Alternate lab: CDPHE Laboratory Service Division
Web Address:
https://docs.google.com/forms/d/e/1FAIpQLScdrb4VLpvHX8kaDWfDMGEJ8dPA05p4au_4fWH9it_8p R0iRQ/viewform?fbzx=-6678512966821793000
Phone: 303-692-3048
The MCL for Nitrate is 10.0 mg/L measured as nitrogen.
10.2 Nitrate Sampling
BLM Pumphouse Recreation Site Monitoring Plan – PWSID#CO0225625 Page 21 of 45
Collect the annual samples within the first month after the water system being opened.
1. Collect one sample from the Raw Water tap in the storage building.
2. Take the sample using the container provided by the laboratory.
3. If a nitrate sample is not taken, prepare and post a public notification at all information kiosks and bulletin boards within the campground. See Section 12.0 Public Notifications for MCL and Monitoring Violations, and Appendix A for detailed guidance on the required content and when the notice must be posted.
4. File a copy of the public notification, including the signed certification, with the monitoring results.
10.3 Actions Taken if Annual Nitrate Sample Exceeds the MCL of 10.0 mg/L
1. Take a confirmation sample within 24 hours of receiving the notification from the lab that the initial sample result exceeded the MCL.
2. If a confirmation sample is not taken within 24 hours, the water system is to be immediately shutdown and all taps closed to prevent their use, and prepare a public notification and post on all information kiosks and bulletin boards within the campground. The notification must state that the nitrate MCL has been violated and the notification must be posted on site within 24 hours. Under this circumstance, a repeat sample must be taken and analyzed within 2 weeks of receiving the initial MCL violation notification.
3. If the average of the initial and confirmation sample is below 10 mg/L no further action is necessary.
4. If the average of the initial and confirmation sample results exceeds the MCL, ensure the water system remains shutdown and all taps closed to prevent their use and prepare/ensure a public notification is posted on all the information kiosks and bulletin boards throughout the campground.
5. Public notification to be prepared using the form provided in Appendix A. See Section 9.0, Public Notification, for detailed guidance on the required content and when the notice must be posted. Ensure the notification is signed by the Field Office Manager.
6. Inform the Field Office manager and State Water Coordinator of the Nitrate MCL violation.
They must be informed of MCL violations within 24 hours of being notified by the laboratory of the MCL violation.
10.4 Nitrite Monitoring
CDPHE Drinking Water Program Nitrite sampling requirements for transient, non-community water systems is every 3 years, however so as not to overlook the 3-year cycle, BLM policy for nitrite sampling is sampling shall be taken every year at the same time and location as the nitrate sample.
The MCL for nitrite is 1.0 mg/L measured as nitrogen.
If MCL exceeds 1.0 mg/L for Nitrite, perform the actions required for exceeding the Nitrate MCL violation.
BLM Pumphouse Recreation Site Monitoring Plan – PWSID#CO0225625 Page 22 of 45
11.0 Instructions
The Revised Total Coliform Rule, provided in section 11.16 of Regulation 11, became effective April 1, 2016, and included:
A definition for a seasonal system public water system.
A NEW requirement that seasonal systems must complete department-approved start-up procedures each season.
11.1 System Inspection and Integrity Check
a. Look for any damage or evidence of contamination associated with any part of the waterworks that may have occurred during the offseason.
b. Inspect the wellhead and verify that the well casing is structurally sound, the well cap is tightly attached, vents are downturned with intact screens, and the electrical conduit is securely in place. Inspect the area surrounding the wellhead.
c. Inspect the water treatment equipment and tubing. Inspect storage and pressure tanks, plumbing lines, and fitting. Do a walk-through of the water distribution systems. Look at pipes, valves, and backflow prevention devices – ensure such devices have been appropriately tested. Ensure that all components of the water system operate correctly, and are repaired/replaced as needed.
11.2 Charging the Distribution System
a. Place signs on all spigots and hydrants in the water system stating, “Warning: Do Not Drink Water - Water System Maintenance Being Performed”.
b. Close all drain valves, #1-#5, by removing the plastic covers from drain valve boxes to expose curb stop. Place the curb stop key onto curb stop and turn clockwise 90 degrees until valve is closed. Note: not all curb stops are visible within standpipes, lower curb key as needed into standpipes until curb stop is located and key fits securely onto curb stop.
c. Inside of the storage building, close the valve directly upstream of the filter on the proportional injections panel. Close the drain valves on the pressure and contact tanks. Verify fitting on waterlines within the disinfection system are attached, i.e.
unions, etc. Place a bucket under the Raw Water tap or install piping below the Raw Water Tap and extend outside and downslope of the building for discharge of water.
d. Install a new sediment filter, inspect “O” ring and replace “O” ring if cracked or damaged.
e. Locate the electrical circuit panel and turn on circuit breakers for “Well Pump”.
Open the Main Water Valve and then the Raw Water Tap, to start water flowing.
Allow water to flow until water runs clear, then close Raw Water Tap. Open the valve directly upstream to the filter on the proportional injections panel.
f. On Waterline #1, hold open Taps #1, #2, and #3 on. (Use duct tape or wire, etc. to hold taps open.)
g. In storage building, slowly open Waterline #1 Valve to a maximum of ¼ open, BLM Pumphouse Recreation Site Monitoring Plan – PWSID#CO0225625 Page 23 of 45 allow water to flow approximately 2-3 minutes before fully opening. (Note:
Waterlines #1 and #2 valves are not shown on the “Disinfections System Photo” but are near the Treated Water Tap and are marked for identification.)
h. Allow water to flow through Waterline #1 for approximately 5-10 minutes to purge trapped air, and then close all spigots.
i. On Waterline #2, open Taps #4, #5, #6 and #7. (Use duct tape or wire, etc. to hold taps open.)
j. In storage building, slowly open to a maximum of ¼ in the open position, the Waterline #2 Valve” and allow water to flow approximately 2-3 minutes before fully opening. (Note: Waterlines #1 and #2 valves are not shown on the “Disinfections Photo” but are near the Treated Water Tap and are marked for identification.)
k. Allow water to flow through Waterline #2 for approximately 5-10 minutes to purge trapped air, and then close all hydrants/spigots.
11.3 Integrity Check
a. Leaks in the waterworks, especially in buried piping, provide potential conduits for contaminants to enter when the water system is drained or when system pressure is lost. To help gain a better understanding of leakage within the distribution system(s), conduct an integrity check once the system is re-pressurized as follows:
i. After filling the system with water and with all the taps turned off, switch off the power supply to the well pump. Read the water system’s pressure gauge and note the initial system pressure.
ii. After one hour, read the pressure gauge again and document the system pressure. Any pressure loss over this one hour time span indicates leaks. The pressure must remain within 15% of the original pressure.
iii. Some system leakage is to be expected; however, if pressure loss is greater than 15%, the leak must be found and repaired.
iv. Ensure that repaired/replaced distribution system components are properly disinfected (see the section below that addresses system disinfection) prior to serving water.
vi. Comparing pressure loss data from year to year can provide insight into the relative degree of leakage within the distribution systems.
11.4 System Disinfection and Flushing
a. Disinfection of waterworks is a required step in the start-up procedure.
i. Add 3 gallons of well water to the Chlorine Solution Tank along with 5 cups of
NSF Certified 8.25% bleach. (Note: Use only NSF Certified, un-scented bleach). Place tubing into Chlorine Solution Tank and verify tubing is connected properly to the Proportional Injection Panel as described in the manufacturer’s instructions. Plug panel into the outlet above the Proportional Injection Panel. Remove air from tubing as instructed in the manufacturer’s instructions. Set the control knob on the pump control located in the upper left portion of the panel to approximately 50%. Verify chlorine is being pumped into the system.
BLM Pumphouse Recreation Site Monitoring Plan – PWSID#CO0225625 Page 24 of 45
b. For seasonal systems that consist of buried water lines, the Department requires highly chlorinated water be used in accordance with American Waterworks Association (AWWA) published standards. Chlorine residual must be greater than 10mg/L after each segment of the waterworks is isolated for at least 12 hours.
i. Adjust the chlorine injection pump or increase the amount of chlorine in the chlorine solution tank until the chlorine residual is 10.0 mg/L or greater and fill all distribution lines with the chlorinated water. Allow this water to remain in the distribution system for a minimum of 12 hours.
ii. After system disinfection, be sure that any highly concentrated chlorine is flushed from the system prior to collecting the sample to be analyzed.
iii. Once disinfection is completed, the water system must be operated and allowed to return to the typical level of background chlorine residual prior to serving customers. Per Regulation 11 and effective April 1, 2016, free chlorine residual must be greater than or equal to 0.2 mg/L throughout the distribution system.
iv. Add an additional water (8-12 gallons) of well water to the solution tank and adjust the chlorine injection pump as needed to decrease the free chlorine residual so that it is greater than 0.2 mg/L but less than 4.0 mg/L. The desired free chlorine level at the “Treated Water Tap” is between 0.5 mg/L – 0.8 mg/L.
11.5 Entry Point and Distribution System Monitoring (Sampling)
a. Prior to serving water to the public for a given season, Regulation 11 requires the collection of a sample from within the distribution system and have it tested for total coliform. The sample must test absent for the presence of coliform bacteria prior to the supplier serving water to the public for that season.
b. During normal operations, total coliform samples must be collected in the distribution system every month and analyzed for chlorine residual and total coliform bacteria during the operating season.
c. Also during normal operations, all required entry point sampling must be performed in accordance with the system’s monitoring schedule.
d. An EPA approved chlorine test kit must be used to assure there is appropriate chlorine residual in the distribution system.
11.6 Additional Start-Up Requirements
a. Complete seasonal system start-up instructions, procedures, and requirements are found in the “Revised Total Coliform Rule Start-up Procedures for BLM Pumphouse Rec. Site Water System, PWSID #CO0225625. Submit appropriate paperwork to CDPHE as required.
11.7 System Shut-Down Procedures
a. Post signs that the water system is closed.
b. Locate the electrical circuit panel and turn on off circuit breakers for “Well Pump”.
Remove vacuum breaker from the contact tank drain valve and extend hose outside
BLM Pumphouse Recreation Site Monitoring Plan – PWSID#CO0225625 Page 25 of 45 and downstream of the building to drain water. Open valve to drain tank. Repeat process for pressure tank.
c. Place bucket under Raw Water Tap and open valve to drain. Repeat process for Treated Water Tap. Leave valves open.
d. Remove sediment filter housing directly downstream of Raw Water Tap, drain water, dispose of filter, and rinse housing. Loosely re-attach housing. Open valve below filter on Proportional Injection System to drain.
e. Open PVC unions on waterline that are located upstream and downstream of pressure tank to release water trapped water.
f. Separate unions on each side of the flow meter on the Proportional Injection System to drain water from meter. Remove and drain water from ¼” tubing between the chlorine solution tank and Proportional Injection System. Disconnect ¼” tubing that flows into and out of the injection pump and drain lines. Run a few cycles on the injection pump to remove water from tubing inside housing. See manufacturer instructions if needed. Once drained, re-connect all items. Unplug the Proportional Injection System.
g. Verify “Waterline Valve #1” and “Waterline Valve #2” are open. (Note: Waterlines #1 and #2 valves are not shown on the “Disinfections Photo” but are near the “Treated Water Tap” and are marked for identification.)
h. Open all drain valves, #1-#5, by removing the plastic covers from drain valve boxes to expose curb stop. Place the curb stop key onto curb stop and turn counter-clockwise 90 degrees until valve is open. Note: not all curb stops are visible within standpipes, lower curb key as needed into standpipes until curb stop is located and key fits securely onto curb stop.
i. Hold open Taps #1-#7 one tap at a time to release trapped water. Remove vacuum breakers prior to opening if applicable.
j. Allow Drain Valves #1-#5 to remain open.
11.7 Disposal of Chlorinated Water in Solution Tank
a. Empty chlorinated water from solution tank and replace with a new chlorine/water mixture a maximum of every 60 days. Empty the solution tank in tank outside of the storage building but do not allow water to come in contact with the Colorado River.
11.8 Chlorine Solution Tank-Chlorinated Water Routine Replacement
a. Add approximately 10 gallons of well water to the Chlorine Solution Tank along with 5 cups of NSF Certified 8.25% bleach. (Note: Use only NSF Certified, un-scented bleach).
Place tubing into Chlorine Solution Tank and verify tubing is connected properly to the Proportional Injection Panel as described in the manufacturer’s instructions. Plug panel into the outlet above the Proportional Injection Panel. Remove air from tubing as instructed in the manufacturer’s instructions. Set the control knob on the pump control located in the upper left portion of the panel to approximately 50%. Verify chlorine is being pumped into the system. Add additional well water and/or adjust the chlorine injection pump as needed to decrease the free chlorine residual so that it is greater than 0.2 mg/L but less than 4.0 mg/L. The desired free chlorine level at the “Treated Water Tap” is between 0.5 mg/L – 0.8 mg/L.
BLM Pumphouse Recreation Site Monitoring Plan – PWSID#CO0225625 Page 26 of 45
11.9 Disinfection of Well and Water System
General Information: Well Depth: 136’ Pump Set: 128’ Casing Diameter: 6” Estimated Water Volume in Well: 175 Gallons
a. Place signs on all taps in campground stating “Do Not Drink Water-Water System
Maintenance Being Performed”.
b. Turn off power to well pump at circuit panel in storage shed. Unplug the power cord to the proportional injection system.
c. Attach hose to hose bid connection on Tap #2 (If hose bib has lock installed on bib, the key can be found on wood peg board panel above bench in storage shed) and extend hose to well location. Open the hose bid.
d. Remove and inspect sanitary well cap and gasket. Replace well cap and/or gasket if required.
e. Mix 5 cups of NSF certified 8.25% bleach with 5 gallons of water and pour mixture into well. Place end of hose connected to Tap #2 inside well casing.
f. Turn on power to the well pump and circulate the water in the well through the hose until the odor of chlorine can be detected. Once detected, continue circulating the chlorinated water in the well, washing the interior and exterior of the well with the chlorinated water for 1 hour.
g. Open all Taps #1-#7 on both waterlines one at a time until the odor of chlorine is detected then close tap. Turn off power to well pump and close valve to both Waterline #1 and Waterline #2.
h. Allow highly chlorinated water to remain in the well and distribution system for 24 hour.
i. After 24 hours, Open valve to Waterline #1 and Waterline #2 and turn on power to well pump. Open Taps #1 and #3 on Waterline #1 and Taps #4 and #7 on Waterline #2 to begin flushing the chlorinated water from the well and distribution system.
(Note: It may take 4-6 hours to flush all the chlorine from the well and distribution system) DO NOT ALLOW THE CHLORINATED WATER TO CONTACT THE RIVER AS
THE CHLORINATED WATER WILL KILL AQUATIC LIFE.
j. Once the chlorinated water can no longer be detected by testing for the free chlorine residual with the Hach II Colorimeter, turn off all taps.
k. Plug in power to the proportional injection system and begin the disinfections system process as described in section 11.8. Chlorine Solution Tank-Chlorinated Water Routine Replacement, and test according to Section 8.0 Routine Coliform Monitoring, prior to opening the water system to users.
A1
12.0 Public Notifications for MCL and Monitoring Violations
APPENDIX A
Public Notifications
Tier 1 E. coli MCL Violation ....................................................................... A-2 Tier 2 Treatment Technique Violation – Failure to Perform Level 1 Assessment ...... A-3 Tier 2 Treatment Technique Violation – Failure to Perform Level 2 Assessment ...... A-4 Tier 2 Treatment Technique Violation – Failure to Complete Start-Up Procedure Prior to Serving Water to the Public ............................................................ A-5 Tier 1 Nitrate MCL Violation ...................................................................... A-6 Tier 1 Nitrite MCL Violation ....................................................................... A-7 Tier 3 Monitoring Violation ........................................................................ A-8 Information: Coliform Detected ................................................................. A-9 Drinking Water Problem Corrected ........................................................... A-10
Tier 1 E. coli MCL Violation A-2
DRINKING WATER WARNING
PUMPHOUSE CAMPGROUND WATER IS CONTAMINATED WITH E. COLI
BOIL YOUR WATER BEFORE DRINKING OR USING
E. coli bacteria were found in the water supply on ___/___/___. These bacteria can make you sick, and are a particular concern for people with weakened immune systems.
What should I do?
DO NOT DRINK THE WATER WITHOUT BOILING IT FIRST. Bring all water to a rolling boil, let it boil for one minute, and let it cool before using it. Boiling kills bacteria and other organisms in the water. You may also use bottled water. Use boiled or bottled water for drinking, making ice, preparing food and washing dishes until further notice.
E. coli are bacteria whose presence indicates that the water may be…