AZ/NV BR LCDO Hoover Dam Parking Lot Rehab
Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 6982AF22B000020
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Not on record
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Boulder City, Nevada 89005, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This notice provides details for the AZ/NV BR LCDO Hoover Dam Parking Lot Rehab project. The Department of Transportation Federal Highway Administration seeks to accomplish pavement preservation for 17 parking lots along the Hoover Dam Access Road. The scope of work includes full depth patching, crack sealing, surface treatment, permanent pavement markings and permanent signing, as well as a slope failure repair and rock lining installation. Evaluation criteria and contract terms are not disclosed, though the anticipated schedule targets advertisement in July 2022, award in August 2022, notice to proceed in September 2022, and completion by December 2022.
This opportunity is set aside for total small businesses. Principal work items include approximately 48,500 square yards of fog seal, 4.2 miles of crack sealing, 250 square yards of asphalt patching, 425 cubic yards of riprap installation, 13.5 miles of pavement markings, 105 pavement marking symbols and 65 sign systems. The total budget and award values are not specified, though the timeline anticipates construction completion by the end of 2022.
Notice text
2 versions
Update #2 · Latest ·
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
This project is being set aside for Small Businesses
Project Details: AZ/NV BR LCDO Hoover Dam Parking Lots Rehab
PROJECT DESCRIPTION: This project proposes to accomplish pavement preservation for parking lots in
the vicinity to the Hoover Dam. The project begins at the Clark County/Bureau of Reclamation
boundary, approximately 750 feet west of the security checkpoint on the Nevada side and continues
across the Hoover Dam, ending at the turnaround parking lot on the Arizona side. Timely completion
of construction will be crucial to minimize parking lot closures and impact on visitors and
traffic.
SCOPE OF THE WORK: The project proposes to accomplish pavement preservation for 17 parking lots
along the Hoover Dam Access Road. The pavement preservation would include full depth patching,
crack sealing, surface treatment, permanent pavement markings and permanent signing. The project
also includes a slope failure repair on the mainline and rock lining under recently installed
guardrail for erosion protection.
PRINCIPAL WORK ITEMS: Approximate quantities of principal work items
include:
48,500 square yards of fog seal
4.2 miles of cleaning and sealing of cracks
250 square yards of asphalt concrete pavement patch
425 cubic yards of placed riprap
13.5 miles of pavement markings
105 pavement marking symbols
65 sign systems
ANTICIPATED SCHEDULE:
Advertisement: September 2022
Contract Award: November 2022
Notice to Proceed: December 2022
Construction Complete: May 2023
Update #1 ·
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
This project is being set aside for Small Businesses
Project Details: AZ/NV BR LCDO Hoover Dam Parking Lots Rehab
PROJECT DESCRIPTION: This project proposes to accomplish pavement preservation for parking lots in
the vicinity to the Hoover Dam. The project begins at the Clark County/Bureau of Reclamation
boundary, approximately 750 feet west of the security checkpoint on the Nevada side and continues
across the Hoover Dam, ending at the turnaround parking lot on the Arizona side. Timely completion
of construction will be crucial to minimize parking lot closures and impact on visitors and
traffic.
SCOPE OF THE WORK: The project proposes to accomplish pavement preservation for 17 parking lots
along the Hoover Dam Access Road. The pavement preservation would include full depth patching,
crack sealing, surface treatment, permanent pavement markings and permanent signing. The project
also includes a slope failure repair on the mainline and rock lining under recently installed
guardrail for erosion protection.
PRINCIPAL WORK ITEMS: Approximate quantities of principal work items
include:
48,500 square yards of fog seal
4.2 miles of cleaning and sealing of cracks
250 square yards of asphalt concrete pavement patch
425 cubic yards of placed riprap
13.5 miles of pavement markings
105 pavement marking symbols
65 sign systems
ANTICIPATED SCHEDULE:
Advertisement: July 2022
Contract Award: August 2022
Notice to Proceed: September 2022
Construction Complete: December 2022
Notice history
| Notice | Type | Posted |
|---|---|---|
| AZ/NV BR LCDO Hoover Dam Parking Lot Rehab | Award Notice | |
| AZ/NV BR LCDO Hoover Dam Parking Lot Rehab | Solicitation | |
| This notice | Pre-Solicitation | |
| AZ/NV BR LCDO Hoover Dam Parking Lot Rehab | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Northeast Region Pavement and Bridge Preservation Construction - NP NER PMS BMS FY24(1) | Federal Highway Administration | Total Small Business | |
| Administrative Parking Lot Repairs | Forest Service | Total Small Business | |
| AZ BL COLO 7528(1) Burro Creek Road | Federal Highway Administration | Total Small Business | |
| NPS Repair or Alteration of Highways, Roads, Streets, Trails and Bridges Multip | — | No set-aside | |
| Cableway crane refurbishment | Bureau of Reclamation | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity