AZ FTNP PEFO 10(7) Main Park Road

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
6982AF20B000003
Agency
Federal Highway Administration Department of Transportation
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
Petrified Forest National Park, Arizona, United States

Notice details come from SAM.gov. Updated .

Notice text

6 versions

Update #6 · Latest ·

AZ FTNP PEFO 10(7) Main Park Road Bid Opening Summary

Update #5 ·

AZ FTNP PEFO 10(7) Main Park Road Amendment A003

Update #4 ·

This correctes the error in the bid date from 2014 to 2019. 

Update #3 ·

This update extends the bid opening date.

Update #2 ·

 

THIS PROJECT IS BEING ADVERTISED AS A TOTAL SMALL BUSINESS SET-ASIDE.

THIS IS AN INVITATION FOR BID – PLANS AND SPECIFICATIONS ARE AVAILABLE.

PROJECT NAME: AZ FTNP PEFO 10(7) Main Park Road

PROJECT DESCRIPTION:  This project in includes reconstruction of 14.52 miles of the Main Park road, the installation of multi-cell box culverts in three different locations, concrete curb, and installation of 120 culverts located within Petrified Forest National Park.

The major work elements include cold recycle asphalt base course using the existing pavement, subgrade preparation, finish grading, asphalt concrete paving, concrete curb, replacement of CMP culverts, and riprap placement. 


SIGNIFICANT QUANTITIES:

Significant Items for Schedule A Include: 74,000 SQYD of cold in-place recycled asphalt base course 6” depth, 9,800 TONS of hot asphalt concrete paving, 810 LNFT of 24 inch of Dual wall HDPE culvert, 235 of LNFT 36 inch of Dual wall HDPE culvert, 600 LNFT of 24 inch culvert pipe lining, 170 LNFT of 8 feet span by 3 feet rise precast reinforced concrete box culvert, 600 CUYD of roadway excavation, 6,000 CUYD of sub excavation, 2,290 LNFT of 12 inch colored concrete curb, and 350 LNFT of Guardrail system MGS, type 2 with steel posts and terminal sections.

Significant Items for Option X Include: 87,000 SQYD of cold in-place recycled asphalt base course 6” depth, 10,500 TONS of hot asphalt concrete paving, 900 LNFT of 24 inch of Dual wall HDPE culvert, 82 LNFT of 36 inch of Dual wall HDPE culvert, 1,800 LNFT of 24 inch culvert pipe lining, 240 LNFT of 36 inch culvert pipe lining, 900 CUYD of roadway excavation, 4,500 CUYD of sub excavation, and 7,000 LNFT of 12 inch colored concrete curb.

 

Significant Items for Option Y Include: 54,000 SQYD of cold in-place recycled asphalt base course 6” depth, 8,700 TONS of hot asphalt concrete paving, 800 LNFT of 24 inch of Dual wall HDPE culvert, 50 LNFT of 36 inch of Dual wall HDPE culvert, 330 LNFT of 24 inch culvert pipe lining, 16,500 CUYD of sub excavation, and 480 LNFT of 12 inch colored concrete curb.

COST RANGE: Estimated total cost for Schedule A, Option X, and Option Y is $10,000,000 to $12,000,000.

CONSTRUCTION DURATION: December, 2019 through July, 2020.

ADDITIONAL INFORMATION:

Anticipated award late November, 2019.


 

Update #1 ·

 

THIS PROJECT WILL BE ADVERTISED AS A TOTAL SMALL BUSINESS SET-ASIDE.

THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.

PROJECT NAME: AZ FTNP PEFO 10(7) Main Park Road

PROJECT DESCRIPTION:  This project in includes reconstruction of 14.52 miles of the Main Park road, the installation of multi-cell box culverts in three different locations, concrete curb, and installation of 120 culverts located within Petrified Forest National Park.

The major work elements include cold recycle asphalt base course using the existing pavement, subgrade preparation, finish grading, asphalt concrete paving, concrete curb, replacement of CMP culverts, and riprap placement. 


SIGNIFICANT QUANTITIES:

Significant Items for Schedule A Include: 74,000 SQYD of cold in-place recycled asphalt base course 6” depth, 9,800 TONS of hot asphalt concrete paving, 810 LNFT of 24 inch of Dual wall HDPE culvert, 235 of LNFT 36 inch of Dual wall HDPE culvert, 600 LNFT of 24 inch culvert pipe lining, 170 LNFT of 8 feet span by 3 feet rise precast reinforced concrete box culvert, 600 CUYD of roadway excavation, 6,000 CUYD of sub excavation, 2,290 LNFT of 12 inch colored concrete curb, and 350 LNFT of Guardrail system MGS, type 2 with steel posts and terminal sections.

Significant Items for Option X Include: 87,000 SQYD of cold in-place recycled asphalt base course 6” depth, 10,500 TONS of hot asphalt concrete paving, 900 LNFT of 24 inch of Dual wall HDPE culvert, 82 LNFT of 36 inch of Dual wall HDPE culvert, 1,800 LNFT of 24 inch culvert pipe lining, 240 LNFT of 36 inch culvert pipe lining, 900 CUYD of roadway excavation, 4,500 CUYD of sub excavation, and 7,000 LNFT of 12 inch colored concrete curb.

 

Significant Items for Option Y Include: 54,000 SQYD of cold in-place recycled asphalt base course 6” depth, 8,700 TONS of hot asphalt concrete paving, 800 LNFT of 24 inch of Dual wall HDPE culvert, 50 LNFT of 36 inch of Dual wall HDPE culvert, 330 LNFT of 24 inch culvert pipe lining, 16,500 CUYD of sub excavation, and 480 LNFT of 12 inch colored concrete curb.

COST RANGE: Estimated total cost for Schedule A, Option X, and Option Y is $14,000,000 to $19,000,000.

CONSTRUCTION DURATION: November, 2019 through July, 2020.

ADDITIONAL INFORMATION:

Anticipated advertisement in October, 2019.

Anticipated bid opening in November, 2019.

Anticipated award in November, 2019.


 

Attachments

Files attached to this notice, newest first
File Type Posted
Bid Tabulation All Bidders.pdf PDF
Bid Opening Summary - AZ FTNP PEFO 10(7) Main Park Road .pdf PDF
SF30 A004.pdf PDF
QnA 11.19.2019.pdf PDF
SF30 A003.pdf PDF
SF30 A003 11_14_2019.pdf PDF
SF30 A002 11_13_2019.pdf PDF
SF30_A001.pdf PDF
QnA_10.30.19.pdf PDF
PEFO_Traffic_Counts.pdf PDF
AZ_FTNP_PEFO_10(7)_Bridges_Final_Geotechnical_Report_2019-09-06.pdf PDF
6982AF20B000003_AZ_FTNP_PEFO_10(7)_IFB.pdf PDF
Final_Hydraulics_Memorandum_-_PEFO_-_09112019_signed10-9-19.pdf PDF
AZ_PEFO_10-7_Plans_Final_signed.pdf PDF
Show all 14

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
AZ FTNP PEFO 10(7) Main Park Road Award Award Notice
AZ FTNP PEFO 10(7) Main Park Road This notice · Latest solicitation Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity