ATFP Off-Installation Facility Physical Security Improvements for Naval Submarine Base New London, Groton, CT and Naval Station Newport, Newport Rhode Island
Award Notice Posted
- Solicitation number
- N4008518R7318
- Agency
-
Naval Facilities Engineering Command
Department of the Navy, Department of Defense
- Awarded
- to Tantara Associates Corp
- Set-aside
- Competitive 8(a)
Opportunity facts
- Contract number
- N40085-16-D-3045 N4008518F6777 Federal contract award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
4 versions
Update #4 · Latest ·
ATFP Off-Installation Facility Physical Security Improvements for Naval Submarine Base New London, Groton, CT and Naval Station Newport, Newport Rhode Island. The contract was competed under the MIDLANT 8(a) competitive Multiple Award Construction Contract to: Tantara Associates Corporation.. Awarded Vendors: TANTARA ASSOCIATES CORPORATION (DUNS 030000835)
54 MASON ST
WORCESTER MA 01610-3252
. Contract Award Dollar Amount: 1,748,785.00. Contract Award Date: 2018-09-29.
Update #3 ·
ATFP Off-Installation Facility Physical Security Improvements New London and Newport Naval Facilities
The amendment does the following.
1. The Base Bid, CLIN 0001-New London ATFP Renovations, requires a Supervisor/Safety (1)and a
Quality Control person.
2. The Option CLIN 0002, Newport ATFP Renovations, requires a Supervisor/Safety (1)and a
Quality Control person (1).
3.Due to two separate locations and the distance, each location requires Supervisor/Safety and
Quality Control personnel.
Solicitation due date and time remains September 4th, 2018, 2:00PM EST..
Update #2 ·
The following changes have been made. See attachments to this amendment.
14. a. NFAS 5252.228-9305 Notice of Bonding Requirements is replaced with FAR 52.228-15, Performance and Payment Bonds ? Construction.
And NFAS language: NOTICE OF BONDING REQUIREMENTS Within ___10__ days after receipt of award, the bidder/offeror to whom the award is made shall furnish the bonds required by FAR Clause FAR 52.228-15.
Bidders/offerors are hereby notified that the contract time for purposes of fixi ng the completion date, default, and liquidated damages will be as stated in FAR Clause 52.211-10 Commencement, Prosecution, and Completion of Work, regardless of when performance and payment bonds or deposits in lieu of surety are executed .
(End of NAVFAC language)
b. 5252.236-9307 DRAWINGS PREPARED BY AN ARCHITECT-ENGINEER (JUN 1994) is replac ed with the following requirement per NFAS 36.609-102 NAVFAC: DRAWINGS PREPARED BY AN ARCHITECT-ENGINEER The engineer or architect signing the drawings must be registered in the country of record for the architect-engineer firm or the country of the proposed constr
uction -- as a Professional Engineer (P.E.) or Registered Architect (R.A.). In a ddition, the drawings shall be signed by a responsible person of corporate statu s in the architect-engineer firm and stamped with his/her registration seal when the seal is authorized by the country where the project is to be constructed.
(End of NAVFAC language) c. 5252.236-9309 KEY PERSONNEL (JUN 1994) is replaced with the following NFAS requ irement: NFAS 36.609-102 NAVFAC; KEY PERSONNEL The Architect-Engineer (A-E) shall employ the following professional personnel t o perform the services required under this contract. Prior to starting work, the A-E will forward to the Contracting Officer a resume for the individual(s) assi
gned to each discipline to be utilized. No substitution will be made without the advance written approval of the Contracting Officer, after he has reviewed the proposed replacements experience and qualifications record submitted by the arch itect-engineer firm with explanation of the necessity for the change. No increas e in salary rates will be allowed when personnel substitution is authorized.
DISCIPLINE NAME JOB TITLE (End of NAVFAC language)
d. NFAS 5252.236-9312 DESIGN-BUILD CONTRACT- ORDER OF PRECENDENCE (AUGUST 2006) is deleted from the solicitation. e. NFAS 5252.236-9304, UTILITIES FOR CONSTRUCTION AND TESTING (JUNE 1994) is rep
laced with: NFAS; 36.5-100 NAVFAC; UTILITIES FOR CONSTRUCTION AND TESTING The Contractor shall be responsible for obtaining, either from available Governm ent sources or local utility companies, all utilities required for construction and testing. The Contractor shall provide these utilities at his expense, paid f or at the current utility rate delivered to the job site. The Contractor shall p rovide and maintain all temporary utility connections and distribution lines, an d all meters required to measure the amount of each utility used. (End of NAVFAC language) Does Contractor provide all of his own utilities? Yes f. NFAS 5252.214-9301, NOTICE TO BIDDERS (JUN 1994) is replaced with FAR 52.214-12, Preparation of Bids.
g. FAR Clause 52.211-12, Liquidated Damages?Construction is changed as follows:
Liquidated damages: $600.00 per calendar day for base and 1st Option (see breakd own table below) if awarded together. CLIN Item LDs Duration/Days Notes: 1 Base Price-NL $450.00 380 2 Option Item No. 1 - NP $200.00 380 Days from Option Award Total (If awarded together) $600.00 380 Duration if Base and Option are awar ded together
h. There is an updated bid schedule attached to this amendment. An explanation o f the schedule is as follows:
The intent is for the contractor to provide a price to perform site surveys to c omplete the checklist and document existing conditions at all of the listed faci lities as one lump sum in 0001AA.
The contractor should provide a unit price for 1 square foot of window film in C LIN 0001AF. The total price for CLIN 001AF should be the square foot price time s 3000 square foot. We will modify the contract based on an approved/negotiated area of film after government review of the survey results. However, the contr act should expect the final amount to be at least the 1000 square foot minimum a rea listed in the description.
For the remaining CLINs, the contractor should provide a unit price for 1 of eac h of the items. The total price for each CLIN should be the unit price times th
e number of units listed for that item. We will modify the contract based on an approved/negotiated numbers of each item to be installed after government revie w of the survey results. However, the contract should expect the final amount to be at least the minimum number of items for each description listed. Example 1, CLIN001AB requests a unit price for 1 door. The number of units is 1 . The total price for CLIN 0001AB will be the price of 1 door, but we may not a ward any door installations because the minimum number in the description is 0.
Example 2, CLIN001AD1 requests a unit price for 1 doorbell. The number of units is 5. The total price for CLIN 0001AD1 will be the price of 5 doorbells, but m ay only award 1 doorbell installations because the minimum number in the descrip tion is 1.
The successful contractor will be awarded a contract to start the site surveys l isted in CLIN 0001AA. There will be a planned MOD to the contract to award negotiated quantities on t he remaining CLINs. The funding document will have funds to cover award of the sum of the Total Price for CLIN spreadsheet column for all CLINs. I. There will be no tax exemption forms for this solicitation issued. j. POC for this amendment is Mike Giangregorio. Michael.giangregorio@navy.mil..
Update #1 ·
This solicitation is ONLY FOR MIDLANT MACC Holders ML-C00048 Title: ATFP Off-Installation Facility Physical Security Improvements Location of the work: Naval Submarine Base New London, Groton CT and NS Newport Newport, Rhode Island Description of the work: This is a Design Build project. The General Scope of the project includes, but is not limited to: site visits to off installation Navy facilities in Rhode Island and throughout the New London Area in Connecticut to complete a Physical Security Improvements Checklist for each facility to validate physical security capabilities required for each facility. Physical security capabilities to be installed at each facility may include a secondary exit, door hardware, doorbell, door chime, peep hole, fragment retention film, and/or window shades. Proposal Requirement: A full-time site Superintendent a full-time Quality Control (QC)/Site Safety and Health Office (SSHO) are required to be on site for the duration of the project. The Quality Control Manager may serve as the Site Safety and Health Officer (SSHO) as long as all requirements in Section 01 35 26 (Governmental Safety Requirements) are met. Estimated Budget Amount or Estimated Cost Range: The Budget to Estimate amount is between $1,000,000.00 and $5,000,000.00 NAICS Code: 236220 FSC/PSC: Z2JZ Time for completion: All work, Base Bid and Option shall be completed within calendar 380 days after contract award. See Bid Schedule for explanation of contract duration. Wage Determination: The following Department of Labor (DOL) General Wage Decisions applies to this Task Order: General Decision Number RT180001 07/06/2018 RT1 and CT180024 07/27/2018 CT24. Should these wage determinations be updated by the DOL prior to award, the most current wage determination will be incorporated at time of award (Attachment G and H)..