This is a contract line item (CLIN) pricing table for a lightning protection system upgrade and acceptance testing project at Building 1825. The contract consists of three line items totaling three separate efforts, each priced as a single unit (EA).

CLIN 0001 covers mobilization activities. CLIN 0002 addresses the upgrade work, specifically upsizing overhead wires to comply with NFPA 780 Chapter 8 standards and repairing a small quantity of frayed cable. The third line item, also designated CLIN 0002, requires comprehensive acceptance testing of the lightning protection system (LPS) at Building 1825 in accordance with UFC (Unified Facilities Criteria) standards. The acceptance testing scope includes identifying and inspecting all test points for ground system connections and bonds, providing a sketch with identified test points, testing each grounding system connection or bond, recording resistance measurements on test forms, submitting completed test forms to the Government, and providing a UL Lightning Protection Certificate certified to NFPA 780 Chapter 8 standards. Unit prices and total contract amount fields are blank in this document, indicating this is a pricing template awaiting cost proposals.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Building 1825 Lightning Protection System Upgrade and Acceptance Testing

CLIN Description Quantity Unit of

Measure Unit Price Amount

0001 Mobilization 1 EA.

Upsize overhead wires to comply with NFPA 780 Chapter 8. Repair small quantity of frayed cable.

1 EA.

Perform acceptance testing of LPS at Building 1825 per UFC to include identifying and inspecting all test points for the ground system connection and bonds, providing a sketch with identified test points, testing each grounding system connection or bond, recording the resistance measurement on a copy of the test form, submitting a copy of the test form to the Government, and providing a UL Lightning Protection Certificate that is certified to NFPA 780 Chapter 8.

1 EA.

TOTAL

File details come from the government source that posted it. Updated .