Air Force Personnel Center, B-Wing, Building 499
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W9126G21R3102
- Agency
-
ENDIST Fort Worth
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Y1AA Construction Of Office Buildings
- Place of performance
- Jbsa Randolph TX 78150, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The United States Army Corps of Engineers seeks to award a design-bid-build contract for the construction of additional administrative space at the Air Force Personnel Center B-Wing Building 499 on Joint Base San Antonio-Randolph Air Force Base in Texas. The scope of work includes the construction of a new reinforced concrete and structural steel building of approximately 25,000-100,000 square feet with exterior finishes, HVAC, fire protection, utilities, site improvements, security provisions, and communications infrastructure. Interested parties must register at beta.sam.gov by June 11, 2021 to receive the RFP. Proposals will be evaluated based on technical qualifications, past performance, and price.
There is no set-aside designation. The project involves NAICS codes 236220 and 237910 with an estimated value between $25-100 million. The place of performance is Universal City, Texas. Work will include structural, electrical, plumbing, HVAC and ductwork trade packages and must meet DoD antiterrorism and force protection requirements. The United States Army Corps of Engineers District Fort Worth will oversee the design-bid-build project completed in compliance with applicable codes and regulations.
Notice text
6 versions
Update #6 · Latest ·
*********************************************Amendment 0004 Posted See attached SF 30 ***********************************************
***********************************************Amendment 0003 Posted See attached SF 30***********************************************
**********************************************Amendment 0002 Posted See attached SF 30 ************************************************
**********************************************See attachment for site visit sign in sheet*******************************************************
***********************************************AMENDMENT 0001 POSTED SEE ATTACHED SF 30*****************************************
This is a readvertisement of solicitation W9126G20R0091. Anyone that registered as an interested party for that solicitation or submitted any questions will need to reregister and review the solicitation package. United States Army Corps of Engineers (USACE) does not provide a Bidders List or General Contractors List, you may register as an interested party at beta.sam.gov under this solicitation.
This solicitation is a Design Bid Build for the additional administrative space for the AFPC on Joint Base San Antonio- Randolph AFB. The B-Wing is intended to tie the AFPC campus together, linking critical mission components to create an efficient and cohesive operation. The construction will include a reinforced concrete and structural steel building; steel-reinforced pre-cast concrete panel exterior, finished with stucco, roof system with red clay tile; mansard condition at the edge; HVAC system, fire protection, all utilities, security provisions, site improvements, exterior stairs & ramps to facility entrances, stamped flatwork at the new patio which provides outdoor Porch Call gatherings for the AFPC employees, storm sewer, sanitary sewer, water lines, access drives, and sidewalks, communications infrastructure; and all other necessary support infrastructure to ensure a complete and usable facility. In addition, this project shall include demolition of sidewalks, asphalt and concrete pavement, curb and gutter, and storm sewer located on the existing site. The total project area of the new construction site is roughly 2 acres. No new parking is associated with this project, but concrete flatwork will provide accessible access to the new facility from existing parking lots. Security and Force Protection will be required along with Contractor Furnished Contractor Installed Equipment (CFCI). The work will involve but not limited to:
• Structural;
• Electrical;
• Vertical and Horizontal Work
• Plumbing;
• HVAC and
• Duct work.
This project will comply with DoD Antiterrorism/force protection requirements per UFC 4-010-01. The Contractor shall provide all supervision, labor, materials, equipment, supplies, and transportation necessary to perform on Air Force Personnel Center (AFPC), B-Wing, Building 499, on Joint Base San Antonio - Randolph AFB, Texas as specified in the Statement of Work and Design Plans that will be attached to the future Request for Proposal (RFP). All work shall comply with all State, local and Federal laws and regulations, and applicable code requirements.
The United States Army Corps of Engineers (USACE) is committed to excellence in the construction activity for this requirement. The construction of this project shall achieve the highest quality of operations and aesthetics in meeting the requirements of the design while at the same time being cost effective.
The magnitude of construction is estimated to be between $25,000,000 and $100,000,000.
(See attached solicitation for additional details)
Update #5 ·
***********************************************Amendment 0003 Posted See attached SF 30***********************************************
**********************************************Amendment 0002 Posted See attached SF 30 ************************************************
**********************************************See attachment for site visit sign in sheet*******************************************************
***********************************************AMENDMENT 0001 POSTED SEE ATTACHED SF 30*****************************************
This is a readvertisement of solicitation W9126G20R0091. Anyone that registered as an interested party for that solicitation or submitted any questions will need to reregister and review the solicitation package. United States Army Corps of Engineers (USACE) does not provide a Bidders List or General Contractors List, you may register as an interested party at beta.sam.gov under this solicitation.
This solicitation is a Design Bid Build for the additional administrative space for the AFPC on Joint Base San Antonio- Randolph AFB. The B-Wing is intended to tie the AFPC campus together, linking critical mission components to create an efficient and cohesive operation. The construction will include a reinforced concrete and structural steel building; steel-reinforced pre-cast concrete panel exterior, finished with stucco, roof system with red clay tile; mansard condition at the edge; HVAC system, fire protection, all utilities, security provisions, site improvements, exterior stairs & ramps to facility entrances, stamped flatwork at the new patio which provides outdoor Porch Call gatherings for the AFPC employees, storm sewer, sanitary sewer, water lines, access drives, and sidewalks, communications infrastructure; and all other necessary support infrastructure to ensure a complete and usable facility. In addition, this project shall include demolition of sidewalks, asphalt and concrete pavement, curb and gutter, and storm sewer located on the existing site. The total project area of the new construction site is roughly 2 acres. No new parking is associated with this project, but concrete flatwork will provide accessible access to the new facility from existing parking lots. Security and Force Protection will be required along with Contractor Furnished Contractor Installed Equipment (CFCI). The work will involve but not limited to:
• Structural;
• Electrical;
• Vertical and Horizontal Work
• Plumbing;
• HVAC and
• Duct work.
This project will comply with DoD Antiterrorism/force protection requirements per UFC 4-010-01. The Contractor shall provide all supervision, labor, materials, equipment, supplies, and transportation necessary to perform on Air Force Personnel Center (AFPC), B-Wing, Building 499, on Joint Base San Antonio - Randolph AFB, Texas as specified in the Statement of Work and Design Plans that will be attached to the future Request for Proposal (RFP). All work shall comply with all State, local and Federal laws and regulations, and applicable code requirements.
The United States Army Corps of Engineers (USACE) is committed to excellence in the construction activity for this requirement. The construction of this project shall achieve the highest quality of operations and aesthetics in meeting the requirements of the design while at the same time being cost effective.
The magnitude of construction is estimated to be between $25,000,000 and $100,000,000.
(See attached solicitation for additional details)
Update #4 ·
**********************************************Amendment 0002 Posted See attached SF 30 ************************************************
**********************************************See attachment for site visit sign in sheet*******************************************************
***********************************************AMENDMENT 0001 POSTED SEE ATTACHED SF 30*****************************************
This is a readvertisement of solicitation W9126G20R0091. Anyone that registered as an interested party for that solicitation or submitted any questions will need to reregister and review the solicitation package. United States Army Corps of Engineers (USACE) does not provide a Bidders List or General Contractors List, you may register as an interested party at beta.sam.gov under this solicitation.
This solicitation is a Design Bid Build for the additional administrative space for the AFPC on Joint Base San Antonio- Randolph AFB. The B-Wing is intended to tie the AFPC campus together, linking critical mission components to create an efficient and cohesive operation. The construction will include a reinforced concrete and structural steel building; steel-reinforced pre-cast concrete panel exterior, finished with stucco, roof system with red clay tile; mansard condition at the edge; HVAC system, fire protection, all utilities, security provisions, site improvements, exterior stairs & ramps to facility entrances, stamped flatwork at the new patio which provides outdoor Porch Call gatherings for the AFPC employees, storm sewer, sanitary sewer, water lines, access drives, and sidewalks, communications infrastructure; and all other necessary support infrastructure to ensure a complete and usable facility. In addition, this project shall include demolition of sidewalks, asphalt and concrete pavement, curb and gutter, and storm sewer located on the existing site. The total project area of the new construction site is roughly 2 acres. No new parking is associated with this project, but concrete flatwork will provide accessible access to the new facility from existing parking lots. Security and Force Protection will be required along with Contractor Furnished Contractor Installed Equipment (CFCI). The work will involve but not limited to:
• Structural;
• Electrical;
• Vertical and Horizontal Work
• Plumbing;
• HVAC and
• Duct work.
This project will comply with DoD Antiterrorism/force protection requirements per UFC 4-010-01. The Contractor shall provide all supervision, labor, materials, equipment, supplies, and transportation necessary to perform on Air Force Personnel Center (AFPC), B-Wing, Building 499, on Joint Base San Antonio - Randolph AFB, Texas as specified in the Statement of Work and Design Plans that will be attached to the future Request for Proposal (RFP). All work shall comply with all State, local and Federal laws and regulations, and applicable code requirements.
The United States Army Corps of Engineers (USACE) is committed to excellence in the construction activity for this requirement. The construction of this project shall achieve the highest quality of operations and aesthetics in meeting the requirements of the design while at the same time being cost effective.
The magnitude of construction is estimated to be between $25,000,000 and $100,000,000.
(See attached solicitation for additional details)
Update #3 ·
**********************************************See attachment for site visit sign in sheet*******************************************************
***********************************************AMENDMENT 0001 POSTED SEE ATTACHED SF 30*****************************************
This is a readvertisement of solicitation W9126G20R0091. Anyone that registered as an interested party for that solicitation or submitted any questions will need to reregister and review the solicitation package. United States Army Corps of Engineers (USACE) does not provide a Bidders List or General Contractors List, you may register as an interested party at beta.sam.gov under this solicitation.
This solicitation is a Design Bid Build for the additional administrative space for the AFPC on Joint Base San Antonio- Randolph AFB. The B-Wing is intended to tie the AFPC campus together, linking critical mission components to create an efficient and cohesive operation. The construction will include a reinforced concrete and structural steel building; steel-reinforced pre-cast concrete panel exterior, finished with stucco, roof system with red clay tile; mansard condition at the edge; HVAC system, fire protection, all utilities, security provisions, site improvements, exterior stairs & ramps to facility entrances, stamped flatwork at the new patio which provides outdoor Porch Call gatherings for the AFPC employees, storm sewer, sanitary sewer, water lines, access drives, and sidewalks, communications infrastructure; and all other necessary support infrastructure to ensure a complete and usable facility. In addition, this project shall include demolition of sidewalks, asphalt and concrete pavement, curb and gutter, and storm sewer located on the existing site. The total project area of the new construction site is roughly 2 acres. No new parking is associated with this project, but concrete flatwork will provide accessible access to the new facility from existing parking lots. Security and Force Protection will be required along with Contractor Furnished Contractor Installed Equipment (CFCI). The work will involve but not limited to:
• Structural;
• Electrical;
• Vertical and Horizontal Work
• Plumbing;
• HVAC and
• Duct work.
This project will comply with DoD Antiterrorism/force protection requirements per UFC 4-010-01. The Contractor shall provide all supervision, labor, materials, equipment, supplies, and transportation necessary to perform on Air Force Personnel Center (AFPC), B-Wing, Building 499, on Joint Base San Antonio - Randolph AFB, Texas as specified in the Statement of Work and Design Plans that will be attached to the future Request for Proposal (RFP). All work shall comply with all State, local and Federal laws and regulations, and applicable code requirements.
The United States Army Corps of Engineers (USACE) is committed to excellence in the construction activity for this requirement. The construction of this project shall achieve the highest quality of operations and aesthetics in meeting the requirements of the design while at the same time being cost effective.
The magnitude of construction is estimated to be between $25,000,000 and $100,000,000.
(See attached solicitation for additional details)
Update #2 ·
***********************************************AMENDMENT 0001 POSTED SEE ATTACHED SF 30*****************************************
This is a readvertisement of solicitation W9126G20R0091. Anyone that registered as an interested party for that solicitation or submitted any questions will need to reregister and review the solicitation package. United States Army Corps of Engineers (USACE) does not provide a Bidders List or General Contractors List, you may register as an interested party at beta.sam.gov under this solicitation.
This solicitation is a Design Bid Build for the additional administrative space for the AFPC on Joint Base San Antonio- Randolph AFB. The B-Wing is intended to tie the AFPC campus together, linking critical mission components to create an efficient and cohesive operation. The construction will include a reinforced concrete and structural steel building; steel-reinforced pre-cast concrete panel exterior, finished with stucco, roof system with red clay tile; mansard condition at the edge; HVAC system, fire protection, all utilities, security provisions, site improvements, exterior stairs & ramps to facility entrances, stamped flatwork at the new patio which provides outdoor Porch Call gatherings for the AFPC employees, storm sewer, sanitary sewer, water lines, access drives, and sidewalks, communications infrastructure; and all other necessary support infrastructure to ensure a complete and usable facility. In addition, this project shall include demolition of sidewalks, asphalt and concrete pavement, curb and gutter, and storm sewer located on the existing site. The total project area of the new construction site is roughly 2 acres. No new parking is associated with this project, but concrete flatwork will provide accessible access to the new facility from existing parking lots. Security and Force Protection will be required along with Contractor Furnished Contractor Installed Equipment (CFCI). The work will involve but not limited to:
• Structural;
• Electrical;
• Vertical and Horizontal Work
• Plumbing;
• HVAC and
• Duct work.
This project will comply with DoD Antiterrorism/force protection requirements per UFC 4-010-01. The Contractor shall provide all supervision, labor, materials, equipment, supplies, and transportation necessary to perform on Air Force Personnel Center (AFPC), B-Wing, Building 499, on Joint Base San Antonio - Randolph AFB, Texas as specified in the Statement of Work and Design Plans that will be attached to the future Request for Proposal (RFP). All work shall comply with all State, local and Federal laws and regulations, and applicable code requirements.
The United States Army Corps of Engineers (USACE) is committed to excellence in the construction activity for this requirement. The construction of this project shall achieve the highest quality of operations and aesthetics in meeting the requirements of the design while at the same time being cost effective.
The magnitude of construction is estimated to be between $25,000,000 and $100,000,000.
(See attached solicitation for additional details)
Update #1 ·
This is a readvertisement of solicitation W9126G20R0091. Anyone that registered as an interested party for that solicitation or submitted any questions will need to reregister and review the solicitation package. United States Army Corps of Engineers (USACE) does not provide a Bidders List or General Contractors List, you may register as an interested party at beta.sam.gov under this solicitation.
This solicitation is a Design Bid Build for the additional administrative space for the AFPC on Joint Base San Antonio- Randolph AFB. The B-Wing is intended to tie the AFPC campus together, linking critical mission components to create an efficient and cohesive operation. The construction will include a reinforced concrete and structural steel building; steel-reinforced pre-cast concrete panel exterior, finished with stucco, roof system with red clay tile; mansard condition at the edge; HVAC system, fire protection, all utilities, security provisions, site improvements, exterior stairs & ramps to facility entrances, stamped flatwork at the new patio which provides outdoor Porch Call gatherings for the AFPC employees, storm sewer, sanitary sewer, water lines, access drives, and sidewalks, communications infrastructure; and all other necessary support infrastructure to ensure a complete and usable facility. In addition, this project shall include demolition of sidewalks, asphalt and concrete pavement, curb and gutter, and storm sewer located on the existing site. The total project area of the new construction site is roughly 2 acres. No new parking is associated with this project, but concrete flatwork will provide accessible access to the new facility from existing parking lots. Security and Force Protection will be required along with Contractor Furnished Contractor Installed Equipment (CFCI). The work will involve but not limited to:
• Structural;
• Electrical;
• Vertical and Horizontal Work
• Plumbing;
• HVAC and
• Duct work.
This project will comply with DoD Antiterrorism/force protection requirements per UFC 4-010-01. The Contractor shall provide all supervision, labor, materials, equipment, supplies, and transportation necessary to perform on Air Force Personnel Center (AFPC), B-Wing, Building 499, on Joint Base San Antonio - Randolph AFB, Texas as specified in the Statement of Work and Design Plans that will be attached to the future Request for Proposal (RFP). All work shall comply with all State, local and Federal laws and regulations, and applicable code requirements.
The United States Army Corps of Engineers (USACE) is committed to excellence in the construction activity for this requirement. The construction of this project shall achieve the highest quality of operations and aesthetics in meeting the requirements of the design while at the same time being cost effective.
The magnitude of construction is estimated to be between $25,000,000 and $100,000,000.
(See attached solicitation for additional details)
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| Air Force Personnel Center, B-Wing, Building 499 | Award Notice | |
| This notice | Solicitation | |
| Air Force Personnel Center, B-Wing, Building 499, Construction | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Request for information/sources sought | ENDIST Albuquerque | No set-aside | |
| B21 Utilities & Site Improvements, Communications & Electrical Infrastructure, Dyess AFB OT Feasibility & Business Feedback | ENDIST Fort Worth | No set-aside | |
| Unaccompanied Enlisted Personnel Housing (UEPH) Barracks# 103 | ENDIST Fort Worth | No set-aside | |
| RFI: Fort Wolters H Barracks | ENDIST Fort Worth | No set-aside | |
| Design-Build Maintenance and Repair Army Reserve (MRAR) of Equipment Concentration Site (ECS), B-56767, at North Fort Hood, TX | ENDIST Louisville | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity