Apron Striping - Stratton Air National Guard Base

Closed Solicitation Posted

Solicitation number
W50S8J26QA015
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Schenectady, New York 12302, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army New York Army National Guard seeks apron striping services at Stratton Air National Guard Base in Schenectady, New York, with quotes due June 9, 2026. The procurement is 100% set-aside for small businesses and reserved for Women-Owned Small Business (WOSB) concerns, with a HUBZone price evaluation preference of 10% applied to non-HUBZone offers. A mandatory site visit is scheduled for May 28, 2026 at 1:00 PM.

Work scope includes removal of approximately 10,560 linear feet of existing pavement lines by grinding and application of 11,712 linear feet of yellow solid lines (towlines, centerlines, perimeter lines), 5,743 linear feet of yellow dashed lines (tip clearance), 150 linear feet of red and white striped lines (emergency control point markers), white apron boxes, and eight restricted area warning signs (3 feet by 4 feet each). Interior hangar striping includes 275 linear feet of restricted area red lines and 34 linear feet of candy cane ECP lines, applied with two-part epoxy compatible with existing floor coatings. The contractor must fabricate a custom stencil replicating the AFVA 31-107 design and turn it over upon completion. An optional line item covers application of TT-B-1325D Type I reflective media (glass beads) to exterior airfield markings. Exterior paint must meet military or FAA standards (Federal Specification TT-P-1952F or FAA AC 150/5370-10H Item P-620). Performance begins 14 days following Notice to Proceed and must be completed within 30 calendar days, with work hours 0700–1530 Monday through Friday. Prevailing wage rates per General Decision Number NY20260002 Modification 1 apply. The contractor must comply with base access and security policies, complete AT Level I and OPSEC training, provide Safety Data Sheets for all materials, and coordinate with the Contracting Officer's Representative on phasing to minimize impacts to flying operations. Evaluation criteria include technical capability, past performance, and price. Quotes are submitted via email to 109.aw.fal.msc.contracting@us.af.mil. The NAICS code is 237310, Highway, Street, and Bridge Construction; PSC is Z1BD, Maintenance Of Airport Runways And Taxiways. Amendment 0001 added provision 52.217-7 for optional increased quantities.

Notice text

3 versions

Update #3 · Latest ·

The purpose of this update is to provide additional clarification to Question 3 below which asked: "Custom stencils are required and turned in for future use, are there any for current use or is this a first?"

Updated Answer: A 15”x18” physical poster sign will be provided which is to be used as the basis for the stencil.

The purpose of this update is to answer questions which have been raised in response to the solicitation:

Q1: Are there FAA inspectors on site?

A1: No, there are not FAA inspectors on site.

Q2: What ist he current interior floor/ epoxy used?
A2: Epoxy over concrete.

Q3: Custom stencils are required and turned in for future use, are there any for current use or is this a first?

A3: There are no current stencils on-site.

Q4: WIll the facility be closed for the project duration?

A4: No, the facility will not be closed. See paragraph 5.6 of the SOW for coordination and phasing details.

- END Q&A -

A site visit will be held on Thursday May 28, 2026 at 1:00PM.

Submit quotes via email to 109.aw.fal.msc.contracting@us.af.mil

See attached solicitation documents for complete details.

Update #2 ·

The purpose of this update is to answer questions which have been raised in response to the solicitation:

Q1: Are there FAA inspectors on site?

A1: No, there are not FAA inspectors on site.

Q2: What ist he current interior floor/ epoxy used?
A2: Epoxy over concrete.

Q3: Custom stencils are required and turned in for future use, are there any for current use or is this a first?

A3: There are no current stencils on-site.

Q4: WIll the facility be closed for the project duration?

A4: No, the facility will not be closed. See paragraph 5.6 of the SOW for coordination and phasing details.

- END Q&A -

A site visit will be held on Thursday May 28, 2026 at 1:00PM.

Submit quotes via email to 109.aw.fal.msc.contracting@us.af.mil

See attached solicitation documents for complete details.

Update #1 ·

A site visit will be held on Thursday May 28, 2026 at 1:00PM.

Submit quotes via email to 109.aw.fal.msc.contracting@us.af.mil

See attached solicitation documents for complete details.

Files

File Type Posted
Solicitation Amendment W50S8J26QA0150001 SF 30.pdf PDF
Solicitation - W50S8J26QA015.pdf PDF
Wage Determination.txt TXT text file
Statement of Work.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity