B1825 lightning protection system
Closed Solicitation Posted
- Solicitation number
- FA462626Q0008
- Agency
-
Global Strike Command
Air Force, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 238290 Other Building Equipment Contractors
- Place of performance
- Malmstrom AFB, Montana 59402, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Global Strike Command is soliciting quotes for a lightning protection system (LPS) upgrade and inspection at Building 1825, Malmstrom Air Force Base, Montana under Solicitation FA462626Q00080001. The work encompasses three line items: mobilization, upsizing overhead cables to AWG 4/0 copper and repairing frayed cable to comply with NFPA 780 Chapter 8 standards, and performing comprehensive acceptance testing of the LPS including ground system inspections and resistance measurements. The contractor must hold a valid Montana Contractor's License and have completed Senior Inspector AMMO-47 or better training (modified from the original AMMO-50 requirement via amendment issued March 16, 2026). Award will be made to the lowest-priced quote among the three lowest-priced conforming quotes that provides best value to the government, with evaluation based on price and conformance to the Performance Work Statement. The revised proposal due date is March 20, 2026, at 1:00 PM local time, with all work to be completed within 90 calendar days from the Notice to Proceed.
This is a 100 percent small business set-aside with no incumbent contractor identified in the solicitation documents. The contract is classified under NAICS 238290 (Other Building Equipment Contractors) with a size standard of $22,000,000, and no specific budget range or award value is disclosed in the available documents. All three line items are priced on a firm fixed-price basis with delivery required to Malmstrom AFB, Montana on a Firm, Ordered at Destination (FOB Destination) basis. The contractor must supply all labor, materials, equipment (including a man-lift), vehicles, and portable power, with work scheduled Monday through Friday from 7:00 a.m. to 5:00 p.m., excluding federal holidays. Work will be performed at Malmstrom Air Force Base in Malta, Montana, with inspection and acceptance occurring at both the contractor's facility and the destination (341 CES CECR Base SRMC), and the contractor must deliver hard copies and digital CDs of acceptance testing results along with a UL Lightning Protection Inspection Certificate certified to NFPA 780 Chapter 8.
Notice text
2 versions
Update #2 · Latest ·
This requirement is to provide all items, articles, materials, operations, or methods listed, mentioned or scheduled on the drawings and/or as specified herein, including all labor, materials, equipment, and incidentals necessary and required for completion of a lightning protection system (LPS) upgrade and inspection. The LPS system cables shall be up sized to AWG 4/0 (approximately ½”) copper to bring the system up to code, and a small quantity of frayed cable will be replaced. The LPS inspection shall be compliant with the most current edition of NFPA 780. The Contractor shall provide and deliver to the United States Air Force a hard copy and a digital CD of the acceptance testing results and the UL Lightning Protection Inspection Certificate for the facility. The UL Lightning Protection Inspection Certificate shall be certified to NFPA 780 Chapter 8. The Contractor shall have attended and completed the Senior Inspector AMMO 47 or better training or equivalent.
Please See attached SOW for complete details.
Update #1 ·
This requirement is to provide all items, articles, materials, operations, or methods listed, mentioned or scheduled on the drawings and/or as specified herein, including all labor, materials, equipment, and incidentals necessary and required for completion of a lightning protection system (LPS) upgrade and inspection. The LPS system cables shall be up sized to AWG 4/0 (approximately ½”) copper to bring the system up to code, and a small quantity of frayed cable will be replaced. The LPS inspection shall be compliant with the most current edition of NFPA 780. The Contractor shall provide and deliver to the United States Air Force a hard copy and a digital CD of the acceptance testing results and the UL Lightning Protection Inspection Certificate for the facility. The UL Lightning Protection Inspection Certificate shall be certified to NFPA 780 Chapter 8. The Contractor shall have attended and completed the Senior Inspector AMMO 50 training or equivalent.
Please See attached SOW for complete details.
Files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment - FA462626Q00080001.pdf | ||
| Solicitation Amendment FA462626Q00080001 SF 30.pdf | ||
| Solicitation - FA462626Q0008.pdf | ||
| SOW Bldg 1825 Lightning Protection System.docx | DOCX document | |
| SOW Attachment 2 - Photograph.docx | DOCX document | |
| SOW Attachment 1 - WSA Site Map (LPS).pdf | ||
| Pricing Schedule.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| USDA Forest Service - Hebgen Lake District Office Network Cabling and IT Room Improvements | Forest Service | Total Small Business | |
| WWYK260004 - repair structural integrity, B1134, post 34 & north wall | Air Force Sustainment Center | Total Small Business | |
| Airfield Blast Shield | Global Strike Command | Total Small Business | |
| PKA Relocatable Facility | Global Strike Command | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity