American River Common Features 2016 Sacramento Weir Widening Yolo County, CA

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W9123823B0005
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks construction services for the American River Common Features 2016 Sacramento Weir Widening project in Yolo County, California. The U.S. Army Corps of Engineers, Sacramento District seeks to award a firm fixed-price contract to reduce water surface elevation in the Sacramento River and allow more water to flow into the Yolo Bypass system by constructing a 1,437-foot-long passive weir, 2,500 foot-long North Levee Setback, 1,515 foot-long Old River Road Bridge including approximately 15,000 linear feet of prestressed-precast bridge girders, realignment of roads and a railroad, demolition and rebuilding of levees, and a fish passage control structure. Bids were due by April 10, 2023 and will be evaluated for price and technical factors.

The solicitation carries no set-aside designations. Relevant NAICS codes include 237990 and 237310. Estimated quantities of work include approximately 400,000 CY of levee embankment fill, 1,000,000 CY of excavation, 38,000 cubic yards of structural concrete, and 1,500 each 20-inch concrete filled steel pipe piles totaling over 100,000 vertical feet supporting fish passage concrete features. Potential contractors include Granite Construction Company, Kiewit Infrastructure West Co., and Maloney-Odin Joint Venture. The place of performance is Yolo County, California and the period of performance is to be determined.

Notice text

5 versions

Update #5 · Latest ·

**The purpose of Amendment 0007 to Solicitation W9123823B0005 (which shows as Amendment 0008 in PIEE) is to make changes to SECTION 00 21 13 ? INSTRUCTIONS TO BIDDERS, paragraph V. Contractor Teaming Arrangements. ** The purpose of the Sacramento Weir Widening project is to reduce the water surface elevation in the Sacramento River and allow more water to flow into the Yolo Bypass system. The Sacramento Weir Widening project includes construction of the following major features:? 1,437-foot-long passive weir? 2,500 foot-long North Levee Setback? 1,515 foot-long Old River Road Bridge which includes approximately 15,000 length feet of prestressed-precast bridge girders? 1,635-foot-long Realignment of Old River Road and 2,445-foot-long realignment of County Road 126? 2,135-foot-long Railroad Embankment Removal, demolition of 2,880-foot-long existing Sacramento River Right Bank Levee, and demolition of 2,500-foot-long existing levee? Fish Passage Control Structure, including hybrid technical fishway (420 foot-long concrete- lined), fish passage channel structure (200 foot-long concrete-lined), Two 16-foot-wide flow control gates, and associated electrical, instrumentation, and automation; fishway exit (rock-line 230 foot-long); stilling basin drain; modifications to the stilling basin of the existing weir; 1,600 foot-long rock-lined Existing Stilling Basin Drain Channel; and 8,500 foot-long earthen Bypass Transport Channel. The Sacramento Weir Widening project includes the following quantities, some of which are noted in the major project features above.? Approximately 400,000 CY of levee embankment fill from on-site borrow sources? Approximately 1,000,000 CY of excavation throughout the project? Approximately 38,000 cubic yards of structural concrete? Approximately 1,500 each, 20-inch concrete filled steel pipe piles totaling over 100,000 vertical feet supporting the fish passage concrete features and weir? Erosion Protection in various locations including approximately 35,000 tons of rock slope protection, approximately 130,000 square-feet concrete slope protection, and approximately 90,000 cubic yards of tied concrete block mat

Update #4 ·

**The purpose of Amendment 0007 to Solicitation W9123823B0005 (which shows as Amendment 0008 in PIEE) is to make changes to SECTION 00 21 13 ? INSTRUCTIONS TO BIDDERS, paragraph V. Contractor Teaming Arrangements. ** The purpose of the Sacramento Weir Widening project is to reduce the water surface elevation in the Sacramento River and allow more water to flow into the Yolo Bypass system. The Sacramento Weir Widening project includes construction of the following major features:? 1,437-foot-long passive weir? 2,500 foot-long North Levee Setback? 1,515 foot-long Old River Road Bridge which includes approximately 15,000 length feet of prestressed-precast bridge girders? 1,635-foot-long Realignment of Old River Road and 2,445-foot-long realignment of County Road 126? 2,135-foot-long Railroad Embankment Removal, demolition of 2,880-foot-long existing Sacramento River Right Bank Levee, and demolition of 2,500-foot-long existing levee? Fish Passage Control Structure, including hybrid technical fishway (420 foot-long concrete- lined), fish passage channel structure (200 foot-long concrete-lined), Two 16-foot-wide flow control gates, and associated electrical, instrumentation, and automation; fishway exit (rock-line 230 foot-long); stilling basin drain; modifications to the stilling basin of the existing weir; 1,600 foot-long rock-lined Existing Stilling Basin Drain Channel; and 8,500 foot-long earthen Bypass Transport Channel. The Sacramento Weir Widening project includes the following quantities, some of which are noted in the major project features above.? Approximately 400,000 CY of levee embankment fill from on-site borrow sources? Approximately 1,000,000 CY of excavation throughout the project? Approximately 38,000 cubic yards of structural concrete? Approximately 1,500 each, 20-inch concrete filled steel pipe piles totaling over 100,000 vertical feet supporting the fish passage concrete features and weir? Erosion Protection in various locations including approximately 35,000 tons of rock slope protection, approximately 130,000 square-feet concrete slope protection, and approximately 90,000 cubic yards of tied concrete block mat

Update #3 ·

** The purpose of Amendment 0007 is administrative to align the PIEE Response Date / Time with the Date / Time found in Amendment 0006 to Solicitation W9123823B0005 (10 April 2023 / 11 AM PST). No changes have been made to the solicitation as a result of Amendment 0007. ** The purpose of the Sacramento Weir Widening project is to reduce the water surface elevation in the Sacramento River and allow more water to flow into the Yolo Bypass system. The Sacramento Weir Widening project includes construction of the following major features:? 1,437-foot-long passive weir? 2,500 foot-long North Levee Setback? 1,515 foot-long Old River Road Bridge which includes approximately 15,000 length feet of prestressed-precast bridge girders? 1,635-foot-long Realignment of Old River Road and 2,445-foot-long realignment of County Road 126? 2,135-foot-long Railroad Embankment Removal, demolition of 2,880-foot-long existing Sacramento River Right Bank Levee, and demolition of 2,500-foot-long existing levee? Fish Passage Control Structure, including hybrid technical fishway (420 foot-long concrete- lined), fish passage channel structure (200 foot-long concrete-lined), Two 16-foot-wide flow control gates, and associated electrical, instrumentation, and automation; fishway exit (rock-line 230 foot-long); stilling basin drain; modifications to the stilling basin of the existing weir; 1,600 foot-long rock-lined Existing Stilling Basin Drain Channel; and 8,500 foot-long earthen Bypass Transport Channel. The Sacramento Weir Widening project includes the following quantities, some of which are noted in the major project features above.? Approximately 400,000 CY of levee embankment fill from on-site borrow sources? Approximately 1,000,000 CY of excavation throughout the project? Approximately 38,000 cubic yards of structural concrete? Approximately 1,500 each, 20-inch concrete filled steel pipe piles totaling over 100,000 vertical feet supporting the fish passage concrete features and weir? Erosion Protection in various locations including approximately 35,000 tons of rock slope protection, approximately 130,000 square-feet concrete slope protection, and approximately 90,000 cubic yards of tied concrete block mat

Update #2 ·

The purpose of the Sacramento Weir Widening project is to reduce the water surface elevation in the Sacramento River and allow more water to flow into the Yolo Bypass system. The Sacramento Weir Widening project includes construction of the following major features:? 1,437-foot-long passive weir? 2,500 foot-long North Levee Setback? 1,515 foot-long Old River Road Bridge which includes approximately 15,000 length feet of prestressed-precast bridge girders? 1,635-foot-long Realignment of Old River Road and 2,445-foot-long realignment of County Road 126? 2,135-foot-long Railroad Embankment Removal, demolition of 2,880-foot-long existing Sacramento River Right Bank Levee, and demolition of 2,500-foot-long existing levee? Fish Passage Control Structure, including hybrid technical fishway (420 foot-long concrete- lined), fish passage channel structure (200 foot-long concrete-lined), Two 16-foot-wide flow control gates, and associated electrical, instrumentation, and automation; fishway exit (rock-line 230 foot-long); stilling basin drain; modifications to the stilling basin of the existing weir; 1,600 foot-long rock-lined Existing Stilling Basin Drain Channel; and 8,500 foot-long earthen Bypass Transport ChannelThe Sacramento Weir Widening project includes the following quantities, some of which are noted in the major project features above.? Approximately 400,000 CY of levee embankment fill from on-site borrow sources? Approximately 1,000,000 CY of excavation throughout the project? Approximately 38,000 cubic yards of structural concrete? Approximately 1,500 each, 20-inch concrete filled steel pipe piles totaling over 100,000 vertical feet supporting the fish passage concrete features and weir? Erosion Protection in various locations including approximately 35,000 tons of rock slope protection, approximately 130,000 square-feet concrete slope protection, and approximately 90,000 cubic yards of tied concrete block mat

Update #1 ·

The purpose of the Sacramento Weir Widening project is to reduce the water surface elevation in the Sacramento River and allow more water to flow into the Yolo Bypass system. The Sacramento Weir Widening project includes construction of the following major features:? 1,437-foot-long passive weir? 2,500 foot-long North Levee Setback? 1,515 foot-long Old River Road Bridge which includes approximately 15,000 length feet of prestressed-precast bridge girders? 1,635-foot-long Realignment of Old River Road and 2,445-foot-long realignment of County Road 126? 2,135-foot-long Railroad Embankment Removal, demolition of 2,880-foot-long existing Sacramento River Right Bank Levee, and demolition of 2,500-foot-long existing levee? Fish Passage Control Structure, including hybrid technical fishway (420 foot-long concrete- lined), fish passage channel structure (200 foot-long concrete-lined), Two 16-foot-wide flow control gates, and associated electrical, instrumentation, and automation; fishway exit (rock-line 230 foot-long); stilling basin drain; modifications to the stilling basin of the existing weir; 1,600 foot-long rock-lined Existing Stilling Basin Drain Channel; and 8,500 foot-long earthen Bypass Transport ChannelThe Sacramento Weir Widening project includes the following quantities, some of which are noted in the major project features above.? Approximately 400,000 CY of levee embankment fill from on-site borrow sources? Approximately 1,000,000 CY of excavation throughout the project? Approximately 38,000 cubic yards of structural concrete? Approximately 1,500 each, 20-inch concrete filled steel pipe piles totaling over 100,000 vertical feet supporting the fish passage concrete features and weir? Erosion Protection in various locations including approximately 35,000 tons of rock slope protection, approximately 130,000 square-feet concrete slope protection, and approximately 90,000 cubic yards of tied concrete block mat

Files

Show all 11

Notice history

Notice Type Posted
American River Common Features 2016 Sacramento Weir Widening Yolo County, CA Award Award Notice
This notice Latest solicitation Solicitation
American River Common Features 2016, Sacramento Weir Widening Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CA Sacramento, California 95837 · NAICS 237990 ENDIST Sacramento No set-aside
$465M SPK small business MATOC for DBB/DB construction Usace Sacramento District 1325 J Street Sacramento, CA 95814 95814 · NAICS 236220 ENDIST Sacramento Total Small Business
New Orleans Harbor and Various Bar Channels Cutterhead Dredge 3-2025 New Orleans, Louisiana, United States · NAICS 237990 ENDIST New Orleans No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors