Assembly of Shelving Racks
Closed Solicitation Posted
- Solicitation number
- SP7000-24-Q-0014
- Agency
- Defense Logistics Agency Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238390 Other Building Finishing Contractors
- Place of performance
- Altus AFB, Oklahoma 73145, United States
- Points of contact
-
- Tina Grujic tina.grujic@dla.mil (717) 770-8780
- David Purvis david.1.purvis@dla.mil (614) 693-3381
Notice details come from SAM.gov. Updated .
About this opportunity
The Defense Logistics Agency (DLA) is seeking services to remove and install a new racking system at a facility located at Tinker Air Force Base in Altus, Oklahoma. The key requirements include removing 54 cross beams and 10 uprights, installing 10 new uprights and 72 new cross beams, and installing wire decking (shelving) on the bottom 2 rows. This is a one-time requirement that must be completed within 30 days of contract award. Quotes are due by June 15, 2024 and the expected start date is July 19, 2024. Pricing shall be submitted on a Firm Fixed Price basis.
This solicitation is a 100% Small Business/Local Area set-aside with a NAICS code of 238390 - Other Building Finishing Contractors. No potential incumbents or current contractors are named, and the total award value is not specified. The place of performance is Tinker Air Force Base in Altus, Oklahoma.
Notice text
3 versions
Update #3 · Latest ·
Defense Logistics Agency (DLA) Data ProductionsOperations seeks to procure services to remove and install a new
racking system:
- One time requirement that must be completed in 30 days after award.
- Remove 54 cross beams and stacking for later use.
- Remove 10 uprights in the warehouse and stack on provided pallet outside.
- Install 10 new uprights following all manufacturer guidelines within the same footprint of the old uprights.
- Install 72 cross beams mirroring the new setup that has already been established in row l of the warehouse.
- Install wire decking (shelving) on bottom 2 rows (36 total).
Amendment 00001:
The closing date of SP7000-24-Q-0014 is extended to 24 June 2024 at 14:00.
- What is the height of the uprights? 25 ft (H) x 4 ft (D)
- What is the length of the beams? 9 ft
- Is a scissor lift needed? Yes, scissor lift would be recommended.
- Is a forklift needed? Yes
- Will ladders be sufficient for installation? Scissor lift would be recommended due to the height of the racks.
- Do ladders, forklifts, and scissor lift need to be provided or are they on site to be used? They will need to be provided.
- What size are the old uprights? 25 ft (H) x 3 ½ ft (D)
- What size are the old beams? 9 ft
- What size are the new uprights? 25 ft (H) x 4 ft (D)
- How many shelf levels is each bay? 4
- How much weight does each shelf level need to hold? 1200 LBS
- Can you provide picture or layout of old system? See attached
- Can you provide picture or layout of new system? The new layout will mirror the previous layout.
- Does the offeror need to include procurement of new racking materials, or will it be provided? The new racking material has been purchased and is on-site (minus bolts for uprights to floor).
- Are there drawings and pictures of the work area available? See attached.
- What does the area look like? See attached.
- Are site visits available? Yes, we can schedule a site visit M-F from 0700 to 1400 CST.
- What size cross beams and uprights are required to be demolished? Uprights are 25 ft (H) x 3 ½ ft (D) and cross beams are 9 ft wide.
- What size uprights, cross beams, and wire decking are being installed? Uprights to be installed are 25 ft (H) x 4 ft (D). Same cross beams need to be installed.
- Will equipment be needed to demo and install? Yes
- What material is being installed and demolished? DLA material is to be taken down and installed.
- What are the manufacturer’s guidelines for installation? Uprights and cross beams have been purchased through Granger and Uline. The uprights were manufactured by Husky Rack and Wire.
Amendment 0002:
Add Department of Labor Wage Determinations. Since this is a service contract above $2,500.00 wage determination is required.
Update #2 ·
Defense Logistics Agency (DLA) Data ProductionsOperations seeks to procure services to remove and install a new
racking system:
- One time requirement that must be completed in 30 days after award.
- Remove 54 cross beams and stacking for later use.
- Remove 10 uprights in the warehouse and stack on provided pallet outside.
- Install 10 new uprights following all manufacturer guidelines within the same footprint of the old uprights.
- Install 72 cross beams mirroring the new setup that has already been established in row l of the warehouse.
- Install wire decking (shelving) on bottom 2 rows (36 total).
Amendment 00001:
The closing date of SP7000-24-Q-0014 is extended to 24 June 2024 at 14:00.
- What is the height of the uprights? 25 ft (H) x 4 ft (D)
- What is the length of the beams? 9 ft
- Is a scissor lift needed? Yes, scissor lift would be recommended.
- Is a forklift needed? Yes
- Will ladders be sufficient for installation? Scissor lift would be recommended due to the height of the racks.
- Do ladders, forklifts, and scissor lift need to be provided or are they on site to be used? They will need to be provided.
- What size are the old uprights? 25 ft (H) x 3 ½ ft (D)
- What size are the old beams? 9 ft
- What size are the new uprights? 25 ft (H) x 4 ft (D)
- How many shelf levels is each bay? 4
- How much weight does each shelf level need to hold? 1200 LBS
- Can you provide picture or layout of old system? See attached
- Can you provide picture or layout of new system? The new layout will mirror the previous layout.
- Does the offeror need to include procurement of new racking materials, or will it be provided? The new racking material has been purchased and is on-site (minus bolts for uprights to floor).
- Are there drawings and pictures of the work area available? See attached.
- What does the area look like? See attached.
- Are site visits available? Yes, we can schedule a site visit M-F from 0700 to 1400 CST.
- What size cross beams and uprights are required to be demolished? Uprights are 25 ft (H) x 3 ½ ft (D) and cross beams are 9 ft wide.
- What size uprights, cross beams, and wire decking are being installed? Uprights to be installed are 25 ft (H) x 4 ft (D). Same cross beams need to be installed.
- Will equipment be needed to demo and install? Yes
- What material is being installed and demolished? DLA material is to be taken down and installed.
- What are the manufacturer’s guidelines for installation? Uprights and cross beams have been purchased through Granger and Uline. The uprights were manufactured by Husky Rack and Wire
Update #1 ·
Defense Logistics Agency (DLA) Data ProductionsOperations seeks to procure services to remove and install a new
racking system:
- One time requirement that must be completed in 30 days after award.
- Remove 54 cross beams and stacking for later use.
- Remove 10 uprights in the warehouse and stack on provided pallet outside.
- Install 10 new uprights following all manufacturer guidelines within the same footprint of the old uprights.
- Install 72 cross beams mirroring the new setup that has already been established in row l of the warehouse.
- Install wire decking (shelving) on bottom 2 rows (36 total).
Attachments
| File | Type | Posted |
|---|---|---|
| SP7000-24-Q-0014 0002.pdf | ||
| SP7000-24-Q-0014 00001.pdf | ||
| Photo-2.jpg | JPG image | |
| Photo-1.jpg | JPG image | |
| Photo-10.jpg | JPG image | |
| Photo-4.jpg | JPG image | |
| Photo-7.jpg | JPG image | |
| Photo-9.jpg | JPG image | |
| Photo-11.jpg | JPG image | |
| Photo-5.jpg | JPG image | |
| Photo-8.jpg | JPG image | |
| Photo-12.jpg | JPG image | |
| Photo-3.jpg | JPG image | |
| Photo-6.jpg | JPG image | |
| Attachment 1 - Full Text Provisions (Vendor COMPLETION Required).pdf | ||
| Attachment 3 - Procurex Reverse Auction Instructions.pdf | ||
| SP7000-24-Q-0014.pdf | ||
| Attachment 2 - PERFORMANCE WORK STATEMENT.pdf |
Show all 18
Notice history
| Notice | Type | Posted |
|---|---|---|
| Assembly of Shelving Racks | Solicitation | |
| Assembly of Shelving Racks | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity