BC00101 - Amendment 0002 - Drawings.PDF

PDF 22 MB Posted

Attached to
Bear Creek Service & Emergency Gates Replacement
Solicitation number
W9128F26RA079
Issued by

About this file

This document is a set of technical design drawings for the Bear Creek Dam coating project issued by the U.S. Army Corps of Engineers Omaha District. The project involves replacing service and emergency gates at Bear Creek Lake, Colorado, and coating various steel components with a 5-coat vinyl system designated as System 5-E-Z.

The primary work scope includes: blasting two new service gates and two new emergency gates to SSPC-SP-5 white metal blast cleaning standards (NACE No. 1) and applying the 5-coat vinyl coating system, with this work performed off-site at QP-3 certified shops; coating four embedded gate slot areas on-site using QP-1 field certified contractors, with special angled blasting nozzles required to access confined spaces; and coating two embedded steel liners located in a tunnel measuring approximately 13 feet 1 inch in length and 6 feet 2 inches to 10 feet 6 inches in height, with the tunnel width at 3 feet except in the gate slot area. Critical specifications include brush stripe coating on all inside, outside corners, and welded areas with spray application for general areas; full protection of all brass components before any blasting occurs; avoidance of coating service gate stems, emergency gate stems, stainless steel hydraulic surfaces, and brass alloy components; and emergency provisions to seal slot areas during a potential 21-day lake drawdown period that encompasses tunnel drying with dehumidified air, surface preparation, five coats of vinyl application, and approximately seven days of curing. The drawings reference specification 09 97 02 and include details on containment requirements, HEPA filter exhaust placement, and an optional off-site coating scope for the emergency gates contingent upon new service gates being installed on-site.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C :\U

SE

R

S\ G

6E D

XJ

D

S\ O

N

ED

R

IV

E

- U

S

AR

M Y

C O

R

PS

O F

EN

G

IN

EE

R S\

D O

C U

M

EN

TS

\B

EA

R

C R

EE

K

- C O

AT

IN

G P

R O

JE

C

T\

FU

LL

-S

ET

D

W G

P

D F\

BC

1.

D W

G 3:

:4

PM

/8

/2

G

6E D

XJ

D

S

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

O L

AV

E

O M

AH

A, N E

/0

3/

FI

LE

N U

M

BE

R

FI

LE

N

AM

E:

AN

SI

D

W

F2

6R A0

BE

AR

C R

EE

K

D

AM

, C O

LO

R

AD

O

R

EP

LA

C

E

SE

R

VI

C E

AN

D

E M

ER

G

EN

C

Y G

AT

ES

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

OPTION TO COAT NEW EMERGENCY GATES, 2

EACH. SEE NOTE 2. SEE PHOTO ON CG-009.

COAT 2 EACH EMERGENCY

GATES WITH SYSTEM 5-E-Z,

ALSO SEE PHOTOS ON SHEET

CG-009 (SEE NOTE 2).

OFF-SITE OPTION.EMERGENCY GATE SLOTS.

SEE NOTE 4.

SERVICE GATE SLOTS

SEE NOTE 3.

COAT 2 EACH NEW

SERVICE GATES WITH

SYSTEM 5-E-Z, ALSO SEE

PHOTOS ON SHEET

CG-009, (SEE NOTE 1).

BASIC OFF-SITE.

G

AT

E

AM

D H

O

IS

T

AS

SM

BL

IE

S

EM

EG

EN

C

Y G

AT

ES

, S

ER

VI

C

E G

AT

ES

, E M

BE

D

ED

S

TE

EL

F R

AM

ES

A N

D S

LO

TS

COAT 2 EACH EMBEDDED

STEEL LINER WITH SYSTEM

5-E-Z, ALSO SEE PHOTO ON

SHEET CG-009 (SEE NOTE 5).

BASIC OFF-SITE.

COAT 2 EACH EMBEDDED STEEL LINER

WITH SYSTEM 5-E-Z, ALSO SEE PHOTO

ON SHEET CG-009 (SEE NOTE 5). BASIC

OFF-SITE.

NOTES:

1. BLAST THE 2 EACH NEW SERVICE GATES TO SSPC-SP-5 WHITE

METAL BLAST CLEANING (NACE NO.1) AND COAT 2 EACH SERVICE

GATES WITH A 5-COAT VINYL SYSTEM 5-E-Z. SHOP MUST BE QP-3

SHOP CERTIFIED. BRUSH A STRIPE COAT ON ALL INSIDE, OUTSIDE

CORNERS AND WELDED AREAS. SPRAY GENERAL AREAS. BASIC

OFF-SITE.

2. BLAST THE NEW EMERGENCY GATES 2 EACH TO SSPC-SP-5

WHITE METAL BLAST CLEANING (NACE NO.1) AND COAT 2 EACH

NEW EMERGENCY GATES WITH A 5-COAT VINYL SYSTEM 5-E-Z.

SHOP MUST BE QP-3 SHOP CERTIFIED. BRUSH A STRIPE COAT ON

ALL INSIDE, OUTSIDE CORNERS AND WELDED AREAS. SPRAY

GENERAL AREAS. THESE EMERGENCY GATES WILL BE AVAILABLE

TO BE COATED ONCE THE NEW SERVICE GATES ARE BACK ON

SITE AND OPTION IS AWARDED. THESE OLD GATES MUST REMAIN

ONSITE DURING THE 21 DAY LAKE DRAW DOWN. OPTIONAL

OFF-SITE.

3. SERVICE GATE AND EMERGENCY GATE SLOT AREAS WILL BE

DIFFICULT TO ACCESS TO OBTAIN THE SSPC-SP 5 WHITE METAL

BLAST CLEANING (NACE NO. 1). SURFACE PREPARATION

CONTRACTOR SHALL UTILIZE SPECIAL ANGLED BLASTING

NOZZLES TO GET INTO CREVICES WITH THE WIDTH RESTRICTIONS

SHOWN ON PLAN (BONNET) ON SHEET CG-007. COAT 4 EACH

EMBEDDED GATE SLOTS WITH A 5-COAT VINYL SYSTEM 5-E-Z.

CONTRACTOR MUST BE QP-1 FIELD CERTIFIED. BRUSH A STRIPE

COAT ON ALL INSIDE, OUTSIDE CORNERS AND WELDED AREAS.

CONTRACTOR MAY APPLY THE COATING SYSTEM BY ROLLERS

AND OR BRUSHES TO OBTAIN COVERAGE IN THE EMERGENCY

AND SERVICE GATES SLOT AREAS. BASIC ON-SITE COATING.

4. SERVICE GATE AND EMERGENCY GATE SLOT AREAS SHALL

HAVE EMERGENCY PROVISIONS TO SEAL THE SLOT AREAS IF A

FLOOD EVENT THAT WOULD EXCEED THE LAKE WATER DRAW

DOWN DURING THE 21 DAY COATING DURATION. THE 21 DAY

COATING DURATION INCLUDES DRYING THE TUNNEL WITH

DEHUMIDIFIED AIR, SURFACE PREPARATION TO SSPC-SP-5 WHITE

METAL BLAST CLEANING (NACE 1), COATING 5-COATS OF VINYL

(SYSTEM 5-E-Z) AND THEN CURE THE COATING SYSTEM FOR

APPROXIMATELY 7 DAYS. THIS WOULD INCLUDE REPLACING THE

OLD EMERGENCY AND SERVICE GATES . BASIC ON-SITE COATING.

5. BLAST THE EMBEDDED STEEL LINER TO SSPC-SP-5 WHITE

METAL BLAST CLEANING (NACE NO.1) AND COAT 2 EACH

EMBEDDED STEEL LINER WITH COATING SYSTEM 5-E-Z PER

SPECIFICATION 09 97 02. BRUSH A STRIPE COAT ON ALL INSIDE,

OUTSIDE CORNERS AND WELDED AREAS. SPRAY GENERAL

AREAS. PLAN VIEW IS SHOWN ON SECTION 4. PROFILE IS SHOWN

ON SECTION 1. THE STEEL LINER REQUIRES COATING THE

EXPOSED STEEL SURFACES AREAS LOCATED IN THE TUNNEL TO

INCLUDE FLOOR, WALLS, AND CEILING. FLOOR LENGTH IS ABOUT

13'-1” FEET LONG, AND HEIGHT VARIES FROM 6'2” TO 10'6” HIGH.

SEE SECTION 1. THE TUNNEL WIDTHS ARE 3' AS SHOWN ON

SECTION 3. THE TUNNEL WIDTH IN THE GATE SLOT AREA IS

WIDER. SEE PLAN BONNET ON SHEET CG-007. SEAL WITH

CONTAINMENT UPSTREAM OF EMERGENCY GATE AND

DOWNSTREAM OF MARINE DOOR WITH BARRIER. PLACE HEPA

FILTER ON EXHAUST. BASIC ON-SITE COATING.

DO NOT COAT SERVICE

GATE STEMS. 2 EACH

DO NOT COAT

EMERGENCY GATE

STEMS. 2 EACH

AD

VE

R

TI

SE

M

EN

T

BEFORE ANY BLASTING

OCCURS, CONTRACTOR WILL

FULLY PROTECT ALL BRASS

COMPONENTS.

CG005

D . L

AN

G

J

. S

EW

EL

L

K.

H

AL

L

B . F

LE

R

E

AM

#0

-G

EN

ER

AL

R

EV

IS

IO

N S

JU

N

E

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

C :\U

SE

R

S\ G

6E D

XJ

D

S\ O

N

ED

R

IV

E

- U

S

AR

M Y

C O

R

PS

O F

EN

G

IN

EE

R S\

D O

C U

M

EN

TS

\B

EA

R

C R

EE

K

- C O

AT

IN

G P

R O

JE

C

T\

FU

LL

-S

ET

D

W G

P

D F\

BC

1.

D W

G 3:

:1

PM

/8

/2

G

6E D

XJ

D

S

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

O L

AV

E

O M

AH

A, N E

/0

3/

FI

LE

N U

M

BE

R

FI

LE

N

AM

E:

AN

SI

D

W

F2

6R A0

BE

AR

C R

EE

K

D

AM

, C O

LO

R

AD

O

R

EP

LA

C

E

SE

R

VI

C E

AN

D

E M

ER

G

EN

C

Y G

AT

ES

NOTES:

1. BLAST THE NEW EMERGENCY GATES TO SSPC-SP-5 WHITE METAL

BLAST CLEANING (NACE NO.1) AND COAT 2 EACH NEW EMERGENCY

GATES WITH A 5-COAT VINYL SYSTEM 5-E-Z. SHOP MUST BE QP-3

SHOP CERTIFIED. BRUSH A STRIPE COAT ON ALL INSIDE, OUTSIDE

CORNERS AND WELDED AREAS. SPRAY GENERAL AREAS. THESE

EMERGENCY GATES WILL BE AVAILABLE TO BE COATED ONCE THE

NEW SERVICE GATES ARE BACK ON SITE AND OPTION IS AWARDED.

THESE OLD GATES MUST REMAIN ONSITE DURING THE 21 DAY LAKE

DRAW DOWN. OPTIONAL OFF-SITE.

2. SERVICE GATE AND EMERGENCY GATE SLOTS AREAS WILL BE

DIFFICULT TO ACCESS TO OBTAIN THE SSPC-SP 5 WHITE METAL

BLAST CLEANING (NACE NO. 1). SURFACE PREPARATION

CONTRACTOR SHALL UTILIZE SPECIAL ANGLED BLASTING NOZZLES

TO GET INTO CREVICES WITH THE WIDTH RESTRICTIONS SHOWN ON

PLAN (BONNET) ON SHEET CG-007. COAT 4 EACH EMBEDDED GATE

SLOTS WITH A 5-COAT VINYL SYSTEM 5-E-Z. CONTRACTOR MUST BE

QP-1 FIELD CERTIFIED. BRUSH A STRIPE COAT ON ALL INSIDE,

OUTSIDE CORNERS AND WELDED AREAS. CONTRACTOR MAY APPLY

THE COATING SYSTEM BY ROLLERS AND OR BRUSHES TO OBTAIN

COVERAGE IN THE EMERGENCY AND SERVICE GATES SLOT AREAS.

BASIC ON-SITE.

3. SERVICE GATE AND EMERGENCY GATE SLOT AREAS SHALL HAVE

EMERGENCY PROVISIONS TO SEAL THE SLOT AREAS IF A FLOOD

EVENT THAT WOULD EXCEED THE LAKE WATER DRAW DOWN DURING

THE 21 DAY COATING DURATION. THE 21 DAY COATING DURATION

INCLUDES DRYING THE TUNNEL WITH DEHUMIDIFIED AIR, SURFACE

PREPARATION TO SSPC-SP-5 WHITE METAL BLAST CLEANING (NACE 1),

COATING 5-COATS OF VINYL (SYSTEM 5-E-Z) AND THEN CURE THE

COATING SYSTEM FOR APPROXIMATELY 7 DAYS. THIS WOULD

INCLUDE REPLACING THE OLD EMERGENCY AND SERVICE GATES .

BASIC ON-SITE COATING.

4. BLAST THE EMBEDDED STEEL LINER TO SSPC-SP-5 WHITE METAL

BLAST CLEANING (NACE NO.1) AND COAT 2 EACH EMBEDDED STEEL

LINER WITH COATING SYSTEM 5-E-Z PER SPECIFICATION 09 97 02.

BRUSH A STRIPE COAT ON ALL INSIDE, OUTSIDE CORNERS AND

WELDED AREAS. SPRAY GENERAL AREAS. PLAN VIEW IS SHOWN ON

SECTION 4. PROFILE IS SHOWN ON SECTION 1. THE LINER REQUIRES

COATING THE EXPOSED STEEL SURFACES AREAS LOCATED IN THE

TUNNEL TO INCLUDE FLOOR, WALLS, AND CEILING. FLOOR LENGTH IS

ABOUT 13'-1” FEET LONG, AND HEIGHT VARIES FROM 6'2” TO 10'6” HIGH.

SEE SECTION 1. THE TUNNEL WIDTHS ARE 3' AS SHOWN ON SECTION

3. THE TUNNEL WIDTH IN THE GATE SLOT AREA IS WIDER. SEE PLAN

BONNET ON SHEET CG-007. SEAL WITH CONTAINMENT UPSTREAM OF

EMERGENCY GATE AND DOWNSTREAM OF MARINE DOOR WITH

BARRIER. PLACE HEPA FILTER ON EXHAUST. BASIC ON-SITE COATING.

COAT 2 EACH

EMERGENCY GATE

SLOTS WITH SYSTEM

5-E-Z (SEE NOTE 2 & 3).

BASIC ON-SITE.

COAT 2 EACH SERVICE GATE SLOTS

WITH SYSTEM 5-E-Z (SEE NOTE 2 & 3).

BASIC ON-SITE.

SEE NOTE 4.

SEE NOTES 2 & 3.

BEFORE ANY BLASTING OCCURS,

CONTRACTOR WILL FULLY PROTECT

ALL BRASS COMPONENTS.

COAT 2 EACH NEW EMERGENCY

GATES WITH SYSTEM 5-E-Z. ALSO

SEE PHOTOS ON SHEET CG-009

(SEE NOTE 1). OFF-SITE-OPTION.

EMERGENCY GATE

O U

TL

ET

W O

R

KS

G

AT

E

ST

R

U C

TU

R

ES

EM

ER

G

EN

C

Y G

AT

ES

, S

ER

VI

C

E G

AT

ES

, S

LO

TS

A

N D

E M

BE

D

ED

S

TE

EL

F R

AM

E

COAT 2 EACH EMBEDDED STEEL LINER WITH SYSTEM 5-E-Z,

ALSO SEE PHOTO ON SHEET CG-009 (SEE NOTE 4). BASIC

ON-SITE.

AD

VE

R

TI

SE

M

EN

T

CG007

K.

H

AL

L

J.

S

EW

EL

L

D . L

AN

G

B.

F

LE

R

E

AM

#0

-G

EN

ER

AL

R

EV

IS

IO

N

S

JU

N

E

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

C :\U

SE

R

S\ G

6E D

XJ

D

S\ O

N

ED

R

IV

E

- U

S

AR

M Y

C O

R

PS

O F

EN

G

IN

EE

R S\

D O

C U

M

EN

TS

\B

EA

R

C R

EE

K

- C O

AT

IN

G P

R O

JE

C

T\

FU

LL

-S

ET

D

W G

P

D F\

BC

1.

D W

G 3:

:0

PM

/8

/2

G

6E D

XJ

D

S

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

O M

AH

A

D

IS

TR

IC

T

C

AP

IT

O L

AV

E

O M

AH

A, N E

/0

3/

FI

LE

N U

M

BE

R

FI

LE

N

AM

E:

AN

SI

D

W

F2

6R A0

BE

AR

C R

EE

K

D

AM

, C O

LO

R

AD

O

R

EP

LA

C

E

SE

R

VI

C E

AN

D

E M

ER

G

EN

C

Y G

AT

ES

COAT 2 EACH NEW SERVICE

GATES AND LOW FLOW

ASSEMBLY WITH SYSTEM

5-E-Z. (SEE NOTE 1).

COAT 2 EACH NEW LOW FLOW

ASSEMBLY WITH SYSTEM 5-E-Z.

(SEE NOTE 1). DO NOT COAT

STAINLESS STEEL HYDRAULIC

SURFACES. DO COAT MILD STEEL

ASSEMBLIES.NOTES:

1. BLAST THE 2 EACH NEW SERVICE GATES TO SSPC-SP-5 WHITE METAL

BLAST CLEANING (NACE NO.1) AND COAT 2 EACH SERVICE GATES WITH A

5-COAT VINYL SYSTEM 5-E-Z. SHOP MUST BE QP-3 SHOP CERTIFIED.

BRUSH A STRIPE COAT ON ALL INSIDE, OUTSIDE CORNERS AND WELDED

AREAS. SPRAY GENERAL AREAS. BASIC OFF-SITE.

DO NOT COAT

STAINLESS STEEL

HYDRAULIC SURFACE

OR BRASS ALLOY.

BEFORE ANY

BLASTING OCCURS,

CONTRACTOR WILL

FULLY PROTECT ALL

BRASS COMPONENTS.

BEFORE ANY BLASTING OCCURS,

CONTRACTOR WILL FULLY PROTECT ALL

BRASS COMPONENTS.

O U

TL

ET

W O

R

KS

G

AT

E

ST

R

U C

TU

R

ES

SE

R

VI

C E

G

AT

E

LO

W

F

LO

W G

AT

E

W

IT

H H

O

IS

T

AS

SE

M

BL

Y

AD

VE

R

TI

SE

M

EN

T

CG008

K.

H

AL

L

J.

S

EW

EL

L

D . L

AN

G

B.

F

LE

R

E

AM

#0

-G

EN

ER

AL

R

EV

IS

IO

N

S

JU

N

E

GEOTECHNICAL
CG005GATE AND HOIST ASSMBLIES / EMEGENCY GATES, SERVICE GATES, EMBEDED STEEL FRAMES AND SLOTS (1)
CG007OUTLET WORKS - GATE STRUCTURES / EMERGENCY GATES, SERVICE GATES, SLOTS AND EMBEDED STEEL FRAME (1)
CG008OUTLET WORKS - GATE STRUCTURES / SERVICE GATE & LOW FLOW GATE WITH HOIST ASSEMBLY (1)
MECHANICAL
M-103GATE SEALS AND GATE SLOT SEALS (1)

File details come from the government source that posted it. Updated .