Aircraft Coatings and Sealants OO-ALC
Closed Solicitation Posted
- Solicitation number
- FA822427R0002
- Agency
-
Air Force Sustainment Center
Air Force Materiel Command, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 325510 Paint and Coating Manufacturing
- Place of performance
- Hill AFB, Utah Hill Air Force Base, Utah 84056, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Air Force Sustainment Center, through Ogden Air Logistics Complex (OO-ALC) at Hill Air Force Base, Utah, seeks offers for a firm-fixed-price IDIQ contract for comprehensive management and supply of aircraft coatings and sealants, with proposals due November 19, 2026. The procurement is a Total Small Business set-aside.
Performance is at 7981 Georgia St, Hill AFB, UT 84056. The contractor must meet a four-hour delivery timeline for urgent requirements, transit premixed frozen material at -80F, and deliver all products with a minimum of 85% shelf life. The contractor also manages FMS-3600 under an ITAR-compliant lock-and-key storage system with rigorous chain of custody, and provides technical assistance with one-business-day response to material failures, on-site support at monthly visits, product change support, and quality audit reporting. A secure, web-based ordering system with real-time lead-time and minimum-stock visibility is required. Full performance readiness is required within eight months of award.
Offerors must demonstrate at least two DoD contracts within the past five years, with each contract independently demonstrating coatings and sealants supply, delivery fulfillment, temperature-controlled and premixed-frozen material handling, and methods to maintain 85% shelf life. Subcontractor experience counts if the subcontractor performed the qualifying work and will perform the same aspects on this contract. IDIQ contracts and BPAs count as single contracts regardless of associated orders.
The ramp-up period runs February 15, 2027 through October 14, 2027, the ordering period runs October 15, 2027 through October 14, 2032, and the final delivery and technical assistance period runs through April 14, 2033. The Q&A documents state a minimum guarantee of $1,000 and a maximum of $90 million.
Offerors must price only products exactly as listed in Appendix D. Substitute products may be proposed post-award, subject to engineering review and testing. The pricing matrix Q&A dated November 4, 2026 approves PPG CA-series products, NCP Coatings P/N N-9398A, and Hentzen products qualified to MIL-PRF-85285 as replacements for discontinued PPG DEFT 03-series products. The Total Evaluated Price calculation appears in cell R383 of the pricing matrix. The Personnel Management Plan and Quality Program Plan are due 30 days after award, not at proposal submission. The latest Q&A (V4, posted November 16, 2026) updates the technical assistance CLIN end date to April 14, 2033.
The NAICS code is 325510, Paint and Coating Manufacturing, and the PSC is 8010.
Notice text
11 versions
Update #11 · Latest ·
The Ogden Air Logistics Complex (OO-ALC) at Hill Air Force Base, Utah, has a need to contract for comprehensive management and supply of aircraft coatings and sealants. This effort aims to ensure uninterrupted aircraft maintenance operations through robust inventory management, timely delivery, and technical support. This effort will include frequent ordering and quick delivery of specified items. The selected contractor will be responsible for continuous deliveries and support of Coatings and Sealants, including:
1. Order Fulfillment and Material Handling: Sourcing, storing, and delivering all required coatings and sealants (see attached list). This includes meeting a strict four (4) hour delivery timeline for urgent requirements and handling specialized materials, such as Premixed Frozen Material (PFM) requiring transit at -80F. The contractor must maintain a minimum of 85% shelf life for all products upon delivery. The contractor will also be responsible for managing shelf-life and ensuring proper storage and handling of the products prior to delivery.
2. FMS-3600 Coating Management: For this specialized product, implementing a lock and key ITAR-compliant storage system and maintaining rigorous chain of custody for the material.
3. Technical Assistance: Providing technical assistance that includes rapid response (within one business day) to material failures, on-site technical support during monthly visits, product change support, and quality audit reporting.
4. Online Ordering System: Furnishing a secure, web-based ordering and tracking system with real-time visibility of lead times and minimum stock levels (MSLS).
5. Ramp-Up Plan: Executing a ramp-up plan to achieve full performance readiness within eight (8) months of contract award.
The anticipated contract will be a Firm Fixed Priced (FFP) IDIQ to include an 8-month ramp up period, a 5-year ordering period, and a 6-month allowance for remaining deliveries on the back end. Total period of performance is anticipated to be 6 years and 2 months. This is a total small business set-aside. The Government anticipates awarding a single contract. All interested small businesses are encouraged to respond to this solicitation. The Government intends to award a single contract resulting from the solicitation to the responsible offeror whose proposal represents the best value to the Government.
This effort requires Contractors to be CMMC level 2 self-certified, therefore if you are not currently level 2 certified and are interested in this requirement you will need to begin the process to become level 2 certified immediately.
Contract period of performance dates on the solicitation are estimates and are subject to change according to when the effort gets awarded.
Please review and submit any questions related to this solicitation through the PIEE module link found down in the attachments section by October 19th. These questions and answers will be public. QandA will be closed after October 19th.
*Proposals shall be submitted through the solicitation module in PIEE. See the PIEE submittal instructions for directions on submitting proposal documents in PIEE.
*The attachments for this solicitation can be found by clicking the PIEE link found below in the attachments section. The link will take you to the PIEE Module. The PIEE module lists the amended attachments only on the front page. To find the original attachments you need to click on the solicitation number in the Update/Notice section at the bottom. If an amended version of a document does not exist, then the original copy is the current valid copy of the attachment.
Any extensions to this solicitation will be posted here. Solicitation FA822427R0002 was amended to correct the due date to be Nov 3rd, 2026 by 3:00PM Mountain Time. Please refer to the most updated version of the solicitation FA822427R0002. Located in PIEE
Oct 9th Update Q&A V1 posted with updated questions and answers from industry. FA822427R0002 amendment 0002 posted, see solicitation amendment 0002 for details.
A Q&A attachment is posted here. The rest of the solicitation attachments are found by following the PIEE link below.
Oct 15th Update - Q&A Attachment updated to add a question and answer
Oct 29th Update - The solicitation closing date has been extended to Nov 10th at 3:00PM Mountain Time. The solicitation amendment FA822427R00020003 to extend the date has been posted in PIEE. Also, additional responses to Contractor questions are expected to be posted on November 2nd or 3rd.
Nov 5th Update – The solicitation closing date has been extended to Nov 17th at 3:00PM Mountain Time. The Pricing Matrix has been updated to adjust product descriptions and details as needed for 57 items highlighted in yellow, please download through the PIEE link. A minor update to the 52.212-1 Addendum has been made to add in Technical subfactor 5 to the table of contents, download through the PIEE link update 0003. The QandA attachment has been updated along with many product questions and responses, see Q&A attachments below in the attachment section.
If you have issues submitting your proposal through the PIEE solicitation module, please reach out to the contacts listed on this posting as soon as possible. Make sure to review all solicitation updated and attachments found using the PIEE link below.
Nov 16th update – Amendment 0005 has been posted. This amendment updates the pricing matrix to fix formulas in several cells that were incorrect causing totals to be incorrect. The solicitation is also extended by a day from 17 Nov to 18 Nov by 3:00PM Mountain Time. The Q&A attachment has been updated to respond to one new question.
Nov 17th update – Amendment 0006 has been posted. This amendment updates the pricing matrix once again to fix incorrect formulas in cells P72, P76, P77, and P78. The solicitation is also extended by a day from 18 Nov to 19 Nov by 3:00PM Mountain Time. Thanks for your patience. Please submit the updated pricing matrix with your proposal.
Before submitting your proposal through the PIEE solicitation module make sure you have viewed all the solicitation updates amendments 0002-0006.
Update #10 ·
The Ogden Air Logistics Complex (OO-ALC) at Hill Air Force Base, Utah, has a need to contract for comprehensive management and supply of aircraft coatings and sealants. This effort aims to ensure uninterrupted aircraft maintenance operations through robust inventory management, timely delivery, and technical support. This effort will include frequent ordering and quick delivery of specified items. The selected contractor will be responsible for continuous deliveries and support of Coatings and Sealants, including:
1. Order Fulfillment and Material Handling: Sourcing, storing, and delivering all required coatings and sealants (see attached list). This includes meeting a strict four (4) hour delivery timeline for urgent requirements and handling specialized materials, such as Premixed Frozen Material (PFM) requiring transit at -80F. The contractor must maintain a minimum of 85% shelf life for all products upon delivery. The contractor will also be responsible for managing shelf-life and ensuring proper storage and handling of the products prior to delivery.
2. FMS-3600 Coating Management: For this specialized product, implementing a lock and key ITAR-compliant storage system and maintaining rigorous chain of custody for the material.
3. Technical Assistance: Providing technical assistance that includes rapid response (within one business day) to material failures, on-site technical support during monthly visits, product change support, and quality audit reporting.
4. Online Ordering System: Furnishing a secure, web-based ordering and tracking system with real-time visibility of lead times and minimum stock levels (MSLS).
5. Ramp-Up Plan: Executing a ramp-up plan to achieve full performance readiness within eight (8) months of contract award.
The anticipated contract will be a Firm Fixed Priced (FFP) IDIQ to include an 8-month ramp up period, a 5-year ordering period, and a 6-month allowance for remaining deliveries on the back end. Total period of performance is anticipated to be 6 years and 2 months. This is a total small business set-aside. The Government anticipates awarding a single contract. All interested small businesses are encouraged to respond to this solicitation. The Government intends to award a single contract resulting from the solicitation to the responsible offeror whose proposal represents the best value to the Government.
This effort requires Contractors to be CMMC level 2 self-certified, therefore if you are not currently level 2 certified and are interested in this requirement you will need to begin the process to become level 2 certified immediately.
Contract period of performance dates on the solicitation are estimates and are subject to change according to when the effort gets awarded.
Please review and submit any questions related to this solicitation through the PIEE module link found down in the attachments section by October 19th. These questions and answers will be public. QandA will be closed after October 19th.
*Proposals shall be submitted through the solicitation module in PIEE. See the PIEE submittal instructions for directions on submitting proposal documents in PIEE.
*The attachments for this solicitation can be found by clicking the PIEE link found below in the attachments section. The link will take you to the PIEE Module. The PIEE module lists the amended attachments only on the front page. To find the original attachments you need to click on the solicitation number in the Update/Notice section at the bottom. If an amended version of a document does not exist, then the original copy is the current valid copy of the attachment.
Any extensions to this solicitation will be posted here. Solicitation FA822427R0002 was amended to correct the due date to be Nov 3rd, 2026 by 3:00PM Mountain Time. Please refer to the most updated version of the solicitation FA822427R0002. Located in PIEE
Oct 9th Update Q&A V1 posted with updated questions and answers from industry. FA822427R0002 amendment 0002 posted, see solicitation amendment 0002 for details.
Q and A attachment is posted here. The rest of the solicitation attachments are found by following the PIEE link below.
Oct 15th Update - Q&A Attachment updated to add a question and answer
Oct 29th Update - The solicitation closing date has been extended to Nov 10th at 3:00PM Mountain Time. The solicitation amendment FA822427R00020003 to extend the date has been posted in PIEE. Also, additional responses to Contractor questions are expected to be posted on November 2nd or 3rd.
Nov 5th Update – The solicitation closing date has been extended to Nov 17th at 3:00PM Mountain Time. The Pricing Matrix has been updated to adjust product descriptions and details as needed for 57 items highlighted in yellow, please download through the PIEE link. A minor update to the 52.212-1 Addendum has been made to add in Technical subfactor 5 to the table of contents, download throught he PIEE link update 0003. The QandA attachment has been updated along with many product questions and responses, see Q&A attachments below in the attachment section.
If you have issues submitting your proposal through the PIEE solicitation module, please reach out to the contacts listed on this posting as soon as possible. Make sure to review all solicitation updated and attachments found using the PIEE link below.
Nov 16th update – Amendment 0005 has been posted. This amendment updates the pricing matrix to fix formulas in several cells that were incorrect causing totals to be incorrect. The solicitation is also extended by a day from 17 Nov to 18 Nov by 3:00PM Mountain Time.
Before submitting your proposal through the PIEE solicitation module make sure you have viewed all the solicitation updates amendments 0002-0005.
Update #9 ·
The Ogden Air Logistics Complex (OO-ALC) at Hill Air Force Base, Utah, has a need to contract for comprehensive management and supply of aircraft coatings and sealants. This effort aims to ensure uninterrupted aircraft maintenance operations through robust inventory management, timely delivery, and technical support. This effort will include frequent ordering and quick delivery of specified items. The selected contractor will be responsible for continuous deliveries and support of Coatings and Sealants, including:1. Order Fulfillment and Material Handling: Sourcing, storing, and delivering all required coatings and sealants (see attached list). This includes meeting a strict four (4) hour delivery timeline for urgent requirements and handling specialized materials, such as Premixed Frozen Material (PFM) requiring transit at -80F. The contractor must maintain a minimum of 85% shelf life for all products upon delivery. The contractor will also be responsible for managing shelf-life and ensuring proper storage and handling of the products prior to delivery.2. FMS-3600 Coating Management: For this specialized product, implementing a lock and key ITAR-compliant storage system and maintaining rigorous chain of custody for the material.3. Technical Assistance: Providing technical assistance that includes rapid response (within one business day) to material failures, on-site technical support during monthly visits, product change support, and quality audit reporting.4. Online Ordering System: Furnishing a secure, web-based ordering and tracking system with real-time visibility of lead times and minimum stock levels (MSLS).5. Ramp-Up Plan: Executing a ramp-up plan to achieve full performance readiness within eight (8) months of contract award. The anticipated contract will be a Firm Fixed Priced (FFP) IDIQ to include an 8-month ramp up period, a 5-year ordering period, and a 6-month allowance for remaining deliveries on the back end. Total period of performance is anticipated to be 6 years and 2 months. This is a total small business set-aside. The Government anticipates awarding a single contract. All interested small businesses are encouraged to respond to this solicitation. The Government intends to award a single contract resulting from the solicitation to the responsible offeror whose proposal represents the best value to the Government. This effort requires Contractors to be CMMC level 2 self-certified, therefore if you are not currently level 2 certified and are interested in this requirement you will need to begin the process to become level 2 certified immediately. Contract period of performance dates on the solicitation are estimates and are subject to change according to when the effort gets awarded. Please review and submit any questions related to this solicitation through the PIEE module link found down in the attachments section by October 19th. These questions and answers will be public. QandA will be closed after October 19th. *Proposals shall be submitted through the solicitation module in PIEE. See the PIEE submittal instructions for directions on submitting proposal documents in PIEE. *The attachments for this solicitation can be found by clicking the PIEE link found below in the attachments section. The link will take you to the PIEE Module. The PIEE module lists the amended attachments only on the front page. To find the original attachments you need to click on the solicitation number in the Update/Notice section at the bottom. If an amended version of a document does not exist, then the original copy is the current valid copy of the attachment. Any extensions to this solicitation will be posted here. Solicitation FA822427R0002 was amended to correct the due date to be Nov 3rd, 2026 by 3:00PM Mountain Time. Please refer to the most updated version of the solicitation FA822427R0002. Located in PIEE Q and A V1 posted on 9 Oct with updated questions and answers from industry. FA822427R0002 amendment 0002 posted on 9 Oct. See Solicitation amendment 0002 for details. QandA Attachment is posted here. The rest of the solicitation attachments are found by following the PIEE link below. Oct 15th - QandA Attachment updated to add a question and answer Oct 29th Update - The solicitation closing date has been extended to Nov 10th at 3:00PM Mountain Time. The solicitation amendment FA822427R00020003 to extend the date has been posted in PIEE. Also, additional responses to Contractor questions are expected to be posted on November 2nd or 3rd. Nov 5th Update - The solicitation closing date has been updated to Nov 17th at 3:00PM Mountain Time, see solicitation amendment FA822427R0004 attached. The Pricing Matrix has been updated to adjust product descriptions and details as needed for 57 items highlighted in yellow, please download through the update 0003 below. A minor update to the 52.212-1 Addendum has been made to add in Technical subfactor 5 to the table of contents. The QandA attachment has been updated along with many product questions and responses, see the QandA tab. Nov 16th update - Amendment 0005 has been posted. This amendment updates the pricing matrix to fix formulas in several cells that were incorrect causing totals to be incorrect. The solicitation is also extended by a day from 17 Nov to 18 Nov by 3:00PM Mountain Time. Before submitting your proposal through the PIEE solicitation module make sure you have viewed all the solicitation updates amendments 0002-0005.
Update #8 ·
The Ogden Air Logistics Complex (OO-ALC) at Hill Air Force Base, Utah, has a need to contract for comprehensive management and supply of aircraft coatings and sealants. This effort aims to ensure uninterrupted aircraft maintenance operations through robust inventory management, timely delivery, and technical support. This effort will include frequent ordering and quick delivery of specified items. The selected contractor will be responsible for continuous deliveries and support of Coatings and Sealants, including:
1. Order Fulfillment and Material Handling: Sourcing, storing, and delivering all required coatings and sealants (see attached list). This includes meeting a strict four (4) hour delivery timeline for urgent requirements and handling specialized materials, such as Premixed Frozen Material (PFM) requiring transit at -80F. The contractor must maintain a minimum of 85% shelf life for all products upon delivery. The contractor will also be responsible for managing shelf-life and ensuring proper storage and handling of the products prior to delivery.
2. FMS-3600 Coating Management: For this specialized product, implementing a lock and key ITAR-compliant storage system and maintaining rigorous chain of custody for the material.
3. Technical Assistance: Providing technical assistance that includes rapid response (within one business day) to material failures, on-site technical support during monthly visits, product change support, and quality audit reporting.
4. Online Ordering System: Furnishing a secure, web-based ordering and tracking system with real-time visibility of lead times and minimum stock levels (MSLS).
5. Ramp-Up Plan: Executing a ramp-up plan to achieve full performance readiness within eight (8) months of contract award.
The anticipated contract will be a Firm Fixed Priced (FFP) IDIQ to include an 8-month ramp up period, a 5-year ordering period, and a 6-month allowance for remaining deliveries on the back end. Total period of performance is anticipated to be 6 years and 2 months. This is a total small business set-aside. The Government anticipates awarding a single contract. All interested small businesses are encouraged to respond to this solicitation. The Government intends to award a single contract resulting from the solicitation to the responsible offeror whose proposal represents the best value to the Government.
This effort requires Contractors to be CMMC level 2 self-certified, therefore if you are not currently level 2 certified and are interested in this requirement you will need to begin the process to become level 2 certified immediately.
Contract period of performance dates on the solicitation are estimates and are subject to change according to when the effort gets awarded.
Please review and submit any questions related to this solicitation through the PIEE module link found down in the attachments section by October 19th. These questions and answers will be public. QandA will be closed after October 19th.
*Proposals shall be submitted through the solicitation module in PIEE. See the PIEE submittal instructions for directions on submitting proposal documents in PIEE.
*The attachments for this solicitation can be found by clicking the PIEE link found below in the attachments section. The link will take you to the PIEE Module. The PIEE module lists the amended attachments only on the front page. To find the original attachments you need to click on the solicitation number in the Update/Notice section at the bottom. If an amended version of a document does not exist, then the original copy is the current valid copy of the attachment.
Any extensions to this solicitation will be posted here. Solicitation FA822427R0002 was amended to correct the due date to be Nov 3rd, 2026 by 3:00PM Mountain Time. Please refer to the most updated version of the solicitation FA822427R0002. Located in PIEE
Oct 9th Update Q&A V1 posted with updated questions and answers from industry. FA822427R0002 amendment 0002 posted, see solicitation amendment 0002 for details.
Q and A attachment is posted here. The rest of the solicitation attachments are found by following the PIEE link below.
Oct 15th Update - Q&A Attachment updated to add a question and answer
Oct 29th Update - The solicitation closing date has been extended to Nov 10th at 3:00PM Mountain Time. The solicitation amendment FA822427R00020003 to extend the date has been posted in PIEE. Also, additional responses to Contractor questions are expected to be posted on November 2nd or 3rd.
Nov 5th Update – The solicitation closing date has been extended to Nov 17th at 3:00PM Mountain Time. The Pricing Matrix has been updated to adjust product descriptions and details as needed for 57 items highlighted in yellow, please download through the PIEE link. A minor update to the 52.212-1 Addendum has been made to add in Technical subfactor 5 to the table of contents, download throught he PIEE link update 0003. The QandA attachment has been updated along with many product questions and responses, see Q&A attachments below in the attachment section.
If you have issues submitting your proposal through the PIEE solicitation module, please reach out to the contacts listed on this posting as soon as possible. Make sure to review all solicitation updated and attachments found using the PIEE link below.
Update #7 ·
The Ogden Air Logistics Complex (OO-ALC) at Hill Air Force Base, Utah, has a need to contract for comprehensive management and supply of aircraft coatings and sealants. This effort aims to ensure uninterrupted aircraft maintenance operations through robust inventory management, timely delivery, and technical support. This effort will include frequent ordering and quick delivery of specified items. The selected contractor will be responsible for continuous deliveries and support of Coatings and Sealants, including:
1. Order Fulfillment and Material Handling: Sourcing, storing, and delivering all required coatings and sealants (see attached list). This includes meeting a strict four (4) hour delivery timeline for urgent requirements and handling specialized materials, such as Premixed Frozen Material (PFM) requiring transit at -80F. The contractor must maintain a minimum of 85% shelf life for all products upon delivery. The contractor will also be responsible for managing shelf-life and ensuring proper storage and handling of the products prior to delivery.
2. FMS-3600 Coating Management: For this specialized product, implementing a lock and key ITAR-compliant storage system and maintaining rigorous chain of custody for the material.
3. Technical Assistance: Providing technical assistance that includes rapid response (within one business day) to material failures, on-site technical support during monthly visits, product change support, and quality audit reporting.
4. Online Ordering System: Furnishing a secure, web-based ordering and tracking system with real-time visibility of lead times and minimum stock levels (MSLS).
5. Ramp-Up Plan: Executing a ramp-up plan to achieve full performance readiness within eight (8) months of contract award.
The anticipated contract will be a Firm Fixed Priced (FFP) IDIQ to include an 8-month ramp up period, a 5-year ordering period, and a 6-month allowance for remaining deliveries on the back end. Total period of performance is anticipated to be 6 years and 2 months. This is a total small business set-aside. The Government anticipates awarding a single contract. All interested small businesses are encouraged to respond to this solicitation. The Government intends to award a single contract resulting from the solicitation to the responsible offeror whose proposal represents the best value to the Government.
This effort requires Contractors to be CMMC level 2 self-certified, therefore if you are not currently level 2 certified and are interested in this requirement you will need to begin the process to become level 2 certified immediately.
Contract period of performance dates on the solicitation are estimates and are subject to change according to when the effort gets awarded.
Please review and submit any questions related to this solicitation through the PIEE module link found down in the attachments section by October 19th. These questions and answers will be public. QandA will be closed after October 19th.
*Proposals shall be submitted through the solicitation module in PIEE. See the PIEE submittal instructions for directions on submitting proposal documents in PIEE.
*The attachments for this solicitation can be found by clicking the PIEE link found below in the attachments section. The link will take you to the PIEE Module. The PIEE module lists the amended attachments only on the front page. To find the original attachments you need to click on the solicitation number in the Update/Notice section at the bottom. If an amended version of a document does not exist, then the original copy is the current valid copy of the attachment.
Any extensions to this solicitation will be posted here. Solicitation FA822427R0002 was amended to correct the due date to be Nov 3rd, 2026 by 3:00PM Mountain Time. Please refer to the most updated version of the solicitation FA822427R0002. Located in PIEE
Q and A V1 posted on 9 Oct with updated questions and answers from industry.
FA822427R0002 amendment 0002 posted on 9 Oct. See Solicitation amendment 0002 for details.
Q and A Attachment is posted here. The rest of the solicitation attachments are found by following the PIEE link below.
Oct 15th - Q&A Attachment updated to add a question and answer
Oct 29th Update - The solicitation closing date has been extended to Nov 10th at 3:00PM Mountain Time. The solicitation amendment FA822427R00020003 to extend the date has been posted in PIEE. Also, additional responses to Contractor questions are expected to be posted on November 2nd or 3rd.
Update #6 ·
The Ogden Air Logistics Complex (OO-ALC) at Hill Air Force Base, Utah, has a need to contract for comprehensive management and supply of aircraft coatings and sealants. This effort aims to ensure uninterrupted aircraft maintenance operations through robust inventory management, timely delivery, and technical support. This effort will include frequent ordering and quick delivery on specified items. The selected contractor will be responsible for continuous deliveries and support of Coatings and Sealants, including:
1. Order Fulfillment and Material Handling: Sourcing, storing, and delivering all required coatings and sealants (see attached list). This includes meeting a strict four (4) hour delivery timeline for urgent requirements and handling specialized materials, such as Premixed Frozen Material (PFM) requiring transit at -80F. The contractor must maintain a minimum of 85% shelf life for all products upon delivery. The contractor will also be responsible for managing shelf-life and ensuring proper storage and handling of the products prior to delivery.
2. FMS-3600 Coating Management: For this specialized product, implementing a lock and key ITAR-compliant storage system and maintaining rigorous chain of custody for the material.
3. Technical Assistance: Providing technical assistance that includes rapid response (within one business day) to material failures, on-site technical support during monthly visits, product change support, and quality audit reporting.
4. Online Ordering System: Furnishing a secure, web-based ordering and tracking system with real-time visibility of lead times and minimum stock levels (MSLS).
5. Ramp-Up Plan: Executing a ramp-up plan to achieve full performance readiness within eight (8) months of contract award.
The anticipated contract will be a Firm Fixed Priced (FFP) IDIQ to include an 8-month ramp up period, a 5-year ordering period, and a 6-month allowance for remaining deliveries on the back end. Total period of performance is anticipated to be 6 years and 2 months. This is a total small business set-aside. The Government anticipates awarding a single contract. All interested small businesses are encouraged to respond to this solicitation. The Government intends to award a single contract resulting from the solicitation to the responsible offeror whose proposal represents the best value to the Government.
This effort requires Contractors to be CMMC level 2 self-certified, therefore if you are not currently level 2 certified and are interested in this requirement you will need to begin the process to become level 2 certified immediately.
Contract period of performance dates on the solicitation are estimates and are subject to change according to when the effort gets awarded.
Please review and submit any questions related to this solicitation through the PIEE module link found down in the attachments section by October 19th. These questions and answers will be public. QandA will be closed after October 19th.
*Proposals shall be submitted through the solicitation module in PIEE. See the PIEE submittal instructions for directions on submitting proposal documents in PIEE.
*The attachements for this solicitation can be found by clicking the PIEE link found below in the attachments section. The link will take you to the PIEE Module The PIEE module lists the amended attachments only on the front page. To find the original attachments you need to click on the solicitation number in the Update/Notice section at the bottom. If an amended version of a document does not exist, then the original copy is the currrent valid copy of the attachement.
Any extensions to this solicitation will be posted here. Solicitation FA822427R0002 was amended to correct the due date to be Nov 3rd, 2026 by 3:00PM Mountain Time. Please refer to the most updated version of the solicitation FA822427R0002. Located in PIEE
Q and A V1 posted on 9 Oct with updated questions and answers from industry.
FA822427R0002 amendment 0002 posted on 9 Oct. See Solicitation amendment 0002 for details.
Q and A Attachment is posted here. The rest of the solicitation attachments are found by following the PIEE link below.
Oct 15th - Q&A Attachment updated to add a question and answer
Oct 29th Update - The solicitation closing date has been extended to Nov 10th at 3:00PM Mountain Time. The solicitation amendment FA822427R00020003 to extend the date is currently not able to be posted in PIEE due to system issues, but will be posted by Nov 2nd. Also, additional responses to Contractor questions are expected to be posted on November 2nd or 3rd.
Update #5 ·
The Ogden Air Logistics Complex (OO-ALC) at Hill Air Force Base, Utah, has a need to contract for comprehensive management and supply of aircraft coatings and sealants. This effort aims to ensure uninterrupted aircraft maintenance operations through robust inventory management, timely delivery, and technical support. This effort will include frequent ordering and quick delivery on specified items. The selected contractor will be responsible for continuous deliveries and support of Coatings and Sealants, including:
1. Order Fulfillment and Material Handling: Sourcing, storing, and delivering all required coatings and sealants (see attached list). This includes meeting a strict four (4) hour delivery timeline for urgent requirements and handling specialized materials, such as Premixed Frozen Material (PFM) requiring transit at -80F. The contractor must maintain a minimum of 85% shelf life for all products upon delivery. The contractor will also be responsible for managing shelf-life and ensuring proper storage and handling of the products prior to delivery.
2. FMS-3600 Coating Management: For this specialized product, implementing a lock and key ITAR-compliant storage system and maintaining rigorous chain of custody for the material.
3. Technical Assistance: Providing technical assistance that includes rapid response (within one business day) to material failures, on-site technical support during monthly visits, product change support, and quality audit reporting.
4. Online Ordering System: Furnishing a secure, web-based ordering and tracking system with real-time visibility of lead times and minimum stock levels (MSLS).
5. Ramp-Up Plan: Executing a ramp-up plan to achieve full performance readiness within eight (8) months of contract award.
The anticipated contract will be a Firm Fixed Priced (FFP) IDIQ to include an 8-month ramp up period, a 5-year ordering period, and a 6-month allowance for remaining deliveries on the back end. Total period of performance is anticipated to be 6 years and 2 months. This is a total small business set-aside. The Government anticipates awarding a single contract. All interested small businesses are encouraged to respond to this solicitation. The Government intends to award a single contract resulting from the solicitation to the responsible offeror whose proposal represents the best value to the Government.
This effort requires Contractors to be CMMC level 2 self-certified, therefore if you are not currently level 2 certified and are interested in this requirement you will need to begin the process to become level 2 certified immediately.
Contract period of performance dates on the solicitation are estimates and are subject to change according to when the effort gets awarded.
Please review and submit any questions related to this solicitation through the PIEE module link found down in the attachments section by October 19th. These questions and answers will be public. QandA will be closed after October 19th.
*Proposals shall be submitted through the solicitation module in PIEE. See the PIEE submittal instructions for directions on submitting proposal documents in PIEE.
*The attachements for this solicitation can be found by clicking the PIEE link found below in the attachments section. The link will take you to the PIEE Module The PIEE module lists the amended attachments only on the front page. To find the original attachments you need to click on the solicitation number in the Update/Notice section at the bottom. If an amended version of a document does not exist, then the original copy is the currrent valid copy of the attachement.
Any extensions to this solicitation will be posted here. Solicitation FA822427R0002 was amended to correct the due date to be Nov 3rd, 2026 by 3:00PM Mountain Time. Please refer to the most updated version of the solicitation FA822427R0002. Located in PIEE
Q and A V1 posted on 9 Oct with updated questions and answers from industry.
FA822427R0002 amendment 0002 posted on 9 Oct. See Solicitation amendment 0002 for details.
Q and A Attachment is posted here. The rest of the solicitation attachments are found by following the PIEE link below.
Oct 15th - Q&A Attachment updated to add a question and answer
Update #4 ·
The Ogden Air Logistics Complex (OO-ALC) at Hill Air Force Base, Utah, has a need to contract for comprehensive management and supply of aircraft coatings and sealants. This effort aims to ensure uninterrupted aircraft maintenance operations through robust inventory management, timely delivery, and technical support. This effort will include frequent ordering and quick delivery on specified items. The selected contractor will be responsible for continuous deliveries and support of Coatings and Sealants, including:
1. Order Fulfillment and Material Handling: Sourcing, storing, and delivering all required coatings and sealants (see attached list). This includes meeting a strict four (4) hour delivery timeline for urgent requirements and handling specialized materials, such as Premixed Frozen Material (PFM) requiring transit at -80F. The contractor must maintain a minimum of 85% shelf life for all products upon delivery. The contractor will also be responsible for managing shelf-life and ensuring proper storage and handling of the products prior to delivery.
2. FMS-3600 Coating Management: For this specialized product, implementing a lock and key ITAR-compliant storage system and maintaining rigorous chain of custody for the material.
3. Technical Assistance: Providing technical assistance that includes rapid response (within one business day) to material failures, on-site technical support during monthly visits, product change support, and quality audit reporting.
4. Online Ordering System: Furnishing a secure, web-based ordering and tracking system with real-time visibility of lead times and minimum stock levels (MSLS).
5. Ramp-Up Plan: Executing a ramp-up plan to achieve full performance readiness within eight (8) months of contract award.
The anticipated contract will be a Firm Fixed Priced (FFP) IDIQ to include an 8-month ramp up period, a 5-year ordering period, and a 6-month allowance for remaining deliveries on the back end. Total period of performance is anticipated to be 6 years and 2 months. This is a total small business set-aside. The Government anticipates awarding a single contract. All interested small businesses are encouraged to respond to this solicitation. The Government intends to award a single contract resulting from the solicitation to the responsible offeror whose proposal represents the best value to the Government.
This effort requires Contractors to be CMMC level 2 self-certified, therefore if you are not currently level 2 certified and are interested in this requirement you will need to begin the process to become level 2 certified immediately.
Contract period of performance dates on the solicitation are estimates and are subject to change according to when the effort gets awarded.
Please review and submit any questions related to this solicitation through the PIEE module link found down in the attachments section by October 19th. These questions and answers will be public. QandA will be closed after October 19th. Proposals shall be submitted through the solicitation module in PIEE. See the PIEE submittal instructions for directions on submitting proposal documents in PIEE.
Any extensions to this solicitation will be posted here. Solicitation FA822427R0002 was amended to correct the due date to be Nov 3rd, 2026 by 3:00PM Mountain Time. Please refer to the most updated version of the solicitation FA822427R0002. Located in PIEE
Q and A V1 posted on 9 Oct with updated questions and answers from industry.
FA822427R0002 amendment 0002 posted on 9 Oct. See Solicitation amendment 0002 for details.
Q and A Attachment is posted here. The solicitation attachments are found by following the PIEE link below.
The PIEE Module lists the amended attachments only on the front page. To find the original attachments you need to click on the solicitation number in the Update/Notice section at the bottom. If an amended version of a document does not exist then the original copy is the currrent valid copy of the attachement.
Update #3 ·
The Ogden Air Logistics Complex (OO-ALC) at Hill Air Force Base, Utah, has a need to contract for comprehensive management and supply of aircraft coatings and sealants. This effort aims to ensure uninterrupted aircraft maintenance operations through robust inventory management, timely delivery, and technical support. This effort will include frequent ordering and quick delivery on specified items. The selected contractor will be responsible for continuous deliveries and support of Coatings and Sealants, including:
1. Order Fulfillment and Material Handling: Sourcing, storing, and delivering all required coatings and sealants (see attached list). This includes meeting a strict four (4) hour delivery timeline for urgent requirements and handling specialized materials, such as Premixed Frozen Material (PFM) requiring transit at -80F. The contractor must maintain a minimum of 85% shelf life for all products upon delivery. The contractor will also be responsible for managing shelf-life and ensuring proper storage and handling of the products prior to delivery.
2. FMS-3600 Coating Management: For this specialized product, implementing a lock and key ITAR-compliant storage system and maintaining rigorous chain of custody for the material.
3. Technical Assistance: Providing technical assistance that includes rapid response (within one business day) to material failures, on-site technical support during monthly visits, product change support, and quality audit reporting.
4. Online Ordering System: Furnishing a secure, web-based ordering and tracking system with real-time visibility of lead times and minimum stock levels (MSLS).
5. Ramp-Up Plan: Executing a ramp-up plan to achieve full performance readiness within eight (8) months of contract award.
The anticipated contract will be a Firm Fixed Priced (FFP) IDIQ to include an 8-month ramp up period, a 5-year ordering period, and a 6-month allowance for remaining deliveries on the back end. Total period of performance is anticipated to be 6 years and 2 months. This is a total small business set-aside.
The Government anticipates awarding a single contract. All interested small businesses are encouraged to respond to this solicitation. The Government intends to award a single contract resulting from the solicitation to the responsible offeror whose proposal represents the best value to the Government.
This effort requires Contractors to be CMMC level 2 self-certified, therefore if you are not currently level 2 certified and are interested in this requirement you will need to begin the process to become level 2 certified immediately.
Contract period of performance dates on the solicitation are estimates and are subject to change according to when the effort gets awarded. Please review and submit any questions related to this solicitation through the PIEE module link found down in the attachments section by October 19th. These questions and answers will be public. Q&A will be closed after October 19th.
Proposals shall be submitted through the solicitation module in PIEE. See the PIEE submittal instructions for directions on submitting proposal documents in PIEE. Any extensions to this solicitation will be posted here. Solicitation FA822427R0002 was amended to correct the due date to be Nov 3rd, 2026 by 3:00PM Mountain Time. Please refer to solicitation FA822427R00020001. No other changes were made form the original version.
Click the PIEE link below to get to the attachments. Q&A questions can also be posted in the PIEE module.
Q&A V1 posted on 9 Oct with updated questions and anwsers from industry.
Update #2 ·
The Ogden Air Logistics Complex (OO-ALC) at Hill Air Force Base, Utah, has a need to contract for comprehensive management and supply of aircraft coatings and sealants. This effort aims to ensure uninterrupted aircraft maintenance operations through robust inventory management, timely delivery, and technical support. This effort will include frequent ordering and quick delivery on specified items. The selected contractor will be responsible for continuous deliveries and support of Coatings and Sealants, including:
1. Order Fulfillment and Material Handling: Sourcing, storing, and delivering all required coatings and sealants (see attached list). This includes meeting a strict four (4) hour delivery timeline for urgent requirements and handling specialized materials, such as Premixed Frozen Material (PFM) requiring transit at -80F. The contractor must maintain a minimum of 85% shelf life for all products upon delivery. The contractor will also be responsible for managing shelf-life and ensuring proper storage and handling of the products prior to delivery.
2. FMS-3600 Coating Management: For this specialized product, implementing a lock and key ITAR-compliant storage system and maintaining rigorous chain of custody for the material.
3. Technical Assistance: Providing technical assistance that includes rapid response (within one business day) to material failures, on-site technical support during monthly visits, product change support, and quality audit reporting.
4. Online Ordering System: Furnishing a secure, web-based ordering and tracking system with real-time visibility of lead times and minimum stock levels (MSLS).
5. Ramp-Up Plan: Executing a ramp-up plan to achieve full performance readiness within eight (8) months of contract award.
The anticipated contract will be a Firm Fixed Priced (FFP) IDIQ to include an 8-month ramp up period, a 5-year ordering period, and a 6-month allowance for remaining deliveries on the back end. Total period of performance is anticipated to be 6 years and 2 months. This is a total small business set-aside.
The Government anticipates awarding a single contract. All interested small businesses are encouraged to respond to this solicitation. The Government intends to award a single contract resulting from the solicitation to the responsible offeror whose proposal represents the best value to the Government.
This effort requires Contractors to be CMMC level 2 self-certified, therefore if you are not currently level 2 certified and are interested in this requirement you will need to begin the process to become level 2 certified immediately.
Contract period of performance dates on the solicitation are estimates and are subject to change according to when the effort gets awarded. Please review and submit any questions related to this solicitation through the PIEE module link found down in the attachments section by October 19th. These questions and answers will be public. Q&A will be closed after October 19th.
Proposals shall be submitted through the solicitation module in PIEE. See the PIEE submittal instructions for directions on submitting proposal documents in PIEE. Any extensions to this solicitation will be posted here. Solicitation FA822427R0002 was amended to correct the due date to be Nov 3rd, 2026 by 3:00PM Mountain Time. Please refer to solicitation FA822427R00020001. No other changes were made form the original version.
Click the PIEE link below to get to the attachments. Q&A questions can also be posted in the PIEE module.
Update #1 ·
The Ogden Air Logistics Complex (OO-ALC) at Hill Air Force Base, Utah, has a need to contract for comprehensive management and supply of aircraft coatings and sealants. This effort aims to ensure uninterrupted aircraft maintenance operations through robust inventory management, timely delivery, and technical support. This effort will include frequent ordering and quick delivery on specified items. The selected contractor will be responsible for continuous deliveries and support of Coatings and Sealants, including:
1. Order Fulfillment and Material Handling: Sourcing, storing, and delivering all required coatings and sealants (see attached list). This includes meeting a strict four (4) hour delivery timeline for urgent requirements and handling specialized materials, such as Premixed Frozen Material (PFM) requiring transit at -80F. The contractor must maintain a minimum of 85% shelf life for all products upon delivery. The contractor will also be responsible for managing shelf-life and ensuring proper storage and handling of the products prior to delivery.
2. FMS-3600 Coating Management: For this specialized product, implementing a lock and key ITAR-compliant storage system and maintaining rigorous chain of custody for the material.
3. Technical Assistance: Providing technical assistance that includes rapid response (within one business day) to material failures, on-site technical support during monthly visits, product change support, and quality audit reporting.
4. Online Ordering System: Furnishing a secure, web-based ordering and tracking system with real-time visibility of lead times and minimum stock levels (MSLS).
5. Ramp-Up Plan: Executing a ramp-up plan to achieve full performance readiness within eight (8) months of contract award.
The anticipated contract will be a Firm Fixed Priced (FFP) IDIQ to include an 8-month ramp up period, a 5-year ordering period, and a 6-month allowance for remaining deliveries on the back end. Total period of performance is anticipated to be 6 years and 2 months. This is a total small business set-aside.
The Government anticipates awarding a single contract. All interested small businesses are encouraged to respond to this solicitation. The Government intends to award a single contract resulting from the solicitation to the responsible offeror whose proposal represents the best value to the Government.
This effort requires Contractors to be CMMC level 2 self-certified, therefore if you are not currently level 2 certified and are interested in this requirement you will need to begin the process to become level 2 certified immediately.
Contract period of performance dates on the solicitation are estimates and are subject to change according to when the effort gets awarded. Please review and submit any questions related to this solicitation through the PIEE module link found down in the attachments section by October 19th. These questions and answers will be public. Q&A will be closed after October 19th.
Proposals shall be submitted through the solicitation module in PIEE. See the PIEE submittal instructions for directions on submitting proposal documents in PIEE. Any extensions to this solicitation will be posted here. Solicitation FA822427R0002 was amended to correct the due date to be Nov 3rd, 2026 by 3:00PM Mountain Time. Please refer to solicitation FA822427R00020001. No other changes were made form the original version.
Files
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Process Gases, Hill Air Force Base | Air Force Sustainment Center | Total Small Business | |
| Power Supply Assembly | Air Force Sustainment Center | Total Small Business | |
| ICBM Bulkhead Assembly | Aviation | No set-aside | |
| Polyurethane coatin | Construction and Equipment | No set-aside | |
| Oerlikon Metco Thermal Spray Equipment | Air Force Sustainment Center | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity