About this opportunity

The Department of the Army Corps of Engineers Engineering District Omaha seeks fabrication and installation of service and emergency gates at Bear Creek Dam in Lakewood, Colorado, with proposals due June 29, 2026. The procurement is a Total Small Business set-aside with a firm fixed-price structure and estimated construction cost between $1 million and $5 million.

Place of performance is Denver, Colorado. The work includes fabricating and installing two new service gates and two new emergency gates to fit current gate slots, repainting the inlet tunnel liner, gate slots, and marine door, replacing bonnet gaskets and O-ring seals on the main hydraulic gate hoist system, redesigning and fabricating low-flow gate hydraulic cylinders with shop testing, and replacing hydraulic oil piping. Work must occur during restricted windows: November 20–December 11, 2026 and November 20–December 11, 2027, with an optional January 24–February 5, 2028 window. Work hours are limited to 7:00 AM–7:00 PM seven days per week during construction windows and 7:00 AM–5:00 PM Monday through Friday outside those windows. Performance must begin within 10 calendar days of notice to proceed and be completed within 640 calendar days of award. The NAICS code is 237990 (Other Heavy and Civil Engineering Construction); PSC is Z2KA (Repair Or Alteration Of Dams).

The contractor must be certified under the AISC Quality Certification Program (Major Bridge, Advanced, Intermediate, or Hydraulic with Fracture Critical endorsement), and the paint contractor must hold SSPC QP3 or AISC sophisticated paint endorsement with certified inspectors. Welders and inspectors must be qualified to SSPC standards. Evaluation applies a best-value tradeoff with Past Performance and Technical Approach weighted equally and significantly more important than Price. Offerors must submit three relevant past performance projects involving gate, bulkhead, or steel structure fabrication and installation completed within ten years, with narratives not exceeding two pages each. The technical approach narrative, limited to 20 pages, must include a detailed Project Management Plan and Gantt chart schedule. Amendment 0002 (effective June 12) removed three optional asbestos and lead abatement line items and modified specifications and drawings per attachments. A mandatory site visit occurred May 18, 2026; retainage of $35,000 or 1 percent of contract value, whichever is greater, applies.

Notice text

4 versions

Update #4 · Latest ·

19 May 2026 - Updated with Site Visit Sheet

22 May 2026 - AMD 0001 of this solicitation is to update the proposal due date to 29 June 2026.

12 June 2026 - AMD 0002. The specifications and drawings for the subject project have been modified. Please see attachments with "AM-2" or "AMD 0002" for the updates.

----------------------------------------------------------------------------------------------------------

The work includes fabricating and installing new service gates and emergency gates to fit current gate slots at Bear Creek Dam, Lakewood, Colorado. The gate slots must be measured for accuracy and the existing drawings shall be used for information only. The inlet tunnel liner, gate slots, and marine door will be repainted. The work related to the main hydraulic gate hoist system will be limited to the replacement of bonnet gaskets and O-ring seals between the gate stem and the new gate. The hydraulic oil piping for the low-flow gate, between the new cylinder and the flexible hoses on the hoist deck, will also be replaced. The low-flow gate cylinders will be redesigned, fabricated, shop-tested, and installed to operate the low-flow gates on the new service gates. All incidental related work is also included in this scope. Mechanical scope of work is illustrated on drawing sheets M-001 thru M-105 and detailed requirements are specified in specification sections 05 56 09.00 26 GATE SEALS and 35 05 40.14 10 HYDRAULIC HOISTING SYSTEMS FOR CIVIL WORKS STRUCTURES.

SEE ALL ATTACHMENTS

Update #3 ·

19 May 2026 - Updated with Site Visit Sheet

22 May 2026 - AMD 0001 of this solicitation is to update the proposal due date to 29 June 2026.

----------------------------------------------------------------------------------------------------------

The work includes fabricating and installing new service gates and emergency gates to fit current gate slots at Bear Creek Dam, Lakewood, Colorado. The gate slots must be measured for accuracy and the existing drawings shall be used for information only. The inlet tunnel liner, gate slots, and marine door will be repainted. The work related to the main hydraulic gate hoist system will be limited to the replacement of bonnet gaskets and O-ring seals between the gate stem and the new gate. The hydraulic oil piping for the low-flow gate, between the new cylinder and the flexible hoses on the hoist deck, will also be replaced. The low-flow gate cylinders will be redesigned, fabricated, shop-tested, and installed to operate the low-flow gates on the new service gates. All incidental related work is also included in this scope. Mechanical scope of work is illustrated on drawing sheets M-001 thru M-105 and detailed requirements are specified in specification sections 05 56 09.00 26 GATE SEALS and 35 05 40.14 10 HYDRAULIC HOISTING SYSTEMS FOR CIVIL WORKS STRUCTURES.

SEE ALL ATTACHMENTS

Update #2 ·

19 May 2026 - Updated with Site Visit Sheet

----------------------------------------------------------------------------------------------------------

The work includes fabricating and installing new service gates and emergency gates to fit current gate slots at Bear Creek Dam, Lakewood, Colorado. The gate slots must be measured for accuracy and the existing drawings shall be used for information only. The inlet tunnel liner, gate slots, and marine door will be repainted. The work related to the main hydraulic gate hoist system will be limited to the replacement of bonnet gaskets and O-ring seals between the gate stem and the new gate. The hydraulic oil piping for the low-flow gate, between the new cylinder and the flexible hoses on the hoist deck, will also be replaced. The low-flow gate cylinders will be redesigned, fabricated, shop-tested, and installed to operate the low-flow gates on the new service gates. All incidental related work is also included in this scope. Mechanical scope of work is illustrated on drawing sheets M-001 thru M-105 and detailed requirements are specified in specification sections 05 56 09.00 26 GATE SEALS and 35 05 40.14 10 HYDRAULIC HOISTING SYSTEMS FOR CIVIL WORKS STRUCTURES.

SEE ALL ATTACHMENTS

Update #1 ·

The work includes fabricating and installing new service gates and emergency gates to fit current gate slots at Bear Creek Dam, Lakewood, Colorado. The gate slots must be measured for accuracy and the existing drawings shall be used for information only. The inlet tunnel liner, gate slots, and marine door will be repainted. The work related to the main hydraulic gate hoist system will be limited to the replacement of bonnet gaskets and O-ring seals between the gate stem and the new gate. The hydraulic oil piping for the low-flow gate, between the new cylinder and the flexible hoses on the hoist deck, will also be replaced. The low-flow gate cylinders will be redesigned, fabricated, shop-tested, and installed to operate the low-flow gates on the new service gates. All incidental related work is also included in this scope. Mechanical scope of work is illustrated on drawing sheets M-001 thru M-105 and detailed requirements are specified in specification sections 05 56 09.00 26 GATE SEALS and 35 05 40.14 10 HYDRAULIC HOISTING SYSTEMS FOR CIVIL WORKS STRUCTURES.

SEE ALL ATTACHMENTS

Files

Notice history

Notice Type Posted
Bear Creek Service & Emergency Gates Replacement Award Award Notice
This notice Latest solicitation Solicitation
Bear Creek Service & Emergency Gates Replacement Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Stove Prairie Campground Gate Replacement Bellvue, Colorado, United States · NAICS 237990 Forest Service Total Small Business
Dino replace swing arm gates NAICS 236220 Intermountain Region No set-aside
PGMB Security Gate NAICS 238990 — Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity