AF tencap RFI: procurement of C-130/L-382 non-permanent roll-on/roll-off beyond line-of-sight (BLOS) dual-band satcom & GPS hatch systems
Closed Pre-Solicitation Posted
- Solicitation number
- TNCP_26_0001
- Agency
-
Lifecycle Management Center
Air Force Materiel Command, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 334511 Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
- PSC
- Not on record
- Place of performance
- Colorado Springs, Colorado, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Air Force Lifecycle Management Center (AFLCMC) Sensors Division, through AF TENCAP, is conducting market research to identify vendors capable of designing, developing, and delivering high-bandwidth Beyond-Line-of-Sight (BLOS) 45cm Ku/Ka-Band Satellite Communication (SATCOM) and GPS Hatch systems for C-130/L-382 aircraft, with responses due August 21, 2026. This is a Request for Information (RFI), not a solicitation; no contract will be awarded and no funds have been authorized.
The SATCOM systems and GPS hatches must have pre-existing Department of War certified airworthiness or be currently in the certification process. Systems install via Roll-on/Roll-off (Ro/Ro) hatch replacement to maintain fleet operational readiness and minimize aircraft downtime. The solution must be network agnostic, exclude commercial SATCOM modems, and use only software-defined radios (specifically the x410 modem) for modem functions such as digitization.
AF TENCAP seeks vendors with existing Technology Readiness Level 9 (TRL 9) prototypes ready for small-quantity production delivery within one year to support future DAF Battle Network integration and communications with various mission partners across C-130/L-382 aircraft variants.
Responses are limited to 20 pages (excluding cover page) and must include company information (name, address, contact, CAGE Code, NAICS code 334511 if applicable, website, annual revenue, employee count, ownership status), prime or subcontractor preference, small business utilization percentages, current contract performance details, and technical compliance narrative. Proprietary information must be clearly marked. All prospective contractors must be registered in SAM. Questions are due August 18, 2026, 4:00 PM EST. Responses should be submitted electronically to Mr. Jordan Poling (jordan.poling@us.af.mil, 385-635-3800). Both U.S. and non-U.S. firms may respond.
Notice text
2 versions
Update #2 · Latest ·
AF TENCAP, through the Air Force Lifecycle Management Center (AFLCMC) Sensors Division (AFLCMC/WIN), is conducting market research to identify vendors who have designed, developed, and delivered a high-bandwidth Beyond-Line-of-Sight (BLOS) 45cm Ku/Ka-Band Satellite Communication (SATCOM) system and associated GPS Hatch assemblies. These SATCOM systems and GPS hatches need to have pre-existing Department of War (DoW) certified airworthiness, or currently in the process of certification, and support operational missions across C-130 / L-382 aircraft variants. The systems must be installed via a Roll-on/Roll-off (Ro/Ro) hatch replacement capability to maintain fleet operational readiness and prevent aircraft down-time. The solution should be network agnostic, not to include any commercial SATCOM modems, and only be compatible with software defined radios for modem functions such as digitization. The system will provide network connectivity for a C-130 variant for future DAF Battle Network integration and communications with various mission partners. Air Force TENCAP is seeking vendors who have recently delivered existing TRL 9 prototypes, ready for small quantity production units to be delivered within the next year.
14 August 2026 Amended RFI Language:
This description supercedes the original description posted on 03 August 2026.
AF TENCAP, through the Air Force Lifecycle Management Center (AFLCMC) Sensors Division (AFLCMC/WIN), is conducting market research to identify vendors who have designed, developed, and delivered a high-bandwidth Beyond-Line-of-Sight (BLOS) 45cm Ku/Ka-Band Satellite Communication (SATCOM) system and associated GPS Hatch assemblies. These SATCOM systems and GPS hatches need to have pre-existing Department of War (DoW) certified airworthiness, or currently in the process of certification, and support operational missions across C-130 / L-382 aircraft variants. The systems must be installed via a Roll-on/Roll-off (Ro/Ro) hatch replacement capability to maintain fleet operational readiness and prevent aircraft down-time. The solution should be network agnostic, not to include any commercial SATCOM modems, and only be compatible with software defined radios for modem functions such as digitization. Specifically, the system will need to be compatible with the x410 modem. The system will provide network connectivity for a C-130 variant for future DAF Battle Network integration and communications with various mission partners. Air Force TENCAP is seeking vendors who have recently delivered existing TRL 9 prototypes, ready for small quantity production units to be delivered within the next year.
Update #1 ·
AF TENCAP, through the Air Force Lifecycle Management Center (AFLCMC) Sensors Division (AFLCMC/WIN), is conducting market research to identify vendors who have designed, developed, and delivered a high-bandwidth Beyond-Line-of-Sight (BLOS) 45cm Ku/Ka-Band Satellite Communication (SATCOM) system and associated GPS Hatch assemblies. These SATCOM systems and GPS hatches need to have pre-existing Department of War (DoW) certified airworthiness, or currently in the process of certification, and support operational missions across C-130 / L-382 aircraft variants. The systems must be installed via a Roll-on/Roll-off (Ro/Ro) hatch replacement capability to maintain fleet operational readiness and prevent aircraft down-time. The solution should be network agnostic, not to include any commercial SATCOM modems, and only be compatible with software defined radios for modem functions such as digitization. The system will provide network connectivity for a C-130 variant for future DAF Battle Network integration and communications with various mission partners. Air Force TENCAP is seeking vendors who have recently delivered existing TRL 9 prototypes, ready for small quantity production units to be delivered within the next year.
Files
| File | Type | Posted |
|---|---|---|
| TENCAP RFI_LURCHER_Final_Amended_14 August 2026.pdf | ||
| TENCAP RFI_Final.pdf |
Similar open opportunities
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity