All-Purpose Personal Protective Equipment Modernization (AP-PPE Mod) ensembles
Closed Solicitation Posted
- Solicitation number
- W911QY25RA017
- Agency
- ACC Aberdeen Proving Ground Army Contracting Command, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 315210 Cut and Sew Apparel Contractors
- PSC
- 8415 Clothing, Special Purpose
- Place of performance
- Natick, Massachusetts, United States
- Points of contact
-
- Christine Halamoutis christine.m.halamoutis.civ@army.mil (508) 771-8571
- Andrew Richard andrew.j.richard12.civ@army.mil
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Contracting Command - Aberdeen Proving Ground, Natick Division is soliciting proposals for the production, packaging, and delivery of All-Purpose Personal Protective Equipment Modernization (AP-PPE Mod) ensembles for the Joint Program Manager for Chemical, Biological, Radiological, and Nuclear Special Operations Forces. The contractor will perform cut and sew operations using government-furnished materials from W.L. Gore & Associates to produce chemical/biological protective overgarments with attached hoods designed to provide protection against chemical warfare agents for up to 24 hours. A mandatory requirement is that the selected vendor or their subcontractor must obtain current certification from W.L. Gore demonstrating they have met all necessary training requirements to work with the specialized materials. Proposals will be evaluated using a best-value approach based on four factors in order of importance: Technical (Cut & Sew Manufacturing), Quality, Past Performance, and Cost/Price, with technical factors being most important. The current proposal submission deadline is August 8, 2025, at 12:00 PM Eastern Time, with questions due by July 31, 2025.
This procurement is designated as a 100% small business set-aside under NAICS code 315210 with a size standard of 750 employees, structured as a hybrid, single-award indefinite-delivery/indefinite-quantity (IDIQ) contract with firm-fixed pricing. The contract will produce up to 26,000 AP-PPE Mod ensembles across multiple sizes (X-Small to XX-Large in short, regular, and tall variations) over a five-year anticipated ordering period from September 2025 through December 2030. The minimum contract value is established at $150, though no maximum value is specified in the available documentation. The contractor must demonstrate capability to produce between 1,000 to 5,500 integrated protective systems every 90 days during surge requirements and maintain ISO 9001 Quality Management System certification. Performance will take place at the contractor's facility, with first article testing requiring delivery of twelve garments (one of each size configuration) to the US Army DEVCOM Chemical Biological Center within 60 calendar days of contract award.
Notice text
6 versions
Update #6 · Latest ·
The U.S. Army Contracting Command – Aberdeen Proving Ground, Natick Division has a requirement from JPM CBRN SOF for the production (cut and sew), packaging and delivery of up to 26,000 AP-PPE Mod ensembles of various sizes and utilizing a government-developed SOW along with government-furnished base material as Government-Furnished Material (GFM). The selected vendor for the contract or their subcontractor performing the cut and sew must be able to provide certification from W. L. Gore, that it has met all necessary training requirements to be able to work with the Gore materials to be used for this cut and sew requirement.
**All question must be submitted on or before July 22, 2025**
*** Revised questions due by July 29, 2025**
***17 July 2025 A formal amendment will be posted - Attachment 0001 Statement of Work has been updated and includes packaging and marking requirments.***
***21JUL2025 Question and Answers have been posted as Attachment 0004***
****22JUL2025 Amendment to extend Soliciatation due date and revised files****
**06AUG2025 Amendment to add governments option to use AI in the evaluations and extend the RFP due date**
Update #5 ·
The U.S. Army Contracting Command – Aberdeen Proving Ground, Natick Division has a requirement from JPM CBRN SOF for the production (cut and sew), packaging and delivery of up to 26,000 AP-PPE Mod ensembles of various sizes and utilizing a government-developed SOW along with government-furnished base material as Government-Furnished Material (GFM). The selected vendor for the contract or their subcontractor performing the cut and sew must be able to provide certification from W. L. Gore, that it has met all necessary training requirements to be able to work with the Gore materials to be used for this cut and sew requirement.
**All question must be submitted on or before July 22, 2025**
*** Revised questions due by July 29, 2025**
***17 July 2025 A formal amendment will be posted - Attachment 0001 Statement of Work has been updated and includes packaging and marking requirments.***
***21JUL2025 Question and Answers have been posted as Attachment 0004***
****22JUL2025 Amendment to extend Soliciatation due date and revised files****
Update #4 ·
The U.S. Army Contracting Command – Aberdeen Proving Ground, Natick Division has a requirement from JPM CBRN SOF for the production (cut and sew), packaging and delivery of up to 26,000 AP-PPE Mod ensembles of various sizes and utilizing a government-developed SOW along with government-furnished base material as Government-Furnished Material (GFM). The selected vendor for the contract or their subcontractor performing the cut and sew must be able to provide certification from W. L. Gore, that it has met all necessary training requirements to be able to work with the Gore materials to be used for this cut and sew requirement.
**All question must be submitted on or before July 22, 2025**
***17 July 2025 A formal amendment will be posted - Attachment 0001 Statement of Work has been updated and includes packaging and marking requirments.***
***21JUL2025 Question and Answers have been posted as Attachment 0004***
Update #3 ·
The U.S. Army Contracting Command – Aberdeen Proving Ground, Natick Division has a requirement from JPM CBRN SOF for the production (cut and sew), packaging and delivery of up to 26,000 AP-PPE Mod ensembles of various sizes and utilizing a government-developed SOW along with government-furnished base material as Government-Furnished Material (GFM). The selected vendor for the contract or their subcontractor performing the cut and sew must be able to provide certification from W. L. Gore, that it has met all necessary training requirements to be able to work with the Gore materials to be used for this cut and sew requirement.
**All question must be submitted on or before July 22, 2025**
***17 July 2025 A formal amendment will be posted - Attachment 0001 Statement of Work has been updated and includes packaging and marking requirments.***
Update #2 ·
The U.S. Army Contracting Command – Aberdeen Proving Ground, Natick Division has a requirement from JPM CBRN SOF for the production (cut and sew), packaging and delivery of up to 26,000 AP-PPE Mod ensembles of various sizes and utilizing a government-developed SOW along with government-furnished base material as Government-Furnished Material (GFM). The selected vendor for the contract or their subcontractor performing the cut and sew must be able to provide certification from W. L. Gore, that it has met all necessary training requirements to be able to work with the Gore materials to be used for this cut and sew requirement.
**All question must be submitted on or before July 22, 2025**
Update #1 ·
The U.S. Army Contracting Command – Aberdeen Proving Ground, Natick Division has a requirement from JPM CBRN SOF for the production (cut and sew), packaging and delivery of up to 26,000 AP-PPE Mod ensembles of various sizes and utilizing a government-developed SOW along with government-furnished base material as Government-Furnished Material (GFM). The selected vendor for the contract or their subcontractor performing the cut and sew must be able to provide certification from W. L. Gore, that it has met all necessary training requirements to be able to work with the Gore materials to be used for this cut and sew requirement.
Attachments
Show all 17
Notice history
| Notice | Type | Posted |
|---|---|---|
| All-Purpose Personal Protective Equipment Modernization (AP-PPE Mod) ensembles | Solicitation | |
| All-Purpose Personal Protective Equipment Modernization (AP-PPE Mod) ensembles | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity