Bid Tabulation All Bidders.pdf
PDF 180 KB Posted
- Attached to
- AZ FTNP PEFO 10(7) Main Park Road Federal contract opportunity
- Solicitation number
- 6982AF20B000003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary - AZ FTNP PEFO 10(7) Main Park Road .pdf | ||
| SF30 A004.pdf | ||
| QnA 11.19.2019.pdf | ||
| SF30 A003.pdf | ||
| SF30 A003 11_14_2019.pdf | ||
| SF30 A002 11_13_2019.pdf | ||
| SF30_A001.pdf | ||
| QnA_10.30.19.pdf | ||
| PEFO_Traffic_Counts.pdf | ||
| AZ_FTNP_PEFO_10(7)_Bridges_Final_Geotechnical_Report_2019-09-06.pdf | ||
| 6982AF20B000003_AZ_FTNP_PEFO_10(7)_IFB.pdf | ||
| Final_Hydraulics_Memorandum_-_PEFO_-_09112019_signed10-9-19.pdf | ||
| AZ_PEFO_10-7_Plans_Final_signed.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 11/25/19
1 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Contractor Responsive?
Engineer's Estimate
Kirkland Construction LLLP
Meridian Engineering Company
Stormwater Plans, LLC dba SWP Contracting and Paving
Base Schedule A
$7,920,593.00
$10,385,781.00
$9,531,034.00
$13,568,737.00
Option: X
$4,734,254.00
$5,171,632.50
$4,445,660.00
$6,180,286.00
Option: Y
$4,150,127.00
$4,641,525.00
$5,911,636.00
$6,384,310.00
Contractor Responsive?
Engineer's Estimate
Kirkland Construction LLLP
Meridian Engineering Company
Stormwater Plans, LLC dba SWP Contracting and Paving
Total Base Schedule A and Option(s): X
$12,654,847.00
$15,557,413.50
$13,976,694.00
$19,749,023.00
Total Base Schedule A and Option(s): XY
$16,804,974.00
$20,198,938.50
$19,888,330.00
$26,133,333.00
Total Base Schedule A and Option(s): Y
$12,070,720.00
$15,027,306.00
$15,442,670.00
$19,953,047.00
2 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Schedule: A
Schedule Type: Base
Solcitation No: 6982AF20B000003
Division: Central Federal Lands
State: AZ County: Apache, Navajo
Federal Land: Petrified Forest National Park Opened at: Lakewood, CO
Opened by: Leslie Karsten
Date: 11/21/19
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Meridian Engineering Company $9,531,034.00 3855 N. Business Center Drive Tucson, AZ 85705
Kirkland Construction LLLP $10,385,781.00 2101 Main St Rye, CO 81069
Stormwater Plans, LLC dba SWP Contracting and Paving $13,568,737.00 5624 N. 54th Avenue Glendale, AZ 85301
Engineer's Estimate $7,920,593.00
3 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0001 15101-0000 MOBILIZATION
Meridian Engineering Company Lump Sum $1,453,000.00 Kirkland Construction LLLP Lump Sum $1,000,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $1,350,000.00 Engineer's Estimate ALL LPSM Lump Sum $816,000.00
A0002 15210-3000 CENTERLINE, VERIFICATION AND STAKING
Meridian Engineering Company $4,500.00 $21,780.00 Kirkland Construction LLLP $2,500.00 $12,100.00 Stormwater Plans, LLC dba SWP Contracting and Paving $4,100.00 $19,844.00 Engineer's Estimate 4.84 MILE $3,600.00 $17,424.00
A0003 15215-2000 SURVEY AND STAKING, BRIDGE
Meridian Engineering Company $6,500.00 $26,000.00 Kirkland Construction LLLP $8,000.00 $32,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $4,100.00 $16,400.00 Engineer's Estimate 4 EACH $8,000.00 $32,000.00
A0004 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
Meridian Engineering Company $800.00 $12,800.00 Kirkland Construction LLLP $1,000.00 $16,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $525.00 $8,400.00 Engineer's Estimate 16 EACH $1,000.00 $16,000.00
A0005 15215-5000 SURVEY AND STAKING, BOX CULVERT
Meridian Engineering Company $2,500.00 $5,000.00 Kirkland Construction LLLP $3,200.00 $6,400.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,750.00 $3,500.00 Engineer's Estimate 2 EACH $2,500.00 $5,000.00
A0006 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES
Meridian Engineering Company $8,000.00 $2,800.00 Kirkland Construction LLLP $10,000.00 $3,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $24,500.00 $8,575.00 Engineer's Estimate 0.35 MILE $10,000.00 $3,500.00
4 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0007 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL
Meridian Engineering Company $7,000.00 $2,450.00 Kirkland Construction LLLP $9,000.00 $3,150.00 Stormwater Plans, LLC dba SWP Contracting and Paving $14,000.00 $4,900.00 Engineer's Estimate 0.35 MILE $8,000.00 $2,800.00
A0008 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE
Meridian Engineering Company Lump Sum $65,000.00 Kirkland Construction LLLP Lump Sum $300,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $750,000.00 Engineer's Estimate ALL LPSM Lump Sum $170,000.00
A0009 15401-0000 CONTRACTOR TESTING
Meridian Engineering Company Lump Sum $170,000.00 Kirkland Construction LLLP Lump Sum $300,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $1,000,000.00 Engineer's Estimate ALL LPSM Lump Sum $136,000.00
A0010 15501-0000 CONSTRUCTION SCHEDULE
Meridian Engineering Company Lump Sum $5,000.00 Kirkland Construction LLLP Lump Sum $20,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $125,000.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00
A0011 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
Meridian Engineering Company $4.50 $18,000.00 Kirkland Construction LLLP $3.00 $12,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $3.50 $14,000.00 Engineer's Estimate 4,000 LNFT $4.00 $16,000.00
A0012 15802-0000 WATERING FOR DUST CONTROL
Meridian Engineering Company Lump Sum $80,000.00 Kirkland Construction LLLP Lump Sum $200,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $1,000,000.00 Engineer's Estimate ALL LPSM Lump Sum $7,500.00
5 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0013 20101-0000 CLEARING AND GRUBBING
Meridian Engineering Company $4,000.00 $8,000.00 Kirkland Construction LLLP $20,000.00 $40,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $6,100.00 $12,200.00 Engineer's Estimate 2.0 ACRE $6,000.00 $12,000.00
A0014 20301-1200 REMOVAL OF HEADWALL
Meridian Engineering Company $3,000.00 $3,000.00 Kirkland Construction LLLP $6,000.00 $6,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $3,850.00 $3,850.00 Engineer's Estimate 1 EACH $1,500.00 $1,500.00
A0015 20301-1400 REMOVAL OF INLET
Meridian Engineering Company $1,500.00 $9,000.00 Kirkland Construction LLLP $4,000.00 $24,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,275.00 $7,650.00 Engineer's Estimate 6 EACH $1,000.00 $6,000.00
A0016 20301-1900 REMOVAL OF PIPE CULVERT
Meridian Engineering Company $2,600.00 $85,800.00 Kirkland Construction LLLP $5,000.00 $165,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2,275.00 $75,075.00 Engineer's Estimate 33 EACH $1,500.00 $49,500.00
A0017 20301-2400 REMOVAL OF SIGN
Meridian Engineering Company $300.00 $4,800.00 Kirkland Construction LLLP $120.00 $1,920.00 Stormwater Plans, LLC dba SWP Contracting and Paving $140.00 $2,240.00 Engineer's Estimate 16 EACH $120.00 $1,920.00
A0018 20301-2700 REMOVAL OF STRUCTURE
Meridian Engineering Company $65,000.00 $195,000.00 Kirkland Construction LLLP $100,000.00 $300,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $125,000.00 $375,000.00 Engineer's Estimate 3 EACH $26,000.00 $78,000.00
6 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0019 20302-0150 REMOVAL OF BRIDGE RAILING
Meridian Engineering Company $10.00 $1,320.00 Kirkland Construction LLLP $24.00 $3,168.00 Stormwater Plans, LLC dba SWP Contracting and Paving $23.50 $3,102.00 Engineer's Estimate 132 LNFT $50.00 $6,600.00
A0020 20302-1200 REMOVAL OF GUARDRAIL
Meridian Engineering Company $7.50 $8,250.00 Kirkland Construction LLLP $6.00 $6,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $6.00 $6,600.00 Engineer's Estimate 1,100 LNFT $7.00 $7,700.00
A0021 20303-0000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Meridian Engineering Company $200.00 $7,000.00 Kirkland Construction LLLP $260.00 $9,100.00 Stormwater Plans, LLC dba SWP Contracting and Paving $180.00 $6,300.00 Engineer's Estimate 35 SQYD $35.00 $1,225.00
A0022 20303-0300 REMOVAL OF CONCRETE
Meridian Engineering Company $350.00 $19,250.00 Kirkland Construction LLLP $800.00 $44,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $250.00 $13,750.00 Engineer's Estimate 55 SQYD $70.00 $3,850.00
A0023 20315-0000 SAWCUTTING PAVEMENT
Meridian Engineering Company $1.00 $3,500.00 Kirkland Construction LLLP $13.00 $45,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2.30 $8,050.00 Engineer's Estimate 3,500 LNFT $2.10 $7,350.00
A0024 20401-0000 ROADWAY EXCAVATION
Meridian Engineering Company $35.00 $21,000.00 Kirkland Construction LLLP $53.00 $31,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $60.00 $36,000.00 Engineer's Estimate 600 CUYD $25.00 $15,000.00
7 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0025 20402-0000 SUBEXCAVATION
Meridian Engineering Company $170.00 $1,020,000.00 Kirkland Construction LLLP $85.00 $510,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $122.00 $732,000.00 Engineer's Estimate 6,000 CUYD $60.00 $360,000.00
A0026 20421-0000 ROCK EXCAVATION
Meridian Engineering Company $150.00 $9,000.00 Kirkland Construction LLLP $275.00 $16,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $9,000.00 Engineer's Estimate 60 CUYD $220.00 $13,200.00
A0027 20441-0000 WASTE
Meridian Engineering Company $25.00 $150,000.00 Kirkland Construction LLLP $45.00 $270,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $23.00 $138,000.00 Engineer's Estimate 6,000 CUYD $15.00 $90,000.00
A0028 20801-0000 STRUCTURE EXCAVATION
Meridian Engineering Company $23.00 $62,100.00 Kirkland Construction LLLP $42.00 $113,400.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1.20 $3,240.00 Engineer's Estimate 2,700 CUYD $45.00 $121,500.00
A0029 20802-0000 FOUNDATION FILL
Meridian Engineering Company $130.00 $35,100.00 Kirkland Construction LLLP $120.00 $32,400.00 Stormwater Plans, LLC dba SWP Contracting and Paving $110.00 $29,700.00 Engineer's Estimate 270 CUYD $70.00 $18,900.00
A0030 20803-0000 STRUCTURAL BACKFILL
Meridian Engineering Company $125.00 $73,750.00 Kirkland Construction LLLP $155.00 $91,450.00 Stormwater Plans, LLC dba SWP Contracting and Paving $120.00 $70,800.00 Engineer's Estimate 590 CUYD $75.00 $44,250.00
8 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0031 20810-0000 SHORING AND BRACING
Meridian Engineering Company Lump Sum $4,000.00 Kirkland Construction LLLP Lump Sum $11,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $250,000.00 Engineer's Estimate ALL LPSM Lump Sum $50,000.00
A0032 25101-2200 PLACED RIPRAP, METHOD B, CLASS 2
Meridian Engineering Company $160.00 $20,800.00 Kirkland Construction LLLP $275.00 $35,750.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $19,500.00 Engineer's Estimate 130 CUYD $120.00 $15,600.00
A0033 25101-2300 PLACED RIPRAP, METHOD B, CLASS 3
Meridian Engineering Company $160.00 $56,000.00 Kirkland Construction LLLP $275.00 $96,250.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $52,500.00 Engineer's Estimate 350 CUYD $110.00 $38,500.00
A0034 25101-2400 PLACED RIPRAP, METHOD B, CLASS 4
Meridian Engineering Company $160.00 $28,800.00 Kirkland Construction LLLP $275.00 $49,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $27,000.00 Engineer's Estimate 180 CUYD $140.00 $25,200.00
A0035 30202-2000 ROADWAY AGGREGATE, METHOD 2
Meridian Engineering Company $65.00 $299,000.00 Kirkland Construction LLLP $50.00 $230,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $70.00 $322,000.00 Engineer's Estimate 4,600 TON $70.00 $322,000.00
A0036 30302-1000 DITCH RECONDITIONING
Meridian Engineering Company $5.00 $2,250.00 Kirkland Construction LLLP $25.00 $11,250.00 Stormwater Plans, LLC dba SWP Contracting and Paving $11.50 $5,175.00 Engineer's Estimate 450 LNFT $7.00 $3,150.00
9 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0037 31002-1000 COLD IN-PLACE RECYCLED ASPHALT BASE COURSE, TYPE A
Meridian Engineering Company $6.70 $495,800.00 Kirkland Construction LLLP $5.00 $370,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $8.75 $647,500.00 Engineer's Estimate 74,000 SQYD $9.00 $666,000.00
A0038 31010-0000 EMULSIFIED ASPHALT (CSS ENGINEERING EMULSION OR PASS R EMULSION)
Meridian Engineering Company $850.00 $250,750.00 Kirkland Construction LLLP $530.00 $156,350.00 Stormwater Plans, LLC dba SWP Contracting and Paving $950.00 $280,250.00 Engineer's Estimate 295 TON $1,300.00 $383,500.00
A0039 40101-1000 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3
MILLION ESAL
Meridian Engineering Company $155.00 $1,519,000.00 Kirkland Construction LLLP $150.00 $1,470,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $123.00 $1,205,400.00 Engineer's Estimate 9,800 TON $100.00 $980,000.00
A0041 40105-3000 ANTISTRIP ADDITIVE, TYPE 3
Meridian Engineering Company $345.00 $33,120.00 Kirkland Construction LLLP $200.00 $19,200.00 Stormwater Plans, LLC dba SWP Contracting and Paving $263.00 $25,248.00 Engineer's Estimate 96 TON $200.00 $19,200.00
A0043 40601-0000 FOG SEAL
Meridian Engineering Company $800.00 $28,000.00 Kirkland Construction LLLP $900.00 $31,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $935.00 $32,725.00 Engineer's Estimate 35 TON $600.00 $21,000.00
A0044 41101-1000 PRIME COAT, METHOD 1
Meridian Engineering Company $5,000.00 $55,000.00 Kirkland Construction LLLP $975.00 $10,725.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,750.00 $19,250.00 Engineer's Estimate 11 TON $715.00 $7,865.00
10 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0045 41201-0000 TACK COAT
Meridian Engineering Company $1,100.00 $39,600.00 Kirkland Construction LLLP $1,200.00 $43,200.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,150.00 $41,400.00 Engineer's Estimate 36 TON $650.00 $23,400.00
A0046 41301-0000 ASPHALT PAVEMENT MILLING
Meridian Engineering Company $4.00 $40,000.00 Kirkland Construction LLLP $5.00 $50,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $16.00 $160,000.00 Engineer's Estimate 10,000 SQYD $2.00 $20,000.00
A0047 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
Meridian Engineering Company $950.00 $257,450.00 Kirkland Construction LLLP $1,500.00 $406,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,750.00 $474,250.00 Engineer's Estimate 271 CUYD $1,500.00 $406,500.00
A0048 55220-0000 REPAIR CONCRETE
Meridian Engineering Company $1,500.00 $22,500.00 Kirkland Construction LLLP $2,000.00 $30,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,750.00 $26,250.00 Engineer's Estimate 15 SQYD $1,700.00 $25,500.00
A0049 55235-0000 EXPANSION JOINTS
Meridian Engineering Company $120.00 $3,240.00 Kirkland Construction LLLP $521.00 $14,067.00 Stormwater Plans, LLC dba SWP Contracting and Paving $290.00 $7,830.00 Engineer's Estimate 27 LNFT $200.00 $5,400.00
A0050 55240-0000 GROUT
Meridian Engineering Company $400.00 $22,000.00 Kirkland Construction LLLP $580.00 $31,900.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $8,250.00 Engineer's Estimate 55 CUFT $130.00 $7,150.00
11 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0051 55401-1000 REINFORCING STEEL
Meridian Engineering Company $2.50 $38,500.00 Kirkland Construction LLLP $3.00 $46,200.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1.75 $26,950.00 Engineer's Estimate 15,400 LB $2.50 $38,500.00
A0052 55401-2000 REINFORCING STEEL, EPOXY COATED
Meridian Engineering Company $7.00 $11,900.00 Kirkland Construction LLLP $3.50 $5,950.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2.15 $3,655.00 Engineer's Estimate 1,700 LB $4.25 $7,225.00
A0053 55601-1100 BRIDGE RAILING, STEEL, TWO RAIL
Meridian Engineering Company $500.00 $415,000.00 Kirkland Construction LLLP $320.00 $265,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $325.00 $269,750.00 Engineer's Estimate 830 LNFT $240.00 $199,200.00
A0054 55901-0000 MEMBRANE WATERPROOFING
Meridian Engineering Company $125.00 $22,000.00 Kirkland Construction LLLP $76.00 $13,376.00 Stormwater Plans, LLC dba SWP Contracting and Paving $52.00 $9,152.00 Engineer's Estimate 176 SQYD $90.00 $15,840.00
A0055 57501-0000 MINOR BRIDGE WORK
Meridian Engineering Company Lump Sum $5,000.00 Kirkland Construction LLLP Lump Sum $30,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $100,000.00 Engineer's Estimate ALL LPSM Lump Sum $25,000.00
A0056 60103-0000 CONCRETE, HEADWALL (FOR DOUBLE 8'X3' CBC)
Meridian Engineering Company $15,000.00 $30,000.00 Kirkland Construction LLLP $25,000.00 $50,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $32,000.00 $64,000.00 Engineer's Estimate 2 EACH $18,000.00 $36,000.00
12 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0057 60103-0000 CONCRETE, HEADWALL (FOR 8'x4' CBC)
Meridian Engineering Company $15,000.00 $30,000.00 Kirkland Construction LLLP $20,000.00 $40,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $32,000.00 $64,000.00 Engineer's Estimate 2 EACH $15,000.00 $30,000.00
A0058 60201-0800 24-INCH PIPE CULVERT (DUAL WALL HDPE)
Meridian Engineering Company $160.00 $129,600.00 Kirkland Construction LLLP $200.00 $162,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $205.00 $166,050.00 Engineer's Estimate 810 LNFT $130.00 $105,300.00
A0059 60201-1000 36-INCH PIPE CULVERT (DUAL WALL HDPE)
Meridian Engineering Company $200.00 $47,000.00 Kirkland Construction LLLP $250.00 $58,750.00 Stormwater Plans, LLC dba SWP Contracting and Paving $263.00 $61,805.00 Engineer's Estimate 235 LNFT $300.00 $70,500.00
A0060 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT (METAL)
Meridian Engineering Company $1,300.00 $59,800.00 Kirkland Construction LLLP $4,000.00 $184,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $875.00 $40,250.00 Engineer's Estimate 46 EACH $550.00 $25,300.00
A0061 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT (METAL)
Meridian Engineering Company $1,900.00 $15,200.00 Kirkland Construction LLLP $4,500.00 $36,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,300.00 $10,400.00 Engineer's Estimate 8 EACH $800.00 $6,400.00
A0062 60220-0000 PRECAST REINFORCED CONCRETE BOX CULVERT
Meridian Engineering Company $2,000.00 $1,122,000.00 Kirkland Construction LLLP $2,500.00 $1,402,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2,350.00 $1,318,350.00 Engineer's Estimate 561 LNFT $2,500.00 $1,402,500.00
13 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0063 60220-1750 8 FEET SPAN, 3 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT
Meridian Engineering Company $1,100.00 $187,000.00 Kirkland Construction LLLP $1,425.00 $242,250.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2,550.00 $433,500.00 Engineer's Estimate 170 LNFT $750.00 $127,500.00
A0064 60220-1800 8 FEET SPAN, 4 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT
Meridian Engineering Company $1,300.00 $65,000.00 Kirkland Construction LLLP $1,550.00 $77,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $3,200.00 $160,000.00 Engineer's Estimate 50 LNFT $950.00 $47,500.00
A0065 60707-0500 LINING 24-INCH PIPE CULVERT
Meridian Engineering Company $50.00 $30,000.00 Kirkland Construction LLLP $410.00 $246,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $245.00 $147,000.00 Engineer's Estimate 600 LNFT $150.00 $90,000.00
A0066 60901-1000 CURB, CONCRETE, 12-INCH DEPTH
Meridian Engineering Company $18.00 $41,220.00 Kirkland Construction LLLP $75.00 $171,750.00 Stormwater Plans, LLC dba SWP Contracting and Paving $46.00 $105,340.00 Engineer's Estimate 2,290 LNFT $35.00 $80,150.00
A0067 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS
Meridian Engineering Company $75.00 $26,250.00 Kirkland Construction LLLP $58.00 $20,300.00 Stormwater Plans, LLC dba SWP Contracting and Paving $58.00 $20,300.00 Engineer's Estimate 350 LNFT $40.00 $14,000.00
A0068 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT
Meridian Engineering Company $6,500.00 $104,000.00 Kirkland Construction LLLP $7,000.00 $112,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $7,000.00 $112,000.00 Engineer's Estimate 16 EACH $4,000.00 $64,000.00
14 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0069 61707-4000 STRUCTURE TRANSITION RAILING, MGS SYSTEM
Meridian Engineering Company $140.00 $84,000.00 Kirkland Construction LLLP $180.00 $108,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $182.00 $109,200.00 Engineer's Estimate 600 LNFT $150.00 $90,000.00
A0070 62030-0000 REPOINT STONE MASONRY
Meridian Engineering Company $200.00 $6,000.00 Kirkland Construction LLLP $580.00 $17,400.00 Stormwater Plans, LLC dba SWP Contracting and Paving $580.00 $17,400.00 Engineer's Estimate 30 LNFT $500.00 $15,000.00
A0071 62036-0000 JOINT SEALANT
Meridian Engineering Company $135.00 $16,200.00 Kirkland Construction LLLP $120.00 $14,400.00 Stormwater Plans, LLC dba SWP Contracting and Paving $46.00 $5,520.00 Engineer's Estimate 120 LNFT $25.00 $3,000.00
A0072 62201-0050 DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY
Meridian Engineering Company $120.00 $4,800.00 Kirkland Construction LLLP $132.00 $5,280.00 Stormwater Plans, LLC dba SWP Contracting and Paving $145.00 $5,800.00 Engineer's Estimate 40 HOUR $115.00 $4,600.00
A0073 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH
Meridian Engineering Company $80.00 $3,200.00 Kirkland Construction LLLP $100.00 $4,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $6,000.00 Engineer's Estimate 40 HOUR $135.00 $5,400.00
A0074 62301-0000 GENERAL LABOR
Meridian Engineering Company $34.00 $3,400.00 Kirkland Construction LLLP $100.00 $10,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $60.00 $6,000.00 Engineer's Estimate 100 HOUR $50.00 $5,000.00
15 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0075 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
Meridian Engineering Company $170.00 $6,800.00 Kirkland Construction LLLP $175.00 $7,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $285.00 $11,400.00 Engineer's Estimate 40 HOUR $150.00 $6,000.00
A0076 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
Meridian Engineering Company $175.00 $7,000.00 Kirkland Construction LLLP $235.00 $9,400.00 Stormwater Plans, LLC dba SWP Contracting and Paving $175.00 $7,000.00 Engineer's Estimate 40 HOUR $200.00 $8,000.00
A0077 62511-2000 SEEDING, HYDRAULIC METHOD
Meridian Engineering Company $0.25 $2,500.00 Kirkland Construction LLLP $0.10 $1,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $0.20 $2,000.00 Engineer's Estimate 10,000 SQYD $1.50 $15,000.00
A0078 62516-3000 MULCHING, HYDRAULIC METHOD, BONDED FIBER MATRIX
Meridian Engineering Company $0.50 $5,000.00 Kirkland Construction LLLP $0.45 $4,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $0.40 $4,000.00 Engineer's Estimate 10,000 SQYD $1.50 $15,000.00
A0079 62901-0000 ROLLED EROSION CONTROL PRODUCT
Meridian Engineering Company $8.00 $43,200.00 Kirkland Construction LLLP $3.80 $20,520.00 Stormwater Plans, LLC dba SWP Contracting and Paving $6.40 $34,560.00 Engineer's Estimate 5,400 SQYD $5.50 $29,700.00
A0080 63301-0000 SIGN SYSTEM
Meridian Engineering Company $450.00 $7,200.00 Kirkland Construction LLLP $405.00 $6,480.00 Stormwater Plans, LLC dba SWP Contracting and Paving $500.00 $8,000.00 Engineer's Estimate 16 EACH $390.00 $6,240.00
16 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0081 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID
Meridian Engineering Company $0.12 $18,276.00 Kirkland Construction LLLP $0.10 $15,230.00 Stormwater Plans, LLC dba SWP Contracting and Paving $0.15 $22,845.00 Engineer's Estimate 152,300 LNFT $0.20 $30,460.00
A0082 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN
Meridian Engineering Company $0.06 $2,178.00 Kirkland Construction LLLP $0.05 $1,815.00 Stormwater Plans, LLC dba SWP Contracting and Paving $0.07 $2,541.00 Engineer's Estimate 36,300 LNFT $0.18 $6,534.00
A0083 63405-0050 PAVEMENT MARKINGS, SYMBOLS
Meridian Engineering Company $100.00 $500.00 Kirkland Construction LLLP $58.00 $290.00 Stormwater Plans, LLC dba SWP Contracting and Paving $85.00 $425.00 Engineer's Estimate 5 EACH $150.00 $750.00
A0084 63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
Meridian Engineering Company Lump Sum $50,000.00 Kirkland Construction LLLP Lump Sum $175,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $638,000.00 Engineer's Estimate ALL LPSM Lump Sum $60,000.00
A0085 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
Meridian Engineering Company $500.00 $2,000.00 Kirkland Construction LLLP $85.00 $340.00 Stormwater Plans, LLC dba SWP Contracting and Paving $575.00 $2,300.00 Engineer's Estimate 4 EACH $400.00 $1,600.00
A0086 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE
Meridian Engineering Company $75.00 $16,500.00 Kirkland Construction LLLP $20.00 $4,400.00 Stormwater Plans, LLC dba SWP Contracting and Paving $23.00 $5,060.00 Engineer's Estimate 220 EACH $20.00 $4,400.00
17 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0087 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
Meridian Engineering Company $15,000.00 $30,000.00 Kirkland Construction LLLP $10,000.00 $20,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $4,200.00 $8,400.00 Engineer's Estimate 2 EACH $12,000.00 $24,000.00
A0088 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
Meridian Engineering Company $0.15 $15,450.00 Kirkland Construction LLLP $0.13 $13,390.00 Stormwater Plans, LLC dba SWP Contracting and Paving $0.20 $20,600.00 Engineer's Estimate 103,000 LNFT $0.17 $17,510.00
A0089 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
Meridian Engineering Company $3.50 $7,000.00 Kirkland Construction LLLP $5.00 $10,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $5.00 $10,000.00 Engineer's Estimate 2,000 LNFT $2.00 $4,000.00
A0090 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
Meridian Engineering Company $35.00 $10,150.00 Kirkland Construction LLLP $22.00 $6,380.00 Stormwater Plans, LLC dba SWP Contracting and Paving $12.00 $3,480.00 Engineer's Estimate 290 SQFT $20.00 $5,800.00
A0091 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
Meridian Engineering Company $38.00 $45,600.00 Kirkland Construction LLLP $58.00 $69,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $60.00 $72,000.00 Engineer's Estimate 1,200 HOUR $50.00 $60,000.00
A0092 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
Meridian Engineering Company $48.00 $9,600.00 Kirkland Construction LLLP $70.00 $14,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $80.00 $16,000.00 Engineer's Estimate 200 HOUR $85.00 $17,000.00
18 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Total Schedule - All Items
Meridian Engineering Company $9,531,034.00 Kirkland Construction LLLP $10,385,781.00 Stormwater Plans, LLC dba SWP Contracting and Paving $13,568,737.00 Engineer's Estimate $7,920,593.00
19 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Schedule: X
Schedule Type: Options
Solcitation No: 6982AF20B000003
Division: Central Federal Lands
State: AZ County: Apache, Navajo
Federal Land: Petrified Forest National Park Opened at: Lakewood, CO
Opened by: Leslie Karsten
Date: 11/21/19
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Meridian Engineering Company $4,445,660.00 3855 N. Business Center Drive Tucson, AZ 85705
Kirkland Construction LLLP $5,171,632.50 2101 Main St Rye, CO 81069
Stormwater Plans, LLC dba SWP Contracting and Paving $6,180,286.00 5624 N. 54th Avenue
Engineer's Estimate $4,734,254.00
20 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X1000 15101-0000 MOBILIZATION
Meridian Engineering Company Lump Sum $125,000.00 Kirkland Construction LLLP Lump Sum $36,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $610,000.00 Engineer's Estimate ALL LPSM Lump Sum $488,000.00
X1001 15210-3000 CENTERLINE, VERIFICATION AND STAKING
Meridian Engineering Company $4,000.00 $22,600.00 Kirkland Construction LLLP $2,500.00 $14,125.00 Stormwater Plans, LLC dba SWP Contracting and Paving $4,200.00 $23,730.00 Engineer's Estimate 5.65 MILE $3,600.00 $20,340.00
X1002 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
Meridian Engineering Company $700.00 $11,900.00 Kirkland Construction LLLP $950.00 $16,150.00 Stormwater Plans, LLC dba SWP Contracting and Paving $525.00 $8,925.00 Engineer's Estimate 17 EACH $1,000.00 $17,000.00
X1003 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES
Meridian Engineering Company $8,000.00 $1,200.00 Kirkland Construction LLLP $9,500.00 $1,425.00 Stormwater Plans, LLC dba SWP Contracting and Paving $24,500.00 $3,675.00 Engineer's Estimate 0.15 MILE $10,000.00 $1,500.00
X1004 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL
Meridian Engineering Company $8,000.00 $1,200.00 Kirkland Construction LLLP $9,500.00 $1,425.00 Stormwater Plans, LLC dba SWP Contracting and Paving $14,000.00 $2,100.00 Engineer's Estimate 0.15 MILE $8,000.00 $1,200.00
X1005 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE
Meridian Engineering Company Lump Sum $14,000.00 Kirkland Construction LLLP Lump Sum $18,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $100,000.00 Engineer's Estimate ALL LPSM Lump Sum $102,000.00
21 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X1006 15401-0000 CONTRACTOR TESTING
Meridian Engineering Company Lump Sum $100,000.00 Kirkland Construction LLLP Lump Sum $47,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $81,000.00
X1007 15501-0000 CONSTRUCTION SCHEDULE
Meridian Engineering Company Lump Sum $1,500.00 Kirkland Construction LLLP Lump Sum $1,200.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $15,000.00 Engineer's Estimate ALL LPSM Lump Sum $8,000.00
X1008 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
Meridian Engineering Company $4.25 $5,950.00 Kirkland Construction LLLP $3.00 $4,200.00 Stormwater Plans, LLC dba SWP Contracting and Paving $3.50 $4,900.00 Engineer's Estimate 1,400 LNFT $4.00 $5,600.00
X1009 15802-0000 WATERING FOR DUST CONTROL
Meridian Engineering Company Lump Sum $15,000.00 Kirkland Construction LLLP Lump Sum $40,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $100,000.00 Engineer's Estimate ALL LPSM Lump Sum $2,000.00
X1010 20101-0000 CLEARING AND GRUBBING
Meridian Engineering Company $4,000.00 $2,000.00 Kirkland Construction LLLP $40,000.00 $20,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $8,200.00 $4,100.00 Engineer's Estimate 0.5 ACRE $6,000.00 $3,000.00
X1011 20301-1900 REMOVAL OF PIPE CULVERT
Meridian Engineering Company $1,500.00 $45,000.00 Kirkland Construction LLLP $4,200.00 $126,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,875.00 $56,250.00 Engineer's Estimate 30 EACH $1,500.00 $45,000.00
22 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X1012 20301-2400 REMOVAL OF SIGN
Meridian Engineering Company $250.00 $4,250.00 Kirkland Construction LLLP $120.00 $2,040.00 Stormwater Plans, LLC dba SWP Contracting and Paving $140.00 $2,380.00 Engineer's Estimate 17 EACH $120.00 $2,040.00
X1013 20302-0200 REMOVAL OF CURB
Meridian Engineering Company $5.00 $7,650.00 Kirkland Construction LLLP $15.00 $22,950.00 Stormwater Plans, LLC dba SWP Contracting and Paving $13.00 $19,890.00 Engineer's Estimate 1,530 LNFT $8.00 $12,240.00
X1014 20315-0000 SAWCUTTING PAVEMENT
Meridian Engineering Company $1.00 $6,100.00 Kirkland Construction LLLP $11.00 $67,100.00 Stormwater Plans, LLC dba SWP Contracting and Paving $2.30 $14,030.00 Engineer's Estimate 6,100 LNFT $2.10 $12,810.00
X1015 20401-0000 ROADWAY EXCAVATION
Meridian Engineering Company $30.00 $27,000.00 Kirkland Construction LLLP $53.00 $47,700.00 Stormwater Plans, LLC dba SWP Contracting and Paving $53.00 $47,700.00 Engineer's Estimate 900 CUYD $25.00 $22,500.00
X1016 20402-0000 SUBEXCAVATION
Meridian Engineering Company $160.00 $720,000.00 Kirkland Construction LLLP $81.00 $364,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $122.00 $549,000.00 Engineer's Estimate 4,500 CUYD $60.00 $270,000.00
X1017 20441-0000 WASTE
Meridian Engineering Company $23.00 $115,000.00 Kirkland Construction LLLP $40.00 $200,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $21.00 $105,000.00 Engineer's Estimate 5,000 CUYD $15.00 $75,000.00
23 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X1018 25101-2200 PLACED RIPRAP, METHOD B, CLASS 2
Meridian Engineering Company $150.00 $42,000.00 Kirkland Construction LLLP $266.00 $74,480.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $42,000.00 Engineer's Estimate 280 CUYD $120.00 $33,600.00
X1019 25101-2300 PLACED RIPRAP, METHOD B, CLASS 3
Meridian Engineering Company $150.00 $10,500.00 Kirkland Construction LLLP $266.00 $18,620.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $10,500.00 Engineer's Estimate 70 CUYD $110.00 $7,700.00
X1020 30202-2000 ROADWAY AGGREGATE, METHOD 2
Meridian Engineering Company $60.00 $90,000.00 Kirkland Construction LLLP $48.00 $72,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $70.00 $105,000.00 Engineer's Estimate 1,500 TON $70.00 $105,000.00
X1021 30302-1000 DITCH RECONDITIONING
Meridian Engineering Company $2.50 $9,500.00 Kirkland Construction LLLP $21.00 $79,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $11.00 $41,800.00 Engineer's Estimate 3,800 LNFT $7.00 $26,600.00
X1022 31002-1000 COLD IN-PLACE RECYCLED ASPHALT BASE COURSE, TYPE A
Meridian Engineering Company $6.00 $522,000.00 Kirkland Construction LLLP $4.50 $391,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $7.00 $609,000.00 Engineer's Estimate 87,000 SQYD $9.00 $783,000.00
X1023 31010-0000 EMULSIFIED ASPHALT (CSS ENGINEERING EMULSION OR PASS R EMULSION)
Meridian Engineering Company $800.00 $269,600.00 Kirkland Construction LLLP $530.00 $178,610.00 Stormwater Plans, LLC dba SWP Contracting and Paving $875.00 $294,875.00 Engineer's Estimate 337 TON $1,300.00 $438,100.00
24 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X1025 40101-1000 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3
MILLION ESAL
Meridian Engineering Company $135.00 $1,417,500.00 Kirkland Construction LLLP $120.00 $1,260,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $117.00 $1,228,500.00 Engineer's Estimate 10,500 TON $100.00 $1,050,000.00
X1026 40105-3000 ANTISTRIP ADDITIVE, TYPE 3
Meridian Engineering Company $340.00 $35,700.00 Kirkland Construction LLLP $200.00 $21,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $263.00 $27,615.00 Engineer's Estimate 105 TON $200.00 $21,000.00
X1028 40601-0000 FOG SEAL
Meridian Engineering Company $750.00 $29,250.00 Kirkland Construction LLLP $900.00 $35,100.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,075.00 $41,925.00 Engineer's Estimate 39 TON $600.00 $23,400.00
X1029 41101-1000 PRIME COAT, METHOD 1
Meridian Engineering Company $5,000.00 $25,000.00 Kirkland Construction LLLP $975.00 $4,875.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,700.00 $8,500.00 Engineer's Estimate 5 TON $715.00 $3,575.00
X1030 41201-0000 TACK COAT
Meridian Engineering Company $1,000.00 $40,000.00 Kirkland Construction LLLP $900.00 $36,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,150.00 $46,000.00 Engineer's Estimate 40 TON $650.00 $26,000.00
X1031 41301-0000 ASPHALT PAVEMENT MILLING
Meridian Engineering Company $3.50 $27,300.00 Kirkland Construction LLLP $4.50 $35,100.00 Stormwater Plans, LLC dba SWP Contracting and Paving $14.00 $109,200.00 Engineer's Estimate 7,800 SQYD $2.00 $15,600.00
25 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X1032 50101-0600 MINOR CONCRETE PAVEMENT, REINFORCED, 6-INCH DEPTH
Meridian Engineering Company $165.00 $20,625.00 Kirkland Construction LLLP $100.00 $12,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $145.00 $18,125.00 Engineer's Estimate 125 SQYD $110.00 $13,750.00
X1033 60103-0180 CONCRETE, HEADWALL FOR 36-INCH PIPE CULVERT
Meridian Engineering Company $15,000.00 $15,000.00 Kirkland Construction LLLP $5,000.00 $5,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $9,000.00 $9,000.00 Engineer's Estimate 1 EACH $5,000.00 $5,000.00
X1034 60201-0800 24-INCH PIPE CULVERT (DUAL WALL HDPE)
Meridian Engineering Company $155.00 $139,500.00 Kirkland Construction LLLP $200.00 $180,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $200.00 $180,000.00 Engineer's Estimate 900 LNFT $130.00 $117,000.00
X1035 60201-1000 36-INCH PIPE CULVERT (DUAL WALL HDPE)
Meridian Engineering Company $200.00 $16,400.00 Kirkland Construction LLLP $250.00 $20,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $255.00 $20,910.00 Engineer's Estimate 82 LNFT $300.00 $24,600.00
X1036 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT (METAL)
Meridian Engineering Company $1,200.00 $108,000.00 Kirkland Construction LLLP $2,000.00 $180,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $875.00 $78,750.00 Engineer's Estimate 90 EACH $550.00 $49,500.00
X1037 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT (METAL)
Meridian Engineering Company $1,800.00 $16,200.00 Kirkland Construction LLLP $2,500.00 $22,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $1,300.00 $11,700.00 Engineer's Estimate 9 EACH $800.00 $7,200.00
26 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X1038 60707-0500 LINING 24-INCH PIPE CULVERT
Meridian Engineering Company $40.00 $72,000.00 Kirkland Construction LLLP $375.00 $675,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $400.00 $720,000.00 Engineer's Estimate 1,800 LNFT $150.00 $270,000.00
X1039 60707-0700 LINING 36-INCH PIPE CULVERT
Meridian Engineering Company $45.00 $10,800.00 Kirkland Construction LLLP $470.00 $112,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $525.00 $126,000.00 Engineer's Estimate 240 LNFT $200.00 $48,000.00
X1040 60901-1000 CURB, CONCRETE, 12-INCH DEPTH
Meridian Engineering Company $18.00 $126,000.00 Kirkland Construction LLLP $75.00 $525,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $32.00 $224,000.00 Engineer's Estimate 7,000 LNFT $35.00 $245,000.00
X1041 61501-0200 SIDEWALK, COLORED CONCRETE
Meridian Engineering Company $125.00 $21,250.00 Kirkland Construction LLLP $100.00 $17,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $62.00 $10,540.00 Engineer's Estimate 170 SQYD $100.00 $17,000.00
X1042 62511-2000 SEEDING, HYDRAULIC METHOD
Meridian Engineering Company $0.22 $2,365.00 Kirkland Construction LLLP $0.10 $1,075.00 Stormwater Plans, LLC dba SWP Contracting and Paving $0.20 $2,150.00 Engineer's Estimate 10,750 SQYD $1.50 $16,125.00
X1043 62516-3000 MULCHING, HYDRAULIC METHOD, BONDED FIBER MATRIX
Meridian Engineering Company $0.48 $5,160.00 Kirkland Construction LLLP $0.45 $4,837.50 Stormwater Plans, LLC dba SWP Contracting and Paving $0.40 $4,300.00 Engineer's Estimate 10,750 SQYD $1.50 $16,125.00
27 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X1044 62901-0000 ROLLED EROSION CONTROL PRODUCT
Meridian Engineering Company $7.50 $18,750.00 Kirkland Construction LLLP $3.80 $9,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $6.30 $15,750.00 Engineer's Estimate 2,500 SQYD $5.50 $13,750.00
X1045 63301-0000 SIGN SYSTEM
Meridian Engineering Company $450.00 $9,000.00 Kirkland Construction LLLP $405.00 $8,100.00 Stormwater Plans, LLC dba SWP Contracting and Paving $500.00 $10,000.00 Engineer's Estimate 20 EACH $390.00 $7,800.00
X1046 63316-1000 REMOVE AND RESET SIGN
Meridian Engineering Company $400.00 $400.00 Kirkland Construction LLLP $520.00 $520.00 Stormwater Plans, LLC dba SWP Contracting and Paving $645.00 $645.00 Engineer's Estimate 1 EACH $215.00 $215.00
X1047 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID
Meridian Engineering Company $0.12 $21,672.00 Kirkland Construction LLLP $0.10 $18,060.00 Stormwater Plans, LLC dba SWP Contracting and Paving $0.15 $27,090.00 Engineer's Estimate 180,600 LNFT $0.20 $36,120.00
X1048 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN
Meridian Engineering Company $0.06 $1,788.00 Kirkland Construction LLLP $0.05 $1,490.00 Stormwater Plans, LLC dba SWP Contracting and Paving $0.07 $2,086.00 Engineer's Estimate 29,800 LNFT $0.18 $5,364.00
X1049 63405-0050 PAVEMENT MARKINGS, SYMBOLS (TYPE B)
Meridian Engineering Company $60.00 $300.00 Kirkland Construction LLLP $58.00 $290.00 Stormwater Plans, LLC dba SWP Contracting and Paving $85.00 $425.00 Engineer's Estimate 5 EACH $150.00 $750.00
28 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X1050 63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
Meridian Engineering Company Lump Sum $10,000.00 Kirkland Construction LLLP Lump Sum $22,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $170,000.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00
X1051 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE
Meridian Engineering Company $50.00 $11,000.00 Kirkland Construction LLLP $20.00 $4,400.00 Stormwater Plans, LLC dba SWP Contracting and Paving $23.00 $5,060.00 Engineer's Estimate 220 EACH $20.00 $4,400.00
X1052 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
Meridian Engineering Company $500.00 $1,000.00 Kirkland Construction LLLP $10,000.00 $20,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $4,200.00 $8,400.00 Engineer's Estimate 2 EACH $12,000.00 $24,000.00
X1053 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
Meridian Engineering Company $0.15 $18,000.00 Kirkland Construction LLLP $0.13 $15,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $0.20 $24,000.00 Engineer's Estimate 120,000 LNFT $0.17 $20,400.00
X1054 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
Meridian Engineering Company $3.50 $3,500.00 Kirkland Construction LLLP $5.00 $5,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $5.00 $5,000.00 Engineer's Estimate 1,000 LNFT $2.00 $2,000.00
X1055 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
Meridian Engineering Company $35.00 $8,050.00 Kirkland Construction LLLP $22.00 $5,060.00 Stormwater Plans, LLC dba SWP Contracting and Paving $12.00 $2,760.00 Engineer's Estimate 230 SQFT $20.00 $4,600.00
29 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X1056 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
Meridian Engineering Company $38.00 $38,000.00 Kirkland Construction LLLP $58.00 $58,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $60.00 $60,000.00 Engineer's Estimate 1,000 HOUR $50.00 $50,000.00
X1057 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
Meridian Engineering Company $48.00 $7,200.00 Kirkland Construction LLLP $70.00 $10,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $80.00 $12,000.00 Engineer's Estimate 150 HOUR $85.00 $12,750.00
Total Schedule - All Items
Meridian Engineering Company $4,445,660.00 Kirkland Construction LLLP $5,171,632.50 Stormwater Plans, LLC dba SWP Contracting and Paving $6,180,286.00 Engineer's Estimate $4,734,254.00
30 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Schedule: Y
Schedule Type: Options
Solcitation No: 6982AF20B000003
Division: Central Federal Lands
State: AZ County: Apache, Navajo
Federal Land: Petrified Forest National Park Opened at: Lakewood, CO
Opened by: Leslie Karsten
Date: 11/21/19
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Kirkland Construction LLLP $4,641,525.00 2101 Main St Rye, CO 81069
Meridian Engineering Company $5,911,636.00 3855 N. Business Center Drive Tucson, AZ 85705
Stormwater Plans, LLC dba SWP Contracting and Paving $6,384,310.00 5624 N. 54th Avenue
Engineer's Estimate $4,150,127.00
31 out of 39Source Selection Information - See FAR 2.101 & 3.104
Project No: AZ FTNP PEFO 10(7)
Project Name: Main Park Road
Schedule: Y
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Y1000 15101-0000 MOBILIZATION
Kirkland Construction LLLP Lump Sum $36,000.00 Meridian Engineering Company Lump Sum $125,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $630,000.00 Engineer's Estimate ALL LPSM Lump Sum $428,000.00
Y1001 15210-3000 CENTERLINE, VERIFICATION AND STAKING
Kirkland Construction LLLP $2,500.00 $9,000.00 Meridian Engineering Company $5,000.00 $18,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $4,200.00 $15,120.00 Engineer's Estimate 3.60 MILE $3,600.00 $12,960.00
Y1002 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
Kirkland Construction LLLP $950.00 $15,200.00 Meridian Engineering Company $800.00 $12,800.00 Stormwater Plans, LLC dba SWP Contracting and Paving $525.00 $8,400.00 Engineer's Estimate 16 EACH $1,000.00 $16,000.00
Y1003 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE
Kirkland Construction LLLP Lump Sum $18,000.00 Meridian Engineering Company Lump Sum $14,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $77,500.00 Engineer's Estimate ALL LPSM Lump Sum $87,000.00
Y1004 15401-0000 CONTRACTOR TESTING
Kirkland Construction LLLP Lump Sum $47,000.00 Meridian Engineering Company Lump Sum $85,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $176,000.00 Engineer's Estimate ALL LPSM Lump Sum $71,000.00
Y1005 15501-0000 CONSTRUCTION SCHEDULE
Kirkland Construction LLLP Lump Sum $1,200.00 Meridian Engineering Company Lump Sum $1,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $7,600.00 Engineer's Estimate ALL LPSM…