Baltimore National Cemetery Install Concrete Support System, Raise, Realign & Reset Headstones, Clean Upright Headstones and Renovate Turf with Sod/Sections R, A, O, DSS, C 2C & E.
Award Notice Posted
- Solicitation number
- VA78616R0090
- Agency
-
National Cemetery Administration
Department of Veterans Affairs
- Awarded
- to Native Contractors, Inc.
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- Contract number
- VA786-16-C-0098 Federal contract award
- NAICS code
- 812220 Cemeteries and Crematories
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
RE: Questions and Answer for VA786-16-R-0090
1. If the alternates are taken will there be a project performance extension, if so how much time will be added onto the time given to perform this project?
Answer: Period of performance would be extended an additional 1.5 years if all three add alternates are approved.
2. In the event that casketed remains are found within the proposed concrete beam area (reviled by test holes) will they be relocated by cemetery personal and if so in what time frame?
Answer: Casketed remains will be moved by cemetery personnel as soon as they can be once the COR is notified by the Contractor.
3. Where we perform test digging for the beam supports in cremation sections, are the cremations in cardboard boxes, plastic bags or some sort of metal container?
Answer: Cremation containers can vary in what they are made from as well as the size. Some may be ceramic, some may be metal, but most commonly are made of plastic. Size may be from 8 3/4" - 14" outside height, 9 3/4" -15 3/8" outside width and 20 1/16" to 36 1/4" in length.
4. CLIN 0001 calls for hand digging 24"W x 24"L x 3'4" D but all alternate CLINS (A-C) require 12"W x 12"L x 3'4"D. We want to make sure that the requirement is correct as listed in that the required dimensions are significantly different for the base vs the alternate CLINS.
Answer: This is an error. Alternates CLIN A001, B001, C001 should read the same as CLIN 0001. Please use the below pricing schedule for alternates.
Add Alternate #1
ITEM NO. DESCRIPTION EST.
QTY UNIT UNIT PRICE TOTAL PRICE
A001 Baltimore National Cemetery: Service - Hand digging of inspection pit to determine if cremains or casketed remains need to be re-positioned before digging of trench to install concrete support system. The size of the inspection pit will be dug twenty four (24) inches wide from the centerline of the headstone into the gravesite, by twenty four (24) inches long, by 3'-4" deep. Section: B 1,097 EA $_________ $____________
*A002 Baltimore National Cemetery Construction - Furnish and Install Reinforced Concrete Headstone Grid System. Section: B 1 Job $_________ $____________
A003 Baltimore National Cemetery / Service - Raise, Lower, Realign, Reset & Backfill Standard Upright Marble Headstones onto Concrete Marker Grid Support System. Cemetery Section: B 1,097 Ea. $_________ $____________
A004 Baltimore National Cemetery Service - Fabricate and Install five (5) Permanent Control Markers. Cemetery Section: B Control mark monuments of 100 mm (4") minimum round concrete should extend below the frost line with 10 mm x 75 mm (3/8"x 3") minimum copper pin in the center. Install plumb 100 mm (4") above finished grade. Indicate top elevation. 5 Ea. $_________ $_____________
A005 Baltimore National Cemetery Service - Clean Standard Upright Marble Headstones w / D2 Biological Solution. Cemetery Section: B 1,097 Ea. $_________ $____________
A006 Baltimore National Cemetery Service - Renovate & Replace Existing Cemetery Turf With Sod. Cemetery Section: B 50,950 SF $_________ $____________
A007 Baltimore National Cemetery Service - Project Related Dead Tree Removal. Tree removal to be provided on an "As-Needed / As-Requested" basis. 6 HR $_________ $____________
GRAND TOTAL ESTIMATED PRICE: $ ___________
?
Add Alternate #2
ITEM NO. DESCRIPTION EST.
QTY UNIT UNIT PRICE TOTAL PRICE
B001 Baltimore National Cemetery: Service - Hand digging of inspection pit to determine if cremains or casketed remains need to be re-positioned before digging of trench to install concrete support system. The size of the inspection pit will be dug twenty four (24) inches wide from the centerline of the headstone into the gravesite, by twenty four (24) inches long, by 3'-4" deep. Section: G 2,410 EA $_________ $____________
*B002 Baltimore National Cemetery Construction - Furnish and Install Reinforced Concrete Headstone Grid System. Section: G 1 Job $_________ $____________
B003 Baltimore National Cemetery / Service - Raise, Lower, Realign, Reset & Backfill Standard Upright Marble Headstones onto Concrete Marker Grid Support System. Cemetery Section: G 2,410 Ea. $_________ $____________
B004 Baltimore National Cemetery Service - Fabricate and Install five (5) Permanent Control Markers. Cemetery Section: G Control mark monuments of 100 mm (4") minimum round concrete should extend below the frost line with 10 mm x 75 mm (3/8"x 3") minimum copper pin in the center. Install plumb 100 mm (4") above finished grade. Indicate top elevation. 5 Ea. $_________ $_____________
B005 Baltimore National Cemetery Service - Clean Standard Upright Marble Headstones w / D2 Biological Solution. Cemetery Section: G 2,410 Ea. $_________ $____________
B006 Baltimore National Cemetery Service - Renovate & Replace Existing Cemetery Turf With Sod. Cemetery Section: G 120,500 SF $_________ $____________
B007 Baltimore National Cemetery Service - Project Related Dead Tree Removal. Tree removal to be provided on an "As-Needed / As-Requested" basis. 6 HR $_________ $____________
GRAND TOTAL ESTIMATED PRICE: $ ___________
Add Alternate #3
ITEM NO. DESCRIPTION EST.
QTY UNIT UNIT PRICE TOTAL PRICE
C001 Baltimore National Cemetery: Service - Hand digging of inspection pit to determine if cremains or casketed remains need to be re-positioned before digging of trench to install concrete support system. The size of the inspection pit will be dug twenty four (24) inches wide from the centerline of the headstone into the gravesite, by twenty four (24) inches long, by 3'-4" deep. Section: D 3,324 EA $_________ $____________
*C002 Baltimore National Cemetery Construction - Furnish and Install Reinforced Concrete Headstone Grid System. Section: D 1 Job $_________ $____________
C003 Baltimore National Cemetery / Service - Raise, Lower, Realign, Reset & Backfill Standard Upright Marble Headstones onto Concrete Marker Grid Support System. Cemetery Section: D 3,324 Ea. $_________ $____________
C004 Baltimore National Cemetery Service - Fabricate and Install five (5) Permanent Control Markers. Cemetery Section: D Control mark monuments of 100 mm (4") minimum round concrete should extend below the frost line with 10 mm x 75 mm (3/8"x 3") minimum copper pin in the center. Install plumb 100 mm (4") above finished grade. Indicate top elevation. 5 Ea. $_________ $_____________
C005 Baltimore National Cemetery Service - Clean Standard Upright Marble Headstones w / D2 Biological Solution. Cemetery Section: D 3,324 Ea. $_________ $____________
C006 Baltimore National Cemetery Service - Renovate & Replace Existing Cemetery Turf With Sod. Cemetery Section: D 166,200 SF $_________ $____________
C007 Baltimore National Cemetery Service - Project Related Dead Tree Removal. Tree removal to be provided on an "As-Needed / As-Requested" basis. 6 HR $_________ $____________
GRAND TOTAL ESTIMATED PRICE: $ ___________
Update #1 ·
The National Cemetery Administration is soliciting offers under Solicitation No. VA786-16-R-0090 for the following service:
The intent of an awarded contract shall be to perform Shrine Project at Baltimore National Cemetery, 5501 Frederick Ave Baltimore, MD 21228
Contractor shall furnish all equipment, parts, materials, labor and supervision necessary to (i) furnish / install reinforced concrete Headstone Grid Support System, (ii) Raise, Lower, Realign, Reset & Backfill standard Upright Marble Headstones onto new Headstone Grid Support System, (iii) fabricate and install permanent control markers (iv) clean upright headstones, and (v) renovate turf with sod at the Baltimore National Cemetery, 5501 Frederick Ave. Baltimore, MD 21228. Term of the contract shall be twenty four (24) months from date of award. The Contractor shall complete all work within 730 calendar days (24 months) after receipt of Notice of Award, subject to all terms, conditions, provisions, and schedules of the contract.
Work shall be performed in strict accordance with all terms, conditions, specifications, schedules and drawings. Performance shall be in accordance with the requirements, conditions, terms and representations contained in this solicitation, any pertinent OSHA Occupational and Safety regulations, and any State and/or local regulations, laws and codes.
This acquisition is 100% set aside for Service Disabled Veteran Owned Small Business (SDVOSB). The NAICS Code is 812220. Size standard is $20.5 Million. An electronic solicitation VA786-16-r-0090 is available for download from http://www.fbo.gov. Responses to the solicitation are due at 2pm EST. on 03/14/2016. Any amendments to the solicitation will also be available at www.fbo.gov. Offerors are advised they are responsible for obtaining any amendments.
See separate attachment for the solicitation VA786-16-R-0090 and another document.
Failure to submit all documentation required as required so, may result in your submission being determined non-responsive and removed from further consideration.
See attached document: VA786-16-R-0090 Solicitation
See attached document: Attachment M - Headstone Support system Standard Detail.
Files
| File | Type | Posted |
|---|---|---|
| VA786-16-C-0098-000.docx | DOCX document | |
| VA786-16-R-0090-A00001000.docx | DOCX document | |
| VA786-16-R-0090-000.docx | DOCX document | |
| VA786-16-R-0090-002.pdf | ||
| VA786-16-R-0090-003.pdf | ||
| VA786-16-R-0090-001.pdf | ||
| VA786-16-R-0090-004.pdf |