Bid Tabulation All Bidders.pdf

PDF 180 KB Posted

Attached to
AZ FTNP PEFO 10(7) Main Park Road Federal contract opportunity
Solicitation number
6982AF20B000003
Issued by
Department of Transportation Federal Highway Administration

View the file

Other files for this federal contract opportunity

Other files attached to AZ FTNP PEFO 10(7) Main Park Road, newest first.
File Type Posted
Bid Opening Summary - AZ FTNP PEFO 10(7) Main Park Road .pdf PDF
SF30 A004.pdf PDF
QnA 11.19.2019.pdf PDF
SF30 A003.pdf PDF
SF30 A003 11_14_2019.pdf PDF
SF30 A002 11_13_2019.pdf PDF
SF30_A001.pdf PDF
QnA_10.30.19.pdf PDF
PEFO_Traffic_Counts.pdf PDF
AZ_FTNP_PEFO_10(7)_Bridges_Final_Geotechnical_Report_2019-09-06.pdf PDF
6982AF20B000003_AZ_FTNP_PEFO_10(7)_IFB.pdf PDF
Final_Hydraulics_Memorandum_-_PEFO_-_09112019_signed10-9-19.pdf PDF
AZ_PEFO_10-7_Plans_Final_signed.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 11/25/19

1 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Contractor Responsive?

Engineer's Estimate

Kirkland Construction LLLP

Meridian Engineering Company

Stormwater Plans, LLC dba SWP Contracting and Paving

Base Schedule A

$7,920,593.00

$10,385,781.00

$9,531,034.00

$13,568,737.00

Option: X

$4,734,254.00

$5,171,632.50

$4,445,660.00

$6,180,286.00

Option: Y

$4,150,127.00

$4,641,525.00

$5,911,636.00

$6,384,310.00

Contractor Responsive?

Engineer's Estimate

Kirkland Construction LLLP

Meridian Engineering Company

Stormwater Plans, LLC dba SWP Contracting and Paving

Total Base Schedule A and Option(s): X

$12,654,847.00

$15,557,413.50

$13,976,694.00

$19,749,023.00

Total Base Schedule A and Option(s): XY

$16,804,974.00

$20,198,938.50

$19,888,330.00

$26,133,333.00

Total Base Schedule A and Option(s): Y

$12,070,720.00

$15,027,306.00

$15,442,670.00

$19,953,047.00

2 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Schedule: A

Schedule Type: Base

Solcitation No: 6982AF20B000003

Division: Central Federal Lands

State: AZ County: Apache, Navajo

Federal Land: Petrified Forest National Park Opened at: Lakewood, CO

Opened by: Leslie Karsten

Date: 11/21/19

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Meridian Engineering Company $9,531,034.00 3855 N. Business Center Drive Tucson, AZ 85705

Kirkland Construction LLLP $10,385,781.00 2101 Main St Rye, CO 81069

Stormwater Plans, LLC dba SWP Contracting and Paving $13,568,737.00 5624 N. 54th Avenue Glendale, AZ 85301

Engineer's Estimate $7,920,593.00

3 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0001 15101-0000 MOBILIZATION

Meridian Engineering Company Lump Sum $1,453,000.00 Kirkland Construction LLLP Lump Sum $1,000,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $1,350,000.00 Engineer's Estimate ALL LPSM Lump Sum $816,000.00

A0002 15210-3000 CENTERLINE, VERIFICATION AND STAKING

Meridian Engineering Company $4,500.00 $21,780.00 Kirkland Construction LLLP $2,500.00 $12,100.00 Stormwater Plans, LLC dba SWP Contracting and Paving $4,100.00 $19,844.00 Engineer's Estimate 4.84 MILE $3,600.00 $17,424.00

A0003 15215-2000 SURVEY AND STAKING, BRIDGE

Meridian Engineering Company $6,500.00 $26,000.00 Kirkland Construction LLLP $8,000.00 $32,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $4,100.00 $16,400.00 Engineer's Estimate 4 EACH $8,000.00 $32,000.00

A0004 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE

Meridian Engineering Company $800.00 $12,800.00 Kirkland Construction LLLP $1,000.00 $16,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $525.00 $8,400.00 Engineer's Estimate 16 EACH $1,000.00 $16,000.00

A0005 15215-5000 SURVEY AND STAKING, BOX CULVERT

Meridian Engineering Company $2,500.00 $5,000.00 Kirkland Construction LLLP $3,200.00 $6,400.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,750.00 $3,500.00 Engineer's Estimate 2 EACH $2,500.00 $5,000.00

A0006 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES

Meridian Engineering Company $8,000.00 $2,800.00 Kirkland Construction LLLP $10,000.00 $3,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $24,500.00 $8,575.00 Engineer's Estimate 0.35 MILE $10,000.00 $3,500.00

4 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0007 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL

Meridian Engineering Company $7,000.00 $2,450.00 Kirkland Construction LLLP $9,000.00 $3,150.00 Stormwater Plans, LLC dba SWP Contracting and Paving $14,000.00 $4,900.00 Engineer's Estimate 0.35 MILE $8,000.00 $2,800.00

A0008 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE

Meridian Engineering Company Lump Sum $65,000.00 Kirkland Construction LLLP Lump Sum $300,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $750,000.00 Engineer's Estimate ALL LPSM Lump Sum $170,000.00

A0009 15401-0000 CONTRACTOR TESTING

Meridian Engineering Company Lump Sum $170,000.00 Kirkland Construction LLLP Lump Sum $300,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $1,000,000.00 Engineer's Estimate ALL LPSM Lump Sum $136,000.00

A0010 15501-0000 CONSTRUCTION SCHEDULE

Meridian Engineering Company Lump Sum $5,000.00 Kirkland Construction LLLP Lump Sum $20,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $125,000.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00

A0011 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

Meridian Engineering Company $4.50 $18,000.00 Kirkland Construction LLLP $3.00 $12,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $3.50 $14,000.00 Engineer's Estimate 4,000 LNFT $4.00 $16,000.00

A0012 15802-0000 WATERING FOR DUST CONTROL

Meridian Engineering Company Lump Sum $80,000.00 Kirkland Construction LLLP Lump Sum $200,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $1,000,000.00 Engineer's Estimate ALL LPSM Lump Sum $7,500.00

5 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0013 20101-0000 CLEARING AND GRUBBING

Meridian Engineering Company $4,000.00 $8,000.00 Kirkland Construction LLLP $20,000.00 $40,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $6,100.00 $12,200.00 Engineer's Estimate 2.0 ACRE $6,000.00 $12,000.00

A0014 20301-1200 REMOVAL OF HEADWALL

Meridian Engineering Company $3,000.00 $3,000.00 Kirkland Construction LLLP $6,000.00 $6,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $3,850.00 $3,850.00 Engineer's Estimate 1 EACH $1,500.00 $1,500.00

A0015 20301-1400 REMOVAL OF INLET

Meridian Engineering Company $1,500.00 $9,000.00 Kirkland Construction LLLP $4,000.00 $24,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,275.00 $7,650.00 Engineer's Estimate 6 EACH $1,000.00 $6,000.00

A0016 20301-1900 REMOVAL OF PIPE CULVERT

Meridian Engineering Company $2,600.00 $85,800.00 Kirkland Construction LLLP $5,000.00 $165,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2,275.00 $75,075.00 Engineer's Estimate 33 EACH $1,500.00 $49,500.00

A0017 20301-2400 REMOVAL OF SIGN

Meridian Engineering Company $300.00 $4,800.00 Kirkland Construction LLLP $120.00 $1,920.00 Stormwater Plans, LLC dba SWP Contracting and Paving $140.00 $2,240.00 Engineer's Estimate 16 EACH $120.00 $1,920.00

A0018 20301-2700 REMOVAL OF STRUCTURE

Meridian Engineering Company $65,000.00 $195,000.00 Kirkland Construction LLLP $100,000.00 $300,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $125,000.00 $375,000.00 Engineer's Estimate 3 EACH $26,000.00 $78,000.00

6 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0019 20302-0150 REMOVAL OF BRIDGE RAILING

Meridian Engineering Company $10.00 $1,320.00 Kirkland Construction LLLP $24.00 $3,168.00 Stormwater Plans, LLC dba SWP Contracting and Paving $23.50 $3,102.00 Engineer's Estimate 132 LNFT $50.00 $6,600.00

A0020 20302-1200 REMOVAL OF GUARDRAIL

Meridian Engineering Company $7.50 $8,250.00 Kirkland Construction LLLP $6.00 $6,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $6.00 $6,600.00 Engineer's Estimate 1,100 LNFT $7.00 $7,700.00

A0021 20303-0000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS

Meridian Engineering Company $200.00 $7,000.00 Kirkland Construction LLLP $260.00 $9,100.00 Stormwater Plans, LLC dba SWP Contracting and Paving $180.00 $6,300.00 Engineer's Estimate 35 SQYD $35.00 $1,225.00

A0022 20303-0300 REMOVAL OF CONCRETE

Meridian Engineering Company $350.00 $19,250.00 Kirkland Construction LLLP $800.00 $44,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $250.00 $13,750.00 Engineer's Estimate 55 SQYD $70.00 $3,850.00

A0023 20315-0000 SAWCUTTING PAVEMENT

Meridian Engineering Company $1.00 $3,500.00 Kirkland Construction LLLP $13.00 $45,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2.30 $8,050.00 Engineer's Estimate 3,500 LNFT $2.10 $7,350.00

A0024 20401-0000 ROADWAY EXCAVATION

Meridian Engineering Company $35.00 $21,000.00 Kirkland Construction LLLP $53.00 $31,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $60.00 $36,000.00 Engineer's Estimate 600 CUYD $25.00 $15,000.00

7 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0025 20402-0000 SUBEXCAVATION

Meridian Engineering Company $170.00 $1,020,000.00 Kirkland Construction LLLP $85.00 $510,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $122.00 $732,000.00 Engineer's Estimate 6,000 CUYD $60.00 $360,000.00

A0026 20421-0000 ROCK EXCAVATION

Meridian Engineering Company $150.00 $9,000.00 Kirkland Construction LLLP $275.00 $16,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $9,000.00 Engineer's Estimate 60 CUYD $220.00 $13,200.00

A0027 20441-0000 WASTE

Meridian Engineering Company $25.00 $150,000.00 Kirkland Construction LLLP $45.00 $270,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $23.00 $138,000.00 Engineer's Estimate 6,000 CUYD $15.00 $90,000.00

A0028 20801-0000 STRUCTURE EXCAVATION

Meridian Engineering Company $23.00 $62,100.00 Kirkland Construction LLLP $42.00 $113,400.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1.20 $3,240.00 Engineer's Estimate 2,700 CUYD $45.00 $121,500.00

A0029 20802-0000 FOUNDATION FILL

Meridian Engineering Company $130.00 $35,100.00 Kirkland Construction LLLP $120.00 $32,400.00 Stormwater Plans, LLC dba SWP Contracting and Paving $110.00 $29,700.00 Engineer's Estimate 270 CUYD $70.00 $18,900.00

A0030 20803-0000 STRUCTURAL BACKFILL

Meridian Engineering Company $125.00 $73,750.00 Kirkland Construction LLLP $155.00 $91,450.00 Stormwater Plans, LLC dba SWP Contracting and Paving $120.00 $70,800.00 Engineer's Estimate 590 CUYD $75.00 $44,250.00

8 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0031 20810-0000 SHORING AND BRACING

Meridian Engineering Company Lump Sum $4,000.00 Kirkland Construction LLLP Lump Sum $11,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $250,000.00 Engineer's Estimate ALL LPSM Lump Sum $50,000.00

A0032 25101-2200 PLACED RIPRAP, METHOD B, CLASS 2

Meridian Engineering Company $160.00 $20,800.00 Kirkland Construction LLLP $275.00 $35,750.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $19,500.00 Engineer's Estimate 130 CUYD $120.00 $15,600.00

A0033 25101-2300 PLACED RIPRAP, METHOD B, CLASS 3

Meridian Engineering Company $160.00 $56,000.00 Kirkland Construction LLLP $275.00 $96,250.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $52,500.00 Engineer's Estimate 350 CUYD $110.00 $38,500.00

A0034 25101-2400 PLACED RIPRAP, METHOD B, CLASS 4

Meridian Engineering Company $160.00 $28,800.00 Kirkland Construction LLLP $275.00 $49,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $27,000.00 Engineer's Estimate 180 CUYD $140.00 $25,200.00

A0035 30202-2000 ROADWAY AGGREGATE, METHOD 2

Meridian Engineering Company $65.00 $299,000.00 Kirkland Construction LLLP $50.00 $230,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $70.00 $322,000.00 Engineer's Estimate 4,600 TON $70.00 $322,000.00

A0036 30302-1000 DITCH RECONDITIONING

Meridian Engineering Company $5.00 $2,250.00 Kirkland Construction LLLP $25.00 $11,250.00 Stormwater Plans, LLC dba SWP Contracting and Paving $11.50 $5,175.00 Engineer's Estimate 450 LNFT $7.00 $3,150.00

9 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0037 31002-1000 COLD IN-PLACE RECYCLED ASPHALT BASE COURSE, TYPE A

Meridian Engineering Company $6.70 $495,800.00 Kirkland Construction LLLP $5.00 $370,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $8.75 $647,500.00 Engineer's Estimate 74,000 SQYD $9.00 $666,000.00

A0038 31010-0000 EMULSIFIED ASPHALT (CSS ENGINEERING EMULSION OR PASS R EMULSION)

Meridian Engineering Company $850.00 $250,750.00 Kirkland Construction LLLP $530.00 $156,350.00 Stormwater Plans, LLC dba SWP Contracting and Paving $950.00 $280,250.00 Engineer's Estimate 295 TON $1,300.00 $383,500.00

A0039 40101-1000 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3

MILLION ESAL

Meridian Engineering Company $155.00 $1,519,000.00 Kirkland Construction LLLP $150.00 $1,470,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $123.00 $1,205,400.00 Engineer's Estimate 9,800 TON $100.00 $980,000.00

A0041 40105-3000 ANTISTRIP ADDITIVE, TYPE 3

Meridian Engineering Company $345.00 $33,120.00 Kirkland Construction LLLP $200.00 $19,200.00 Stormwater Plans, LLC dba SWP Contracting and Paving $263.00 $25,248.00 Engineer's Estimate 96 TON $200.00 $19,200.00

A0043 40601-0000 FOG SEAL

Meridian Engineering Company $800.00 $28,000.00 Kirkland Construction LLLP $900.00 $31,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $935.00 $32,725.00 Engineer's Estimate 35 TON $600.00 $21,000.00

A0044 41101-1000 PRIME COAT, METHOD 1

Meridian Engineering Company $5,000.00 $55,000.00 Kirkland Construction LLLP $975.00 $10,725.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,750.00 $19,250.00 Engineer's Estimate 11 TON $715.00 $7,865.00

10 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0045 41201-0000 TACK COAT

Meridian Engineering Company $1,100.00 $39,600.00 Kirkland Construction LLLP $1,200.00 $43,200.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,150.00 $41,400.00 Engineer's Estimate 36 TON $650.00 $23,400.00

A0046 41301-0000 ASPHALT PAVEMENT MILLING

Meridian Engineering Company $4.00 $40,000.00 Kirkland Construction LLLP $5.00 $50,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $16.00 $160,000.00 Engineer's Estimate 10,000 SQYD $2.00 $20,000.00

A0047 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)

Meridian Engineering Company $950.00 $257,450.00 Kirkland Construction LLLP $1,500.00 $406,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,750.00 $474,250.00 Engineer's Estimate 271 CUYD $1,500.00 $406,500.00

A0048 55220-0000 REPAIR CONCRETE

Meridian Engineering Company $1,500.00 $22,500.00 Kirkland Construction LLLP $2,000.00 $30,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,750.00 $26,250.00 Engineer's Estimate 15 SQYD $1,700.00 $25,500.00

A0049 55235-0000 EXPANSION JOINTS

Meridian Engineering Company $120.00 $3,240.00 Kirkland Construction LLLP $521.00 $14,067.00 Stormwater Plans, LLC dba SWP Contracting and Paving $290.00 $7,830.00 Engineer's Estimate 27 LNFT $200.00 $5,400.00

A0050 55240-0000 GROUT

Meridian Engineering Company $400.00 $22,000.00 Kirkland Construction LLLP $580.00 $31,900.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $8,250.00 Engineer's Estimate 55 CUFT $130.00 $7,150.00

11 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0051 55401-1000 REINFORCING STEEL

Meridian Engineering Company $2.50 $38,500.00 Kirkland Construction LLLP $3.00 $46,200.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1.75 $26,950.00 Engineer's Estimate 15,400 LB $2.50 $38,500.00

A0052 55401-2000 REINFORCING STEEL, EPOXY COATED

Meridian Engineering Company $7.00 $11,900.00 Kirkland Construction LLLP $3.50 $5,950.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2.15 $3,655.00 Engineer's Estimate 1,700 LB $4.25 $7,225.00

A0053 55601-1100 BRIDGE RAILING, STEEL, TWO RAIL

Meridian Engineering Company $500.00 $415,000.00 Kirkland Construction LLLP $320.00 $265,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $325.00 $269,750.00 Engineer's Estimate 830 LNFT $240.00 $199,200.00

A0054 55901-0000 MEMBRANE WATERPROOFING

Meridian Engineering Company $125.00 $22,000.00 Kirkland Construction LLLP $76.00 $13,376.00 Stormwater Plans, LLC dba SWP Contracting and Paving $52.00 $9,152.00 Engineer's Estimate 176 SQYD $90.00 $15,840.00

A0055 57501-0000 MINOR BRIDGE WORK

Meridian Engineering Company Lump Sum $5,000.00 Kirkland Construction LLLP Lump Sum $30,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $100,000.00 Engineer's Estimate ALL LPSM Lump Sum $25,000.00

A0056 60103-0000 CONCRETE, HEADWALL (FOR DOUBLE 8'X3' CBC)

Meridian Engineering Company $15,000.00 $30,000.00 Kirkland Construction LLLP $25,000.00 $50,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $32,000.00 $64,000.00 Engineer's Estimate 2 EACH $18,000.00 $36,000.00

12 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0057 60103-0000 CONCRETE, HEADWALL (FOR 8'x4' CBC)

Meridian Engineering Company $15,000.00 $30,000.00 Kirkland Construction LLLP $20,000.00 $40,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $32,000.00 $64,000.00 Engineer's Estimate 2 EACH $15,000.00 $30,000.00

A0058 60201-0800 24-INCH PIPE CULVERT (DUAL WALL HDPE)

Meridian Engineering Company $160.00 $129,600.00 Kirkland Construction LLLP $200.00 $162,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $205.00 $166,050.00 Engineer's Estimate 810 LNFT $130.00 $105,300.00

A0059 60201-1000 36-INCH PIPE CULVERT (DUAL WALL HDPE)

Meridian Engineering Company $200.00 $47,000.00 Kirkland Construction LLLP $250.00 $58,750.00 Stormwater Plans, LLC dba SWP Contracting and Paving $263.00 $61,805.00 Engineer's Estimate 235 LNFT $300.00 $70,500.00

A0060 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT (METAL)

Meridian Engineering Company $1,300.00 $59,800.00 Kirkland Construction LLLP $4,000.00 $184,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $875.00 $40,250.00 Engineer's Estimate 46 EACH $550.00 $25,300.00

A0061 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT (METAL)

Meridian Engineering Company $1,900.00 $15,200.00 Kirkland Construction LLLP $4,500.00 $36,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,300.00 $10,400.00 Engineer's Estimate 8 EACH $800.00 $6,400.00

A0062 60220-0000 PRECAST REINFORCED CONCRETE BOX CULVERT

Meridian Engineering Company $2,000.00 $1,122,000.00 Kirkland Construction LLLP $2,500.00 $1,402,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2,350.00 $1,318,350.00 Engineer's Estimate 561 LNFT $2,500.00 $1,402,500.00

13 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0063 60220-1750 8 FEET SPAN, 3 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT

Meridian Engineering Company $1,100.00 $187,000.00 Kirkland Construction LLLP $1,425.00 $242,250.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2,550.00 $433,500.00 Engineer's Estimate 170 LNFT $750.00 $127,500.00

A0064 60220-1800 8 FEET SPAN, 4 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT

Meridian Engineering Company $1,300.00 $65,000.00 Kirkland Construction LLLP $1,550.00 $77,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $3,200.00 $160,000.00 Engineer's Estimate 50 LNFT $950.00 $47,500.00

A0065 60707-0500 LINING 24-INCH PIPE CULVERT

Meridian Engineering Company $50.00 $30,000.00 Kirkland Construction LLLP $410.00 $246,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $245.00 $147,000.00 Engineer's Estimate 600 LNFT $150.00 $90,000.00

A0066 60901-1000 CURB, CONCRETE, 12-INCH DEPTH

Meridian Engineering Company $18.00 $41,220.00 Kirkland Construction LLLP $75.00 $171,750.00 Stormwater Plans, LLC dba SWP Contracting and Paving $46.00 $105,340.00 Engineer's Estimate 2,290 LNFT $35.00 $80,150.00

A0067 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS

Meridian Engineering Company $75.00 $26,250.00 Kirkland Construction LLLP $58.00 $20,300.00 Stormwater Plans, LLC dba SWP Contracting and Paving $58.00 $20,300.00 Engineer's Estimate 350 LNFT $40.00 $14,000.00

A0068 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT

Meridian Engineering Company $6,500.00 $104,000.00 Kirkland Construction LLLP $7,000.00 $112,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $7,000.00 $112,000.00 Engineer's Estimate 16 EACH $4,000.00 $64,000.00

14 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0069 61707-4000 STRUCTURE TRANSITION RAILING, MGS SYSTEM

Meridian Engineering Company $140.00 $84,000.00 Kirkland Construction LLLP $180.00 $108,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $182.00 $109,200.00 Engineer's Estimate 600 LNFT $150.00 $90,000.00

A0070 62030-0000 REPOINT STONE MASONRY

Meridian Engineering Company $200.00 $6,000.00 Kirkland Construction LLLP $580.00 $17,400.00 Stormwater Plans, LLC dba SWP Contracting and Paving $580.00 $17,400.00 Engineer's Estimate 30 LNFT $500.00 $15,000.00

A0071 62036-0000 JOINT SEALANT

Meridian Engineering Company $135.00 $16,200.00 Kirkland Construction LLLP $120.00 $14,400.00 Stormwater Plans, LLC dba SWP Contracting and Paving $46.00 $5,520.00 Engineer's Estimate 120 LNFT $25.00 $3,000.00

A0072 62201-0050 DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY

Meridian Engineering Company $120.00 $4,800.00 Kirkland Construction LLLP $132.00 $5,280.00 Stormwater Plans, LLC dba SWP Contracting and Paving $145.00 $5,800.00 Engineer's Estimate 40 HOUR $115.00 $4,600.00

A0073 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH

Meridian Engineering Company $80.00 $3,200.00 Kirkland Construction LLLP $100.00 $4,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $6,000.00 Engineer's Estimate 40 HOUR $135.00 $5,400.00

A0074 62301-0000 GENERAL LABOR

Meridian Engineering Company $34.00 $3,400.00 Kirkland Construction LLLP $100.00 $10,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $60.00 $6,000.00 Engineer's Estimate 100 HOUR $50.00 $5,000.00

15 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0075 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES

Meridian Engineering Company $170.00 $6,800.00 Kirkland Construction LLLP $175.00 $7,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $285.00 $11,400.00 Engineer's Estimate 40 HOUR $150.00 $6,000.00

A0076 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES

Meridian Engineering Company $175.00 $7,000.00 Kirkland Construction LLLP $235.00 $9,400.00 Stormwater Plans, LLC dba SWP Contracting and Paving $175.00 $7,000.00 Engineer's Estimate 40 HOUR $200.00 $8,000.00

A0077 62511-2000 SEEDING, HYDRAULIC METHOD

Meridian Engineering Company $0.25 $2,500.00 Kirkland Construction LLLP $0.10 $1,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $0.20 $2,000.00 Engineer's Estimate 10,000 SQYD $1.50 $15,000.00

A0078 62516-3000 MULCHING, HYDRAULIC METHOD, BONDED FIBER MATRIX

Meridian Engineering Company $0.50 $5,000.00 Kirkland Construction LLLP $0.45 $4,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $0.40 $4,000.00 Engineer's Estimate 10,000 SQYD $1.50 $15,000.00

A0079 62901-0000 ROLLED EROSION CONTROL PRODUCT

Meridian Engineering Company $8.00 $43,200.00 Kirkland Construction LLLP $3.80 $20,520.00 Stormwater Plans, LLC dba SWP Contracting and Paving $6.40 $34,560.00 Engineer's Estimate 5,400 SQYD $5.50 $29,700.00

A0080 63301-0000 SIGN SYSTEM

Meridian Engineering Company $450.00 $7,200.00 Kirkland Construction LLLP $405.00 $6,480.00 Stormwater Plans, LLC dba SWP Contracting and Paving $500.00 $8,000.00 Engineer's Estimate 16 EACH $390.00 $6,240.00

16 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0081 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID

Meridian Engineering Company $0.12 $18,276.00 Kirkland Construction LLLP $0.10 $15,230.00 Stormwater Plans, LLC dba SWP Contracting and Paving $0.15 $22,845.00 Engineer's Estimate 152,300 LNFT $0.20 $30,460.00

A0082 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN

Meridian Engineering Company $0.06 $2,178.00 Kirkland Construction LLLP $0.05 $1,815.00 Stormwater Plans, LLC dba SWP Contracting and Paving $0.07 $2,541.00 Engineer's Estimate 36,300 LNFT $0.18 $6,534.00

A0083 63405-0050 PAVEMENT MARKINGS, SYMBOLS

Meridian Engineering Company $100.00 $500.00 Kirkland Construction LLLP $58.00 $290.00 Stormwater Plans, LLC dba SWP Contracting and Paving $85.00 $425.00 Engineer's Estimate 5 EACH $150.00 $750.00

A0084 63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR

Meridian Engineering Company Lump Sum $50,000.00 Kirkland Construction LLLP Lump Sum $175,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $638,000.00 Engineer's Estimate ALL LPSM Lump Sum $60,000.00

A0085 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

Meridian Engineering Company $500.00 $2,000.00 Kirkland Construction LLLP $85.00 $340.00 Stormwater Plans, LLC dba SWP Contracting and Paving $575.00 $2,300.00 Engineer's Estimate 4 EACH $400.00 $1,600.00

A0086 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE

Meridian Engineering Company $75.00 $16,500.00 Kirkland Construction LLLP $20.00 $4,400.00 Stormwater Plans, LLC dba SWP Contracting and Paving $23.00 $5,060.00 Engineer's Estimate 220 EACH $20.00 $4,400.00

17 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0087 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

Meridian Engineering Company $15,000.00 $30,000.00 Kirkland Construction LLLP $10,000.00 $20,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $4,200.00 $8,400.00 Engineer's Estimate 2 EACH $12,000.00 $24,000.00

A0088 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS

Meridian Engineering Company $0.15 $15,450.00 Kirkland Construction LLLP $0.13 $13,390.00 Stormwater Plans, LLC dba SWP Contracting and Paving $0.20 $20,600.00 Engineer's Estimate 103,000 LNFT $0.17 $17,510.00

A0089 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE

Meridian Engineering Company $3.50 $7,000.00 Kirkland Construction LLLP $5.00 $10,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $5.00 $10,000.00 Engineer's Estimate 2,000 LNFT $2.00 $4,000.00

A0090 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

Meridian Engineering Company $35.00 $10,150.00 Kirkland Construction LLLP $22.00 $6,380.00 Stormwater Plans, LLC dba SWP Contracting and Paving $12.00 $3,480.00 Engineer's Estimate 290 SQFT $20.00 $5,800.00

A0091 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

Meridian Engineering Company $38.00 $45,600.00 Kirkland Construction LLLP $58.00 $69,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $60.00 $72,000.00 Engineer's Estimate 1,200 HOUR $50.00 $60,000.00

A0092 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR

Meridian Engineering Company $48.00 $9,600.00 Kirkland Construction LLLP $70.00 $14,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $80.00 $16,000.00 Engineer's Estimate 200 HOUR $85.00 $17,000.00

18 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

Total Schedule - All Items

Meridian Engineering Company $9,531,034.00 Kirkland Construction LLLP $10,385,781.00 Stormwater Plans, LLC dba SWP Contracting and Paving $13,568,737.00 Engineer's Estimate $7,920,593.00

19 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Schedule: X

Schedule Type: Options

Solcitation No: 6982AF20B000003

Division: Central Federal Lands

State: AZ County: Apache, Navajo

Federal Land: Petrified Forest National Park Opened at: Lakewood, CO

Opened by: Leslie Karsten

Date: 11/21/19

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Meridian Engineering Company $4,445,660.00 3855 N. Business Center Drive Tucson, AZ 85705

Kirkland Construction LLLP $5,171,632.50 2101 Main St Rye, CO 81069

Stormwater Plans, LLC dba SWP Contracting and Paving $6,180,286.00 5624 N. 54th Avenue

Engineer's Estimate $4,734,254.00

20 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X1000 15101-0000 MOBILIZATION

Meridian Engineering Company Lump Sum $125,000.00 Kirkland Construction LLLP Lump Sum $36,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $610,000.00 Engineer's Estimate ALL LPSM Lump Sum $488,000.00

X1001 15210-3000 CENTERLINE, VERIFICATION AND STAKING

Meridian Engineering Company $4,000.00 $22,600.00 Kirkland Construction LLLP $2,500.00 $14,125.00 Stormwater Plans, LLC dba SWP Contracting and Paving $4,200.00 $23,730.00 Engineer's Estimate 5.65 MILE $3,600.00 $20,340.00

X1002 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE

Meridian Engineering Company $700.00 $11,900.00 Kirkland Construction LLLP $950.00 $16,150.00 Stormwater Plans, LLC dba SWP Contracting and Paving $525.00 $8,925.00 Engineer's Estimate 17 EACH $1,000.00 $17,000.00

X1003 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES

Meridian Engineering Company $8,000.00 $1,200.00 Kirkland Construction LLLP $9,500.00 $1,425.00 Stormwater Plans, LLC dba SWP Contracting and Paving $24,500.00 $3,675.00 Engineer's Estimate 0.15 MILE $10,000.00 $1,500.00

X1004 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL

Meridian Engineering Company $8,000.00 $1,200.00 Kirkland Construction LLLP $9,500.00 $1,425.00 Stormwater Plans, LLC dba SWP Contracting and Paving $14,000.00 $2,100.00 Engineer's Estimate 0.15 MILE $8,000.00 $1,200.00

X1005 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE

Meridian Engineering Company Lump Sum $14,000.00 Kirkland Construction LLLP Lump Sum $18,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $100,000.00 Engineer's Estimate ALL LPSM Lump Sum $102,000.00

21 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X1006 15401-0000 CONTRACTOR TESTING

Meridian Engineering Company Lump Sum $100,000.00 Kirkland Construction LLLP Lump Sum $47,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $81,000.00

X1007 15501-0000 CONSTRUCTION SCHEDULE

Meridian Engineering Company Lump Sum $1,500.00 Kirkland Construction LLLP Lump Sum $1,200.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $15,000.00 Engineer's Estimate ALL LPSM Lump Sum $8,000.00

X1008 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

Meridian Engineering Company $4.25 $5,950.00 Kirkland Construction LLLP $3.00 $4,200.00 Stormwater Plans, LLC dba SWP Contracting and Paving $3.50 $4,900.00 Engineer's Estimate 1,400 LNFT $4.00 $5,600.00

X1009 15802-0000 WATERING FOR DUST CONTROL

Meridian Engineering Company Lump Sum $15,000.00 Kirkland Construction LLLP Lump Sum $40,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $100,000.00 Engineer's Estimate ALL LPSM Lump Sum $2,000.00

X1010 20101-0000 CLEARING AND GRUBBING

Meridian Engineering Company $4,000.00 $2,000.00 Kirkland Construction LLLP $40,000.00 $20,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $8,200.00 $4,100.00 Engineer's Estimate 0.5 ACRE $6,000.00 $3,000.00

X1011 20301-1900 REMOVAL OF PIPE CULVERT

Meridian Engineering Company $1,500.00 $45,000.00 Kirkland Construction LLLP $4,200.00 $126,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,875.00 $56,250.00 Engineer's Estimate 30 EACH $1,500.00 $45,000.00

22 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X1012 20301-2400 REMOVAL OF SIGN

Meridian Engineering Company $250.00 $4,250.00 Kirkland Construction LLLP $120.00 $2,040.00 Stormwater Plans, LLC dba SWP Contracting and Paving $140.00 $2,380.00 Engineer's Estimate 17 EACH $120.00 $2,040.00

X1013 20302-0200 REMOVAL OF CURB

Meridian Engineering Company $5.00 $7,650.00 Kirkland Construction LLLP $15.00 $22,950.00 Stormwater Plans, LLC dba SWP Contracting and Paving $13.00 $19,890.00 Engineer's Estimate 1,530 LNFT $8.00 $12,240.00

X1014 20315-0000 SAWCUTTING PAVEMENT

Meridian Engineering Company $1.00 $6,100.00 Kirkland Construction LLLP $11.00 $67,100.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2.30 $14,030.00 Engineer's Estimate 6,100 LNFT $2.10 $12,810.00

X1015 20401-0000 ROADWAY EXCAVATION

Meridian Engineering Company $30.00 $27,000.00 Kirkland Construction LLLP $53.00 $47,700.00 Stormwater Plans, LLC dba SWP Contracting and Paving $53.00 $47,700.00 Engineer's Estimate 900 CUYD $25.00 $22,500.00

X1016 20402-0000 SUBEXCAVATION

Meridian Engineering Company $160.00 $720,000.00 Kirkland Construction LLLP $81.00 $364,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $122.00 $549,000.00 Engineer's Estimate 4,500 CUYD $60.00 $270,000.00

X1017 20441-0000 WASTE

Meridian Engineering Company $23.00 $115,000.00 Kirkland Construction LLLP $40.00 $200,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $21.00 $105,000.00 Engineer's Estimate 5,000 CUYD $15.00 $75,000.00

23 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X1018 25101-2200 PLACED RIPRAP, METHOD B, CLASS 2

Meridian Engineering Company $150.00 $42,000.00 Kirkland Construction LLLP $266.00 $74,480.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $42,000.00 Engineer's Estimate 280 CUYD $120.00 $33,600.00

X1019 25101-2300 PLACED RIPRAP, METHOD B, CLASS 3

Meridian Engineering Company $150.00 $10,500.00 Kirkland Construction LLLP $266.00 $18,620.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $10,500.00 Engineer's Estimate 70 CUYD $110.00 $7,700.00

X1020 30202-2000 ROADWAY AGGREGATE, METHOD 2

Meridian Engineering Company $60.00 $90,000.00 Kirkland Construction LLLP $48.00 $72,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $70.00 $105,000.00 Engineer's Estimate 1,500 TON $70.00 $105,000.00

X1021 30302-1000 DITCH RECONDITIONING

Meridian Engineering Company $2.50 $9,500.00 Kirkland Construction LLLP $21.00 $79,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $11.00 $41,800.00 Engineer's Estimate 3,800 LNFT $7.00 $26,600.00

X1022 31002-1000 COLD IN-PLACE RECYCLED ASPHALT BASE COURSE, TYPE A

Meridian Engineering Company $6.00 $522,000.00 Kirkland Construction LLLP $4.50 $391,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $7.00 $609,000.00 Engineer's Estimate 87,000 SQYD $9.00 $783,000.00

X1023 31010-0000 EMULSIFIED ASPHALT (CSS ENGINEERING EMULSION OR PASS R EMULSION)

Meridian Engineering Company $800.00 $269,600.00 Kirkland Construction LLLP $530.00 $178,610.00 Stormwater Plans, LLC dba SWP Contracting and Paving $875.00 $294,875.00 Engineer's Estimate 337 TON $1,300.00 $438,100.00

24 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X1025 40101-1000 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3

MILLION ESAL

Meridian Engineering Company $135.00 $1,417,500.00 Kirkland Construction LLLP $120.00 $1,260,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $117.00 $1,228,500.00 Engineer's Estimate 10,500 TON $100.00 $1,050,000.00

X1026 40105-3000 ANTISTRIP ADDITIVE, TYPE 3

Meridian Engineering Company $340.00 $35,700.00 Kirkland Construction LLLP $200.00 $21,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $263.00 $27,615.00 Engineer's Estimate 105 TON $200.00 $21,000.00

X1028 40601-0000 FOG SEAL

Meridian Engineering Company $750.00 $29,250.00 Kirkland Construction LLLP $900.00 $35,100.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,075.00 $41,925.00 Engineer's Estimate 39 TON $600.00 $23,400.00

X1029 41101-1000 PRIME COAT, METHOD 1

Meridian Engineering Company $5,000.00 $25,000.00 Kirkland Construction LLLP $975.00 $4,875.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,700.00 $8,500.00 Engineer's Estimate 5 TON $715.00 $3,575.00

X1030 41201-0000 TACK COAT

Meridian Engineering Company $1,000.00 $40,000.00 Kirkland Construction LLLP $900.00 $36,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,150.00 $46,000.00 Engineer's Estimate 40 TON $650.00 $26,000.00

X1031 41301-0000 ASPHALT PAVEMENT MILLING

Meridian Engineering Company $3.50 $27,300.00 Kirkland Construction LLLP $4.50 $35,100.00 Stormwater Plans, LLC dba SWP Contracting and Paving $14.00 $109,200.00 Engineer's Estimate 7,800 SQYD $2.00 $15,600.00

25 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X1032 50101-0600 MINOR CONCRETE PAVEMENT, REINFORCED, 6-INCH DEPTH

Meridian Engineering Company $165.00 $20,625.00 Kirkland Construction LLLP $100.00 $12,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $145.00 $18,125.00 Engineer's Estimate 125 SQYD $110.00 $13,750.00

X1033 60103-0180 CONCRETE, HEADWALL FOR 36-INCH PIPE CULVERT

Meridian Engineering Company $15,000.00 $15,000.00 Kirkland Construction LLLP $5,000.00 $5,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $9,000.00 $9,000.00 Engineer's Estimate 1 EACH $5,000.00 $5,000.00

X1034 60201-0800 24-INCH PIPE CULVERT (DUAL WALL HDPE)

Meridian Engineering Company $155.00 $139,500.00 Kirkland Construction LLLP $200.00 $180,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $200.00 $180,000.00 Engineer's Estimate 900 LNFT $130.00 $117,000.00

X1035 60201-1000 36-INCH PIPE CULVERT (DUAL WALL HDPE)

Meridian Engineering Company $200.00 $16,400.00 Kirkland Construction LLLP $250.00 $20,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $255.00 $20,910.00 Engineer's Estimate 82 LNFT $300.00 $24,600.00

X1036 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT (METAL)

Meridian Engineering Company $1,200.00 $108,000.00 Kirkland Construction LLLP $2,000.00 $180,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $875.00 $78,750.00 Engineer's Estimate 90 EACH $550.00 $49,500.00

X1037 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT (METAL)

Meridian Engineering Company $1,800.00 $16,200.00 Kirkland Construction LLLP $2,500.00 $22,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,300.00 $11,700.00 Engineer's Estimate 9 EACH $800.00 $7,200.00

26 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X1038 60707-0500 LINING 24-INCH PIPE CULVERT

Meridian Engineering Company $40.00 $72,000.00 Kirkland Construction LLLP $375.00 $675,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $400.00 $720,000.00 Engineer's Estimate 1,800 LNFT $150.00 $270,000.00

X1039 60707-0700 LINING 36-INCH PIPE CULVERT

Meridian Engineering Company $45.00 $10,800.00 Kirkland Construction LLLP $470.00 $112,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $525.00 $126,000.00 Engineer's Estimate 240 LNFT $200.00 $48,000.00

X1040 60901-1000 CURB, CONCRETE, 12-INCH DEPTH

Meridian Engineering Company $18.00 $126,000.00 Kirkland Construction LLLP $75.00 $525,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $32.00 $224,000.00 Engineer's Estimate 7,000 LNFT $35.00 $245,000.00

X1041 61501-0200 SIDEWALK, COLORED CONCRETE

Meridian Engineering Company $125.00 $21,250.00 Kirkland Construction LLLP $100.00 $17,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $62.00 $10,540.00 Engineer's Estimate 170 SQYD $100.00 $17,000.00

X1042 62511-2000 SEEDING, HYDRAULIC METHOD

Meridian Engineering Company $0.22 $2,365.00 Kirkland Construction LLLP $0.10 $1,075.00 Stormwater Plans, LLC dba SWP Contracting and Paving $0.20 $2,150.00 Engineer's Estimate 10,750 SQYD $1.50 $16,125.00

X1043 62516-3000 MULCHING, HYDRAULIC METHOD, BONDED FIBER MATRIX

Meridian Engineering Company $0.48 $5,160.00 Kirkland Construction LLLP $0.45 $4,837.50 Stormwater Plans, LLC dba SWP Contracting and Paving $0.40 $4,300.00 Engineer's Estimate 10,750 SQYD $1.50 $16,125.00

27 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X1044 62901-0000 ROLLED EROSION CONTROL PRODUCT

Meridian Engineering Company $7.50 $18,750.00 Kirkland Construction LLLP $3.80 $9,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $6.30 $15,750.00 Engineer's Estimate 2,500 SQYD $5.50 $13,750.00

X1045 63301-0000 SIGN SYSTEM

Meridian Engineering Company $450.00 $9,000.00 Kirkland Construction LLLP $405.00 $8,100.00 Stormwater Plans, LLC dba SWP Contracting and Paving $500.00 $10,000.00 Engineer's Estimate 20 EACH $390.00 $7,800.00

X1046 63316-1000 REMOVE AND RESET SIGN

Meridian Engineering Company $400.00 $400.00 Kirkland Construction LLLP $520.00 $520.00 Stormwater Plans, LLC dba SWP Contracting and Paving $645.00 $645.00 Engineer's Estimate 1 EACH $215.00 $215.00

X1047 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID

Meridian Engineering Company $0.12 $21,672.00 Kirkland Construction LLLP $0.10 $18,060.00 Stormwater Plans, LLC dba SWP Contracting and Paving $0.15 $27,090.00 Engineer's Estimate 180,600 LNFT $0.20 $36,120.00

X1048 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN

Meridian Engineering Company $0.06 $1,788.00 Kirkland Construction LLLP $0.05 $1,490.00 Stormwater Plans, LLC dba SWP Contracting and Paving $0.07 $2,086.00 Engineer's Estimate 29,800 LNFT $0.18 $5,364.00

X1049 63405-0050 PAVEMENT MARKINGS, SYMBOLS (TYPE B)

Meridian Engineering Company $60.00 $300.00 Kirkland Construction LLLP $58.00 $290.00 Stormwater Plans, LLC dba SWP Contracting and Paving $85.00 $425.00 Engineer's Estimate 5 EACH $150.00 $750.00

28 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X1050 63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR

Meridian Engineering Company Lump Sum $10,000.00 Kirkland Construction LLLP Lump Sum $22,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $170,000.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00

X1051 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE

Meridian Engineering Company $50.00 $11,000.00 Kirkland Construction LLLP $20.00 $4,400.00 Stormwater Plans, LLC dba SWP Contracting and Paving $23.00 $5,060.00 Engineer's Estimate 220 EACH $20.00 $4,400.00

X1052 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

Meridian Engineering Company $500.00 $1,000.00 Kirkland Construction LLLP $10,000.00 $20,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $4,200.00 $8,400.00 Engineer's Estimate 2 EACH $12,000.00 $24,000.00

X1053 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS

Meridian Engineering Company $0.15 $18,000.00 Kirkland Construction LLLP $0.13 $15,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $0.20 $24,000.00 Engineer's Estimate 120,000 LNFT $0.17 $20,400.00

X1054 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE

Meridian Engineering Company $3.50 $3,500.00 Kirkland Construction LLLP $5.00 $5,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $5.00 $5,000.00 Engineer's Estimate 1,000 LNFT $2.00 $2,000.00

X1055 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

Meridian Engineering Company $35.00 $8,050.00 Kirkland Construction LLLP $22.00 $5,060.00 Stormwater Plans, LLC dba SWP Contracting and Paving $12.00 $2,760.00 Engineer's Estimate 230 SQFT $20.00 $4,600.00

29 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Schedule: X

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

X1056 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

Meridian Engineering Company $38.00 $38,000.00 Kirkland Construction LLLP $58.00 $58,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $60.00 $60,000.00 Engineer's Estimate 1,000 HOUR $50.00 $50,000.00

X1057 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR

Meridian Engineering Company $48.00 $7,200.00 Kirkland Construction LLLP $70.00 $10,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $80.00 $12,000.00 Engineer's Estimate 150 HOUR $85.00 $12,750.00

Total Schedule - All Items

Meridian Engineering Company $4,445,660.00 Kirkland Construction LLLP $5,171,632.50 Stormwater Plans, LLC dba SWP Contracting and Paving $6,180,286.00 Engineer's Estimate $4,734,254.00

30 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Schedule: Y

Schedule Type: Options

Solcitation No: 6982AF20B000003

Division: Central Federal Lands

State: AZ County: Apache, Navajo

Federal Land: Petrified Forest National Park Opened at: Lakewood, CO

Opened by: Leslie Karsten

Date: 11/21/19

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Kirkland Construction LLLP $4,641,525.00 2101 Main St Rye, CO 81069

Meridian Engineering Company $5,911,636.00 3855 N. Business Center Drive Tucson, AZ 85705

Stormwater Plans, LLC dba SWP Contracting and Paving $6,384,310.00 5624 N. 54th Avenue

Engineer's Estimate $4,150,127.00

31 out of 39Source Selection Information - See FAR 2.101 & 3.104

Project No: AZ FTNP PEFO 10(7)

Project Name: Main Park Road

Schedule: Y

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

Y1000 15101-0000 MOBILIZATION

Kirkland Construction LLLP Lump Sum $36,000.00 Meridian Engineering Company Lump Sum $125,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $630,000.00 Engineer's Estimate ALL LPSM Lump Sum $428,000.00

Y1001 15210-3000 CENTERLINE, VERIFICATION AND STAKING

Kirkland Construction LLLP $2,500.00 $9,000.00 Meridian Engineering Company $5,000.00 $18,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $4,200.00 $15,120.00 Engineer's Estimate 3.60 MILE $3,600.00 $12,960.00

Y1002 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE

Kirkland Construction LLLP $950.00 $15,200.00 Meridian Engineering Company $800.00 $12,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $525.00 $8,400.00 Engineer's Estimate 16 EACH $1,000.00 $16,000.00

Y1003 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE

Kirkland Construction LLLP Lump Sum $18,000.00 Meridian Engineering Company Lump Sum $14,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $77,500.00 Engineer's Estimate ALL LPSM Lump Sum $87,000.00

Y1004 15401-0000 CONTRACTOR TESTING

Kirkland Construction LLLP Lump Sum $47,000.00 Meridian Engineering Company Lump Sum $85,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $176,000.00 Engineer's Estimate ALL LPSM Lump Sum $71,000.00

Y1005 15501-0000 CONSTRUCTION SCHEDULE

Kirkland Construction LLLP Lump Sum $1,200.00 Meridian Engineering Company Lump Sum $1,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $7,600.00 Engineer's Estimate ALL LPSM…

This is the start of the file's text. The full file is on GovTribe.