AZ/NV BR LCDO Hoover Dam Parking Lot Rehab

Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
6982AF22B000020
Agency
Responses due
Not on record
Set-aside
Total Small Business

Opportunity facts

Place of performance
Boulder City, Nevada 89005, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This notice provides details for the AZ/NV BR LCDO Hoover Dam Parking Lot Rehab project. The Department of Transportation Federal Highway Administration seeks to accomplish pavement preservation for 17 parking lots along the Hoover Dam Access Road. The scope of work includes full depth patching, crack sealing, surface treatment, permanent pavement markings and permanent signing, as well as a slope failure repair and rock lining installation. Evaluation criteria and contract terms are not disclosed, though the anticipated schedule targets advertisement in July 2022, award in August 2022, notice to proceed in September 2022, and completion by December 2022.

This opportunity is set aside for total small businesses. Principal work items include approximately 48,500 square yards of fog seal, 4.2 miles of crack sealing, 250 square yards of asphalt patching, 425 cubic yards of riprap installation, 13.5 miles of pavement markings, 105 pavement marking symbols and 65 sign systems. The total budget and award values are not specified, though the timeline anticipates construction completion by the end of 2022.

Notice text

2 versions

Update #2 · Latest ·

THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.

This project is being set aside for Small Businesses 

Project Details: AZ/NV BR LCDO Hoover Dam Parking Lots Rehab

PROJECT DESCRIPTION:  This project proposes to accomplish pavement preservation for parking lots in 
the vicinity to the Hoover Dam. The project begins at the Clark County/Bureau of Reclamation 
boundary, approximately 750 feet west of the security checkpoint on the Nevada side and continues 
across the Hoover Dam, ending at the turnaround parking lot on the Arizona side. Timely completion 
of construction will be crucial to minimize parking lot closures and impact on visitors and 
traffic.
SCOPE OF THE WORK:  The project proposes to accomplish pavement preservation for 17 parking lots 
along the Hoover Dam Access Road. The pavement preservation would include full depth patching, 
crack sealing, surface treatment, permanent pavement markings and permanent signing. The project 
also includes a slope failure repair on the mainline and rock lining under recently installed 
guardrail for erosion protection.
PRINCIPAL WORK ITEMS: Approximate quantities of principal work items
include:
48,500 square yards of fog seal
4.2 miles of cleaning and sealing of cracks
250 square yards of asphalt concrete pavement patch
425 cubic yards of placed riprap
13.5 miles of pavement markings
105 pavement marking symbols
65 sign systems
ANTICIPATED SCHEDULE:
Advertisement: September 2022

Contract Award: November 2022 

Notice to Proceed: December 2022

Construction Complete: May 2023

Update #1 ·

THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.

This project is being set aside for Small Businesses 

Project Details: AZ/NV BR LCDO Hoover Dam Parking Lots Rehab

PROJECT DESCRIPTION:  This project proposes to accomplish pavement preservation for parking lots in 
the vicinity to the Hoover Dam. The project begins at the Clark County/Bureau of Reclamation 
boundary, approximately 750 feet west of the security checkpoint on the Nevada side and continues 
across the Hoover Dam, ending at the turnaround parking lot on the Arizona side. Timely completion 
of construction will be crucial to minimize parking lot closures and impact on visitors and 
traffic.
SCOPE OF THE WORK:  The project proposes to accomplish pavement preservation for 17 parking lots 
along the Hoover Dam Access Road. The pavement preservation would include full depth patching, 
crack sealing, surface treatment, permanent pavement markings and permanent signing. The project 
also includes a slope failure repair on the mainline and rock lining under recently installed 
guardrail for erosion protection.
PRINCIPAL WORK ITEMS: Approximate quantities of principal work items
include:
48,500 square yards of fog seal
4.2 miles of cleaning and sealing of cracks
250 square yards of asphalt concrete pavement patch
425 cubic yards of placed riprap
13.5 miles of pavement markings
105 pavement marking symbols
65 sign systems
ANTICIPATED SCHEDULE:
Advertisement: July 2022
Contract Award: August 2022 

Notice to Proceed: September 2022

Construction Complete: December 2022

Notice history

Notice Type Posted
AZ/NV BR LCDO Hoover Dam Parking Lot Rehab Award Award Notice
AZ/NV BR LCDO Hoover Dam Parking Lot Rehab Latest solicitation Solicitation
This notice Pre-Solicitation
AZ/NV BR LCDO Hoover Dam Parking Lot Rehab Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Northeast Region Pavement and Bridge Preservation Construction - NP NER PMS BMS FY24(1) New York, United States · NAICS 237310 Federal Highway Administration Total Small Business
Administrative Parking Lot Repairs Colorado 80526, United States · NAICS 237310 Forest Service Total Small Business
AZ BL COLO 7528(1) Burro Creek Road Kingman, Arizona 86401, United States · NAICS 237310 Federal Highway Administration Total Small Business
NPS Repair or Alteration of Highways, Roads, Streets, Trails and Bridges Multip NAICS 237310 — No set-aside
Cableway crane refurbishment NAICS 237990 Bureau of Reclamation No set-aside