B-21 Phase Maintenance Hangar
Closed Solicitation Posted
- Solicitation number
- W9128F24R0011
- Agency
-
ENDIST Omaha
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Corps of Engineers Engineering District Omaha is seeking contractors to construct a new approximately 80,000 square foot two-bay hangar facility and associated infrastructure for maintenance of the emerging B-21 airframe. The project will comply with all applicable DoD, Air Force, and base design standards, including permanent construction in accordance with the DoD Unified Facilities Criteria and cybersecurity measures. Proposals will be evaluated based on the contractor's ability to meet these requirements. The solicitation is due on May 14, 2024, and questions from interested parties will be accepted prior to the proposal deadline.
This solicitation is not set aside for any particular business type. There is no incumbent information provided. The estimated value of the contract is not specified, but the project will involve the construction of the new hangar facility and associated infrastructure. The work will take place at a Department of Defense facility, though the specific location is not named.
Notice text
8 versions
Update #8 · Latest ·
/// Amendment 0007 - Updated Wage Determination /// Amendment 0006 - Extend the Government Acceptance Period of Proposals to 24 MAY 2024 // Amendment 0005 - Updated Specifications and Drawings, Updated Clauses, Updated Wage Rates // Amendment 0004 - Updated Specification and Drawings, Revised Proposal Due Date, Added Clause // Amendment 0003 - Updated Specifications and Drawings // Amendment 0002 - Issue 100% Design Specifications and Request for Volume II Proposals // Amendment 0001 - DIV 00 22 00 Updates // This project will construct a new +/- 80,000 SF two-bay hangar facility and associated airfield apron, site features, utilities, and infrastructure for maintenance of the emerging B-21 airframe. The project will comply with all applicable DoD, Air Force, and base design standards. The Contractor must design facilities as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings and include cybersecurity measures per UFC 4-010-06, Cybersecurity of Facility-Related Control Systems.
Update #7 ·
Amendment 0006 - Extend the Government Acceptance Period of Proposals to 24 MAY 2024 // Amendment 0005 - Updated Specifications and Drawings, Updated Clauses, Updated Wage Rates // Amendment 0004 - Updated Specification and Drawings, Revised Proposal Due Date, Added Clause // Amendment 0003 - Updated Specifications and Drawings // Amendment 0002 - Issue 100% Design Specifications and Request for Volume II Proposals // Amendment 0001 - DIV 00 22 00 Updates // This project will construct a new +/- 80,000 SF two-bay hangar facility and associated airfield apron, site features, utilities, and infrastructure for maintenance of the emerging B-21 airframe. The project will comply with all applicable DoD, Air Force, and base design standards. The Contractor must design facilities as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings and include cybersecurity measures per UFC 4-010-06, Cybersecurity of Facility-Related Control Systems.
Update #6 ·
Amendment 0005 - Updated Specifications and Drawings, Updated Clauses, Updated Wage Rates // Amendment 0004 - Updated Specification and Drawings, Revised Proposal Due Date, Added Clause // Amendment 0003 - Updated Specifications and Drawings // Amendment 0002 - Issue 100% Design Specifications and Request for Volume II Proposals // Amendment 0001 - DIV 00 22 00 Updates // This project will construct a new +/- 80,000 SF two-bay hangar facility and associated airfield apron, site features, utilities, and infrastructure for maintenance of the emerging B-21 airframe. The project will comply with all applicable DoD, Air Force, and base design standards. The Contractor must design facilities as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings and include cybersecurity measures per UFC 4-010-06, Cybersecurity of Facility-Related Control Systems.
Update #5 ·
Amendment 0004 - Updated Specification and Drawings, Revised Proposal Due Date, Added Clause // Amendment 0003 - Updated Specifications and Drawings // Amendment 0002 - Issue 100% Design Specifications and Request for Volume II Proposals // Amendment 0001 - DIV 00 22 00 Updates // This project will construct a new +/- 80,000 SF two-bay hangar facility and associated airfield apron, site features, utilities, and infrastructure for maintenance of the emerging B-21 airframe. The project will comply with all applicable DoD, Air Force, and base design standards. The Contractor must design facilities as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings and include cybersecurity measures per UFC 4-010-06, Cybersecurity of Facility-Related Control Systems.
Update #4 ·
Amendment 0003 - Updated Specifications and Drawings // Amendment 0002 - Issue 100% Design Specifications and Request for Volume II Proposals // Amendment 0001 - DIV 00 22 00 Updates // This project will construct a new +/- 80,000 SF two-bay hangar facility and associated airfield apron, site features, utilities, and infrastructure for maintenance of the emerging B-21 airframe. The project will comply with all applicable DoD, Air Force, and base design standards. The Contractor must design facilities as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings and include cybersecurity measures per UFC 4-010-06, Cybersecurity of Facility-Related Control Systems.
Update #3 ·
***Amendment 0002 - Issue 100% Design Specifications and Request for Volume II Proposals*** Amendment 0001 - DIV 00 22 00 Updates *** This project will construct a new +/- 80,000 SF two-bay hangar facility and associated airfield apron, site features, utilities, and infrastructure for maintenance of the emerging B-21 airframe. The project will comply with all applicable DoD, Air Force, and base design standards. The Contractor must design facilities as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings and include cybersecurity measures per UFC 4-010-06, Cybersecurity of Facility-Related Control Systems.
Update #2 ·
*** Amendment 0001 - DIV 00 22 00 Updates ***This project will construct a new +/- 80,000 SF two-bay hangar facility and associated airfield apron, site features, utilities, and infrastructure for maintenance of the emerging B-21 airframe. The project will comply with all applicable DoD, Air Force, and base design standards. The Contractor must design facilities as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings and include cybersecurity measures per UFC 4-010-06, Cybersecurity of Facility-Related Control Systems.
Update #1 ·
This project will construct a new +/- 80,000 SF two-bay hangar facility and associated airfield apron, site features, utilities, and infrastructure for maintenance of the emerging B-21 airframe. The project will comply with all applicable DoD, Air Force, and base design standards. The Contractor must design facilities as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. This project will comply with DoD antiterrorism/force protection requirements per UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings and include cybersecurity measures per UFC 4-010-06, Cybersecurity of Facility-Related Control Systems.
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| B-21 Field Training Detachment Facility, Dyess AFB-OT Feasibility & Business Feedback | ENDIST Fort Worth | No set-aside | |
| Sources Sought - Construction Repair Building 6413 Secure Space (511669 & 519580) Barksdale AFB | ENDIST Fort Worth | No set-aside | |
| F-35 Composite Repair and Training Facility / F-35 Maintenance Facility, Hill Air Force Base, Utah | ENDIST Sacramento | No set-aside | |
| PKA Relocatable Facility | Global Strike Command | Total Small Business | |
| WWYK260004 - repair structural integrity, B1134, post 34 & north wall | Air Force Sustainment Center | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity