Belle Fountain Ditch Cleanout Phase 2
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- W912EQ26BA002
- Agency
-
ENDIST Memphis
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Pemiscot County, Missouri
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Memphis District is preparing to solicit services for the Belle Fountain Ditch Cleanout Phase 2 project, with a pre-solicitation notice due September 17, 2026; the procurement is set aside for Service-Disabled Veteran-Owned Small Businesses.
The work involves furnishing all plant, labor, and materials for channel cleanout of Belle Fountain Ditch, including the Bypass of Steele and Main Ditch sections, according to plans and specifications, with incidental related work included. The project extends from the confluence of New Franklin Ditch and Bypass of Steele, heading north through Bypass of Steele as it transitions into Main Ditch, and ending approximately 100 feet before the intersection of Main Ditch and County Road 442, located roughly 2.5 miles south of Braggadocio, Missouri. The work location is in the Bypass of Steele area where it intersects with New Franklin Ditch, proceeding north along Main Ditch to the termination point.
NAICS 237990 (Other Heavy and Civil Engineering Construction) and PSC Z1PC (Maintenance of Unimproved Real Property) classify the work.
Notice text
Title of Work: Belle Fountain Ditch Cleanout Phase 2 Project Description: The work consists of furnishing all plant, labor, and materials for channel cleanout of Belle Fountain Ditch region including Bypass of Steele and Main Ditch according to the plans and specifications and any incidental related work. The project limits are starting at the confluence of New Franklin Ditch and Bypass of Steele, heading North through Bypass of Steele and it turns into Main Ditch, and ending at the intersection of Main Ditch and County Rd. 442 located approximately 2.5 miles south of Braggadocio, Missouri as shown on the plans. Work Location: The work shall be located at Bypass of Steele where it intersects with New Franklin ditch, then heads north through Main Ditch, and ends 100 ft before the intersection of Main Ditch and County Rd. 442, approximately as indicated.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Belle Fountain Ditch Cleanout Phase 2 | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Mississippi River Basin Bettendorf, Iowa Local Flood Protection Bettendorf, Iowa 2024 Event PL84-99 Flood Repairs | ENDIST Rock Island | Service-Disabled Veteran-Owned Small Business | |
| St Francis Town Levee Renovation | ENDIST Memphis | No set-aside | |
| Z2NZ-- 658-23-108 Correct Stormwater Drainage | Veterans Integrated Service Network 6 | Service-Disabled Veteran-Owned Small Business | |
| Mississippi River, New Orleans Harbor and Various Bar Channels Cutterhead Dredge No. 5-2025 | ENDIST New Orleans | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity