ARS Woodward Embankment Rehabilitation
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 12FPC322R0007
- Agency
-
Farm Production and Conservation
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Woodward, Oklahoma, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice seeks proposals to rehabilitate the ARS Field Station Dam owned by the Department of Agriculture Under Secretary for Farm Production and Conservation. The dam is classified as high hazard and must be upgraded to current standards. Proposals are sought to bore and install a new 30-inch principal spillway pipe, build a new principal spillway tower, construct a roller compacted concrete auxiliary spillway, and dispose of existing structures. Proposals are due approximately 30 days from issuance of solicitation number 12FPC3R0007 on or around February 18, 2022.
The opportunity is set aside for total small businesses. The NAICS code is 237990 for other heavy and civil engineering construction with a $39.5 million size standard. The estimated value is between $5-10 million. Work will include clearing, grubbing, and disposal to prepare the site. The dam maintains a 14.4 square mile drainage area for irrigation and recreation. Firms must be registered in SAM to be eligible for award, which is anticipated in March 2022.
Notice text
The North American Industrial Classification System code is 237990, which has a size standard of $39.5 million. A firm-fixed-price contract will be negotiated. The contract is anticipated to be awarded in March 2022. To be eligible for contract award, a firm must be registered with the System for Award Management (SAM) database. Register via the SAM Internet site at https://www.sam.gov/. No state level certifications will be accepted.
PROJECT INFORMATION: The estimated magnitude for this contract is between $5,000,000 and $10,000,000.
Rehabilitate the ARS Field Station Dam, this dam is a single purpose, high hazard, earthfill embankment constructed in 1937 with a drainage area of 14.4 square miles. The dam is not a floodwater retention structure, it is primarily used for irrigation and recreation. The site was reclassified as high hazard and must be rehabilitated to meet current high hazard criteria. The project will consist of boring and jacking a new 30” principal spillway pipe through the existing dam, building a new principal spillway tower, building a roller compacted concrete auxiliary spillway over the top of the existing dam, disposing of and filling in existing concrete auxiliary spillway – and includes clearing and grubbing and disposal of trees, snags, logs, brush, stumps, shrubs, and rubbish from designated areas.
The estimated solicitation issue date for solicitation 12FPC3R0007 is on or about 18 February 2022. Proposals are anticipated to be due approximately 30 days from issuance of the solicitation.
Notice history
| Notice | Type | Posted |
|---|---|---|
| ARS Woodward Embankment Rehabilitation | Award Notice | |
| ARS Woodward Embankment Rehabilitation | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Stove Prairie Campground Gate Replacement | Forest Service | Total Small Business | |
| MN fergus falls WMD prking rehab | — | Total Small Business | |
| HAVO 326181 Rehabilitate Rainshed&Water Treatment | National Office | No set-aside | |
| W9127N27BA005 Foster Spillway Gate Nut Replacements and Re-Tensioning | ENDIST Portland | Total Small Business | |
| White Horse Hill National Game Preserve Water Main Extension | — | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity