Bathtub replacement remodel
Closed Solicitation Posted
- Solicitation number
- 32232749
- Agency
-
Coast Guard
Department of Homeland Security
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 236118 Residential Remodelers
- Place of performance
- New London, Connecticut 06320, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Homeland Security U.S. Coast Guard seeks bathtub replacement and remodel services at Quarters 2, U.S. Coast Guard Academy, New London, Connecticut, with proposals due July 5. The procurement is a Total Small Business set-aside.
The scope includes removal of the existing fiberglass tub, trim, and walls; installation of mold-resistant greenboard on three walls; supply and installation of a new 60 x 30 x 15 white acrylic tub and white acrylic surround walls; installation of a new Wolverine Brass Inc. tub/shower diverter valve; installation of a 24-inch chrome grab bar and white acrylic four-shelf corner caddy; caulking with mold-resistant material; and off-site disposal of all debris. The Government will provide reasonable utilities (115V @ 15A electricity and household pressure water) at no cost.
All contractor personnel must possess a photo Real ID with gold star on their driver's licenses. Work must be performed during standard business hours (0730–1600 Monday through Friday, excluding federal holidays) and coordinated with the Government. No subcontractors are permitted. Site visits are required and must be coordinated with Andrew Hoffman at Andrew.J.Hoffman@uscg.mil or 571.607.1991. The Contract Officer's Representative will select final design elements including tub/shower style, wall patterns, and accessories prior to installation. Responses must be submitted on company letterhead and include the contractor's UEI#. The NAICS code is 236118, Residential Remodelers; the PSC code is Z2FA, Repair Or Alteration Of Family Housing Facilities.
Notice text
- SCOPE OF WORK: Contractor shall provide all equipment, labor, materials, supervision, and transportation to replace an aging bathtub and accessories.
-
- Remove existing shower/tub trim from shower surround
- Remove existing fiberglass tub and walls
- Remove existing diverter valve
- Supply and install new mold/water resistant greenboard on back wall and two side walls
- Supply and install new tub/shower diverter valve from Wolverine Brass Inc.
- Supply and install new 60 x 30 x 15 white acrylic replacement tub
- Supply and install new white acrylic walls on back wall and two side walls
- Supply and install new chrome 24inch grab bar and white acrylic four shelf corner caddy
- Supply and install new Raincan shower hand held shower head with 5’ hose and glide bar
- Clean, caulk, haul and dispose all debris to an off sight dumpster
- SUBMIT QUOTE ON YOUR COMPANY LETTERHEAD AND MAKE SURE YOU ADD YOUR UEI# AS WELL.
Files
| File | Type | Posted |
|---|---|---|
| Standard Bathtub.jpg | JPG image | |
| SOW.Q2.Bath.Repairs.docx | DOCX document |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity