The Architect of the Capitol seeks a health and safety audit of the US Capitol Power Plant utility tunnels covering the 2026–2030 period, with proposals due August 13, 2026. A mandatory site visit is scheduled for July 23, 2026 at 0900 hours at the Capitol Power Plant Administration Building, with tunnel entry at 0930 hours; pre-bid RFIs are due July 30.

Place of performance is Washington, DC. The audit must assess safety and health compliance to local, state, and federal regulations, identify all non-compliance areas, and document condition changes relative to past reports—including concrete spalling, delaminations, cracks, pipe insulation damage, and electrical conduit conditions. The report must address potential tunnel or pipe failure and include digital photographs. Work shall be completed under the direction of a Certified Industrial Hygienist and/or Safety Specialist and Mechanical and Electrical Engineer(s).

All contractor and subcontractor personnel entering the tunnels must submit certifications by July 20, 2026 at 2:00 PM EST: Asbestos Awareness Training (29 CFR 1910.1001 and 1926.1101), Permit-Required Confined Space Training (29 CFR 1910.146), Heat Stress Prevention Training, and government-issued ID. Contractors must provide personal protective equipment including hard hat, ANSI Z87.1-certified safety glasses, safety-toe boots, high-visibility vest, and cut-resistant gloves.

Primary NAICS is 541330 (Engineering Services); the Architect of the Capitol also accepts 541620 (Environmental Consulting Services), 541380 (Testing Laboratories and Services), and 541350 (Building Inspection Services). PSC is H947. Direct subcontractor contact with government representatives is prohibited; all communications must route through prime contractors.

Notice text

2 versions

Update #2 · Latest ·

The objective of the Audit is to inform US Capitol Power Plant (CPP) management regarding the current conditions and operational practices within the utility tunnels in terms of safety and health compliance to local, state, and federal regulations. The Audit shall identify and document all current areas of non-compliance. Findings shall address condition changes as related to past reports, new deterioration or safety concerns, and the probable cause. The report shall also identify if there is a potential for tunnel or pipe failure or other imminent concerns. The report shall also address noted changes in the condition of the tunnel as it relates to past reports or audits, including but not limited to the acceleration of concrete spalling de-laminations, cracks, damages to pipe insulation, and conditions of electrical conduits. The Audit Report shall contain digital photograph(s). Health and Safety Audits shall be completed under the direction of a Certified Industrial Hygienist and/or Safety Specialist, and Mechanical and Electrical Engineer(s).

In addition to the Primary NAICS Code 541330, the AOC is also accepting the following:

541620 – Environmental Consulting Services (industrial hygiene, asbestos/lead/mold assessment)

541380 – Testing Laboratories and Services (air quality, noise/PEL testing)

541350 – Building Inspection Services (egress, ladders, hatches, code compliance)

Update #1 ·

The objective of the Audit is to inform US Capitol Power Plant (CPP) management regarding the current conditions and operational practices within the utility tunnels in terms of safety and health compliance to local, state, and federal regulations. The Audit shall identify and document all current areas of non-compliance. Findings shall address condition changes as related to past reports, new deterioration or safety concerns, and the probable cause. The report shall also identify if there is a potential for tunnel or pipe failure or other imminent concerns. The report shall also address noted changes in the condition of the tunnel as it relates to past reports or audits, including but not limited to the acceleration of concrete spalling de-laminations, cracks, damages to pipe insulation, and conditions of electrical conduits. The Audit Report shall contain digital photograph(s). Health and Safety Audits shall be completed under the direction of a Certified Industrial Hygienist and/or Safety Specialist, and Mechanical and Electrical Engineer(s).

Files

File Type Posted
AOCACB26R0033 - 02.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity