AZ FTBR SALT 80(1) Horse Mesa Bridge
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 6982AF22B000034
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Apache Junction, Arizona 85119, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is for the construction of a new prefabricated bridge and roadway realignment on Forest Route 80 over the Upper Car Wash area within the Tonto National Forest in Arizona. The Department of Transportation Federal Highway Administration seeks to award a contract to replace the existing Horse Mesa bridge, which has issues with vertical clearance and drainage. The project scope includes construction of a new prefabricated steel bridge, abutments, wingwalls, and realignment of approximately 200 linear feet of roadway. Proposals will be evaluated based on technical qualifications and price. The deadline for questions is September 7, 2022.
This opportunity is set aside for total small business concerns. The principal NAICS code is 237990 and PSC code is F. The estimated price range for constructing the new 16' x 98' prefabricated steel bridge, concrete work, excavation, retaining walls, reinforcing steel, roadway aggregate, and realigning the roadway is between $700,000 to $2,000,000. Key work items include approximately 1 bridge, 28 cubic yards of concrete, 130 cubic yards of excavation, and 240 tons of roadway aggregate. The anticipated schedule is to advertise in September 2022, award in November 2022, and complete construction from November 2022 to October 2023.
Notice text
THIS IS NOT A REQUEST FOR BID
PLANS AND SPECIFICATIONS ARE NOT AVAILABLE
PROJECT NUMBER: AZ FTBR SALT 80(1)
PROJECT NAME: Horse Mesa Bridge
PROJECT DESCRIPTION: This project proposes to construct a new prefabricated bridge adjacent to the existing Horse Mesa bridge structure within the Tonto National Forest on Forest Route FR 80 (MP 3.90) over the Upper Car Wash area. The existing bridge is located under a rock outcropping that creates a vertical clearance issues and drainage concerns during rain events. The existing bridge will remain in place for use in emergency situations. The existing unpaved roadway will be realigned to provide connection with the new bridge.
SCOPE OF THE WORK: The scope of work includes construction of a new prefabricated steel superstructure with an open grid steel deck and bridge rail, construction of new abutments and wingwalls, and realignment of approximately 200 linear feet of roadway. The roadway will be realigned east to connect the new bridge with the existing roadway, which will provide access to the Horse Mesa Dam at all times. The roadway structural section will consist of 6 inches of roadway aggregate.
PRINCIPAL WORK ITEMS: Approximate quantities of principal work items include:
• 1 prefabricated steel bridge (16’ x 98’)
• 28 cubic yards of structural concrete
• 130 cubic yards of structure excavation
• 275 square feet of reinforced concrete retaining wall
• 3,600 pounds of reinforcing steel
• 240 ton of roadway aggregate
• 355 cubic yards of roadway excavation
ANTICIPATED SCHEDULE: Advertisement is anticipated in September 2022, with contract award date in November 2022 and construction anticipated from November 2022 to October 2023. This duration includes time required for submittals and approvals of bridge drawings and prefabrication of the bridge.
ESTIMATED COST RANGE: The estimated price range for this project is between $700,000 and $2,000,000.
Notice history
| Notice | Type | Posted |
|---|---|---|
| AZ FTBR SALT 80(1) Horse Mesa Bridge | Award Notice | |
| AZ FTBR SALT 80(1) Horse Mesa Bridge | Solicitation | |
| This notice | Pre-Solicitation | |
| AZ FTBR SALT 80(1) Horse Mesa Bridge | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| UT NP ARCH 100(2) Bridges on Delicate Arch Road | Federal Highway Administration | No set-aside | |
| AZ BL COLO 7528(1) Burro Creek Road | Federal Highway Administration | Total Small Business | |
| Cisco Branch Ontonagon River Bridge Replacement | Forest Service | Total Small Business | |
| Acadia National Park | Federal Highway Administration | Total Small Business | |
| WY BR WYAO US20(1) US 20 and Hayden Arch Bridge Repairs | Federal Highway Administration | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity