Airport Surveillance Radar (ASR) Modernization: Antenna Control Box (ACB) Market Survey Announcement
Closed Pre-Solicitation Posted
- Solicitation number
- ACB-01-2026
- Agency
-
Enroute Terminal Contracts
Federal Aviation Administration, Department of Transportation
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 335314 Relay and Industrial Control Manufacturing
- PSC
- Not on record
- Place of performance
- Washington, District of Columbia, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Aviation Administration is conducting a market survey to identify qualified manufacturers capable of producing Antenna Control Box (ACB) units as part of its Airport Surveillance Radar modernization initiative. The survey seeks companies with demonstrated capabilities to manufacture, assemble, and test universal ACB solutions that will interface with multiple radar system configurations (ASR-8, ASR-9, and ASR-11) across the National Airspace System. Respondents must demonstrate the ability to provide all necessary labor, materials, equipment, tooling, and technical expertise to comply with government specifications, which are provided on a build-to-print basis with no expectation of vendor-led engineering modifications. The government will evaluate responses based on the existence of viable competition, the qualifications and capabilities of potential sources, and the participation potential of small businesses, service-disabled veteran-owned small businesses, and socially and economically disadvantaged businesses certified under the SBA's 8(a) Program. The market survey deadline for responses is January 30, 2026, with an updated response matrix containing FAA answers to industry questions released on January 26, 2026.
This procurement involves no set-aside designation and does not identify any current contractors or incumbents. The survey does not specify an award value or budget range, nor does it indicate the ultimate quantity of ACB units to be procured, as this is a preliminary market assessment phase rather than a formal solicitation. Respondents must submit Rough Order of Magnitude pricing estimates that encompass complete manufacturing labor, factory testing, delivery, and all material costs. Technical specifications are detailed in the Universal Pedestal Electronic Control Requirements Specification and supporting appendices covering parts lists, assembly instructions, software loading procedures, and detailed technical drawings. The FAA has clarified that all ACB units must be newly manufactured, the government will retain design ownership with no post-award support contracts for repairs or training, and the new units will remain functional after implementation of the Brand New Air Traffic Control System modernization.
Notice text
2 versions
Update #2 · Latest ·
Update 01/26/26
The announcement is updated to provide answers to industry questions under Attachment 8 - Market Survey Comments and Questions Matrix - FAA Responses.
======================================
This Market Survey announcement is issued in accordance with Federal Aviation Administration (FAA) Acquisition Management System (AMS) 3.2.1.2.1.
1. Introduction
The Government is conducting a market survey to assess:
- The existence of viable competition by interested industry participants;
- Qualified and capable sources that can satisfy Government requirements. Specifically, to identify companies that possess the capabilities to meet Government requirements to manufacture, assemble, and test the Antenna Control Box (ACB). Respondents will need to show the capability to furnish all required labor, plant, materials, fixtures, equipment, tools, test equipment, technical data/technical and management expertise, and all other facilities necessary in support of their product that fully comply with Government requirements; and
- The potential for participation by small business (SB), service-disabled veteran-owned small businesses (SDVOSB), and eligible socially and economically disadvantaged businesses (SEDB) certified by the Small Business Administration (SBA) for participation in the SBA's 8(a) Program.
2. Background
The Federal Aviation Administration (FAA) has multiple terminal radar systems across the country that require replacement of the antenna control interface. The antenna system supports continuous control of air traffic operations throughout the National Airspace System. This change is due to significant future upgrades to radar facilities as part of the FAA’s radar modernization initiative. As a result of the modernization efforts, legacy ACBs will not directly interface with the Brand New Air Traffic Control System without the new ACB units. Currently, each facility requires one ACB to control the antenna system and monitoring. The FAA will implement a universal ACB solution that will interface with all antenna radar systems regardless of the transmitter and receiver subsystem components.
3. Scope
Respondents must have the capability to procure, assemble, test, and produce 280 ACB enclosures in accordance with the Parts List (Attachment 3), Assembly Instructions (Attachment 4), Software Loading Instructions (Attachment 5), and Drawings (Attachment 6). Further guidance related to factory acceptance test procedures and government furnished equipment will be provided upon issuance of a Screening Information Request (SIR).
The estimated period of performance is two years.
4. Nature of Competition
The acquisition strategy has not been determined at this time. The Government intends to review all responses received to establish the acquisition strategy and determine the viability for unrestricted competition. The Government encourages all interested sources to respond to this market survey.
5. Disclaimer
Respondents are hereby advised that:
- This is not a SIR or Request for Proposals (RFP) of any kind;
- The Government is not seeking or accepting unsolicited proposals;
- The Government will not pay for any information received or costs incurred in preparing the response to the market survey;
- Any costs associated with the market survey submittal are solely at the interested Respondent’s expense;
- Any information provided in response to this market survey will be used for Government informational purposes only; and
- Any proprietary information submitted in response to this market survey must be clearly identified and appropriately marked.
6. North American Industry Classification System (NAICS) Code
The applicable NAICS codes for this procurement are:
- 335314 – Relay and Industrial Control Manufacturing
- 334511 – Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
- 334290 – Other Communications Equipment Manufacturing
- 335311 – Power, Distribution, and Specialty Transformer Manufacturing
- 334519 – Other Measuring and Controlling Device Manufacturing
- 335999 – All Other Miscellaneous Electrical Equipment and Component Manufacturing
- 334513 – Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables
7. Submittal Requirements for Market Survey
The Respondent’s response to this market survey must address the physical, technical, functional, and performance requirements for the ACB as part of the radar modernization initiative.
Respondents must describe the capabilities and resources available and clearly demonstrate that the respondent is qualified and capable of providing a solution. Interested respondents are required to respond to the following questions:
- Does the Respondent have experience performing under Governmentcontracts and/or FAA contracts? If so, describe the nature of such experience and identify the Government/FAA program name, contract number, and period of performance.
- Provide a description of technical expertise and experience with the procurement, assembly, and testing of electro-mechanical systems/subsystems comparable to the ACB.
- Provide a description of the capabilities and resources available to support the procurement, assembly, and testing of the ACB as part of the Respondent’s approach to providing a first article (pre-production sample) and production unit deliverables.
- Provide examples of direct experience in machine controls systems including procurement, assembly, and testing.
- Describe the Respondent’s inventory control program. How does the Respondent identify suitable sources of supply, prevent the use of counterfeit parts, verify suitability of selected components to support function and performance parameters? Additionally, describe the Respondent’s approach for ensuring accountability of Government Furnished Equipment (See Attachment 3).
- Describe the Respondent’s approach for supply chain management particularly addressing identification of long-lead time, hard to source components, and lifecycle maintenance and sparing needs.
- Does the Respondent have a fully implemented Quality Assurance Plan? What is the Quality Assurance Plan in use by the Respondent? Has the Respondent been certified as compliant to ISO 9001 and what version?
- Describe the Respondent’s approach to support continuity testing and capability to provide documentation for each unit of the ACB.
- Provide a Rough Order of Magnitude (ROM) for labor and shipping costs associated with first article unit(s) and production units. The ROM will be used for Government planning purposes only.
- Identify any warranty policies in workmanship and quantity discounts offered.
8. Delivery of Submittals
Refer to the below applicable due dates for this market survey:
Respondents submit questions/comments:
January 16, 2026 by 5:00PM EST
Government posts response to comments and/or questions on the sam.gov website:
January 26, 2026 by 5:00PM EST
Respondents submit response to market survey with completed business declaration form:
January 30, 2026 by 5:00PM EST
Submit written questions and/or comments and market survey responses via email to Patrick.Weare@faa.gov and Malie.P.Chhang@faa.gov. Questions and/or comments must be limited to aspects of this announcement that affect the preparation of the market survey response. Comments on the market survey are not considered part of the capability statement. Please also note the following:
- Interested respondents must use the Market Survey Comments and Questions Matrix to submit comments or questions on the market survey.
- A completed FAA Business Declaration form must be submitted in *.pdf format.
Responses to this market survey must be in PDF format in Times New Roman 12 Font. Please limit company background information to one page.
- The Government will not release or distribute any of the information contained in the market survey responses. However, respondents must identify and clearly mark any proprietary information contained in their submissions.
- No electronic or telephone inquiries will be accepted. It is the responsibility of the interested respondent to monitor the sam.gov website for questions and responses posted by the Government.
9. Attachments
- Attachment 1 - Business Declaration Form
- Attachment 2 - Market Survey Comments and Questions Matrix
- Attachment 3 - Appendix A Parts List Rev 2.1
- Attachment 4 - Appendix B Assembly Instructions Rev2
- Attachment 5 - Appendix C Software Loading Instructions Rev 2
- Attachment 6 - Appendix D Drawings Rev 2
- Attachment 7 - ASR-8-2026-000580-UPEC_A_Requirements_Specification_REV 4.0 Signed 11.3.25
Update #1 ·
This Market Survey announcement is issued in accordance with Federal Aviation Administration (FAA) Acquisition Management System (AMS) 3.2.1.2.1.
1. Introduction
The Government is conducting a market survey to assess:
- The existence of viable competition by interested industry participants;
- Qualified and capable sources that can satisfy Government requirements. Specifically, to identify companies that possess the capabilities to meet Government requirements to manufacture, assemble, and test the Antenna Control Box (ACB). Respondents will need to show the capability to furnish all required labor, plant, materials, fixtures, equipment, tools, test equipment, technical data/technical and management expertise, and all other facilities necessary in support of their product that fully comply with Government requirements; and
- The potential for participation by small business (SB), service-disabled veteran-owned small businesses (SDVOSB), and eligible socially and economically disadvantaged businesses (SEDB) certified by the Small Business Administration (SBA) for participation in the SBA's 8(a) Program.
2. Background
The Federal Aviation Administration (FAA) has multiple terminal radar systems across the country that require replacement of the antenna control interface. The antenna system supports continuous control of air traffic operations throughout the National Airspace System. This change is due to significant future upgrades to radar facilities as part of the FAA’s radar modernization initiative. As a result of the modernization efforts, legacy ACBs will not directly interface with the Brand New Air Traffic Control System without the new ACB units. Currently, each facility requires one ACB to control the antenna system and monitoring. The FAA will implement a universal ACB solution that will interface with all antenna radar systems regardless of the transmitter and receiver subsystem components.
3. Scope
Respondents must have the capability to procure, assemble, test, and produce 280 ACB enclosures in accordance with the Parts List (Attachment 3), Assembly Instructions (Attachment 4), Software Loading Instructions (Attachment 5), and Drawings (Attachment 6). Further guidance related to factory acceptance test procedures and government furnished equipment will be provided upon issuance of a Screening Information Request (SIR).
The estimated period of performance is two years.
4. Nature of Competition
The acquisition strategy has not been determined at this time. The Government intends to review all responses received to establish the acquisition strategy and determine the viability for unrestricted competition. The Government encourages all interested sources to respond to this market survey.
5. Disclaimer
Respondents are hereby advised that:
- This is not a SIR or Request for Proposals (RFP) of any kind;
- The Government is not seeking or accepting unsolicited proposals;
- The Government will not pay for any information received or costs incurred in preparing the response to the market survey;
- Any costs associated with the market survey submittal are solely at the interested Respondent’s expense;
- Any information provided in response to this market survey will be used for Government informational purposes only; and
- Any proprietary information submitted in response to this market survey must be clearly identified and appropriately marked.
6. North American Industry Classification System (NAICS) Code
The applicable NAICS codes for this procurement are:
- 335314 – Relay and Industrial Control Manufacturing
- 334511 – Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
- 334290 – Other Communications Equipment Manufacturing
- 335311 – Power, Distribution, and Specialty Transformer Manufacturing
- 334519 – Other Measuring and Controlling Device Manufacturing
- 335999 – All Other Miscellaneous Electrical Equipment and Component Manufacturing
- 334513 – Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables
7. Submittal Requirements for Market Survey
The Respondent’s response to this market survey must address the physical, technical, functional, and performance requirements for the ACB as part of the radar modernization initiative.
Respondents must describe the capabilities and resources available and clearly demonstrate that the respondent is qualified and capable of providing a solution. Interested respondents are required to respond to the following questions:
- Does the Respondent have experience performing under Governmentcontracts and/or FAA contracts? If so, describe the nature of such experience and identify the Government/FAA program name, contract number, and period of performance.
- Provide a description of technical expertise and experience with the procurement, assembly, and testing of electro-mechanical systems/subsystems comparable to the ACB.
- Provide a description of the capabilities and resources available to support the procurement, assembly, and testing of the ACB as part of the Respondent’s approach to providing a first article (pre-production sample) and production unit deliverables.
- Provide examples of direct experience in machine controls systems including procurement, assembly, and testing.
- Describe the Respondent’s inventory control program. How does the Respondent identify suitable sources of supply, prevent the use of counterfeit parts, verify suitability of selected components to support function and performance parameters? Additionally, describe the Respondent’s approach for ensuring accountability of Government Furnished Equipment (See Attachment 3).
- Describe the Respondent’s approach for supply chain management particularly addressing identification of long-lead time, hard to source components, and lifecycle maintenance and sparing needs.
- Does the Respondent have a fully implemented Quality Assurance Plan? What is the Quality Assurance Plan in use by the Respondent? Has the Respondent been certified as compliant to ISO 9001 and what version?
- Describe the Respondent’s approach to support continuity testing and capability to provide documentation for each unit of the ACB.
- Provide a Rough Order of Magnitude (ROM) for labor and shipping costs associated with first article unit(s) and production units. The ROM will be used for Government planning purposes only.
- Identify any warranty policies in workmanship and quantity discounts offered.
8. Delivery of Submittals
Refer to the below applicable due dates for this market survey:
Respondents submit questions/comments:
January 16, 2026 by 5:00PM EST
Government posts response to comments and/or questions on the sam.gov website:
January 26, 2026 by 5:00PM EST
Respondents submit response to market survey with completed business declaration form:
January 30, 2026 by 5:00PM EST
Submit written questions and/or comments and market survey responses via email to Patrick.Weare@faa.gov and Malie.P.Chhang@faa.gov. Questions and/or comments must be limited to aspects of this announcement that affect the preparation of the market survey response. Comments on the market survey are not considered part of the capability statement. Please also note the following:
- Interested respondents must use the Market Survey Comments and Questions Matrix to submit comments or questions on the market survey.
- A completed FAA Business Declaration form must be submitted in *.pdf format.
Responses to this market survey must be in PDF format in Times New Roman 12 Font. Please limit company background information to one page.
- The Government will not release or distribute any of the information contained in the market survey responses. However, respondents must identify and clearly mark any proprietary information contained in their submissions.
- No electronic or telephone inquiries will be accepted. It is the responsibility of the interested respondent to monitor the sam.gov website for questions and responses posted by the Government.
9. Attachments
- Attachment 1 - Business Declaration Form
- Attachment 2 - Market Survey Comments and Questions Matrix
- Attachment 3 - Appendix A Parts List Rev 2.1
- Attachment 4 - Appendix B Assembly Instructions Rev2
- Attachment 5 - Appendix C Software Loading Instructions Rev 2
- Attachment 6 - Appendix D Drawings Rev 2
- Attachment 7 - ASR-8-2026-000580-UPEC_A_Requirements_Specification_REV 4.0 Signed 11.3.25
Files
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Radio Frequency Calibration Backplane Assembly (RFCBA) | Air Force | No set-aside | |
| Digital Backplane Assembly | Air Force | No set-aside | |
| Receive Microwave (And Associated Power Supplies) | Air Force | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity