Bisley Road Landslide Repair on El Yunque National Forest

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
1244522B0001
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Rio Grande Pr 00721 Puerto Rico

Notice details come from SAM.gov. Updated .

About this opportunity

The USDA Forest Service is soliciting bids for the Bisley Road Landslide Repair project in El Yunque National Forest, Puerto Rico. The project involves clearing debris, installing spill containment measures, and repairing a landslide area on Bisley Road. Bids will be evaluated based on technical qualifications, past performance, and price under the sealed bidding procedures outlined in FAR Part 14. The IFB is expected to be posted on March 4th, with bids due approximately 30 days later.

This procurement has been set aside 100% for small businesses under NAICS code 237310 - Highway, Street, and Bridge Construction, with a size standard of $39.5M. The estimated value ranges from $500,000 to $1,000,000. The period of performance is 90 days from award. Bids will be opened in Atlanta, Georgia on the date specified in the IFB. This project supports repairing infrastructure damaged by a landslide to ensure access and usability of Bisley Road in El Yunque National Forest.

Notice text

This is a presolicitation notice being released pursuant to Federal Acquisition Regulation (FAR) Part 5.

The Government anticipates a construction requirement for Bisley Road Landslide Repair in El Yunque National Forest, Rio Grande, PR.

This procurement will be solicited using North American Industry Classification System (NAICS) 237310—Highway, Street, and Bridge Construction, with a small business size standard of $39.5M.

This will be solicited using FAR Part 14--Sealed Bidding. The Invitation for Bid (IFB) will be posted on or about 4 March 2022 and the closing date will be approximately 30 days after. Full plans and specifications will be available for download from beta.sam.gov. For site visit you can contact Mr. Eduardo Martinez at  939-216-4076. 

Opening of bids will be at the time and date identified on the IFB in Atlanta, GA. This acquisition will be competed as a 100% Total Small Business Set Aside.

Line Item 0001 - Bisley Road Landslide Repair on El Yunque National Forest

1) Project site cleanup includes the removal and proper disposal of all project trash, demolition debris, and residue off National Forest Land. Proper waste disposal sites shall be any local commercial landfill. All spills of petroleum products including leak spots from parked vehicles shall be removed and properly disposed according to all Local, State, and Federal rules, regulations, and laws governing such disposal.

Any Fuel Trucks staged on-site must be equipped with spill containment kits and portable berms that meet all state and federal regulations. A Spill Containment Plan must be submitted and approved prior to the start of work. If any fuel or oil are to be stored onsite (regardless of the amount), the Contractor shall prepare, and submit for review and approval, then later for implementation a Spill Prevention and Countermeasures Plan. The (SPCC) Plan shall meet applicable EPA requirements (40 CFR 112), including required certification by a Registered Professional Engineer. The contractor shall accomplish the listed work in accordance to the acceptance requirements as per the specifications. The contractor is responsible for all clean-up costs of petroleum product spills within the project vicinity area caused directly or indirectly by their employees or from their contract operations.

C.2      PROJECT LOCATON

Commonwealth of Puerto Rico, County of Rio Grande, El Yunque National Forest.

The project is located south of the El Portal Visitor Center. From PR-3 in Rio Grande, Puerto Rico follow PR-191 for approx. 3 miles then turn left onto PR-988 for approx. 3 miles, Forest Service Road 915 will be on your right. Project coordinates: Latitude: 18°19' 17.23"N; Longitude: 65°44' 33.49"W.

The magnitude of construction for this project is between $500,000 and $1,000,000.

Period of performance:  90 days

Files

File Type Posted
Statement of Work (SOW) 1055385.pdf PDF
FSSS_Bisley Rd.pdf PDF
Drawings_BISLEY RD LANDSLIDE REPAIR_12.01.pdf PDF

Notice history

Notice Type Posted
Bisley Road Landslide Repair on El Yunque National Forest - Solicitation Award Award Notice
Bisley Road Landslide Repair on El Yunque National Forest - Solicitation Latest solicitation Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Custer Gallatin National Forest Ashland and Sioux Road Maintenance Billings, Montana, United States · NAICS 237310 Region 6 - Pacific Northwest Region Total Small Business
New Mexico Forest Engineering and Road Maintenance (FERM) Santa Fe, New Mexico 87501, United States · NAICS 237310 Forest Service Total Small Business
Acadia National Park Maine, United States · NAICS 237310 Federal Highway Administration Total Small Business
WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4 Port Angeles, Washington, United States · NAICS 237310 Federal Highway Administration Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors